Loading...
01-0468-012 Eusebio M. Mora AIR CONDITIONING SPECIFICATIONS___-- -- Architect Fla. Lic. # AR0011732 1 THE WORK THAT IS TO BE DONE UNDER THIS HEADING INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS, EQUIPMENT, PERMIT_ FEES, INPECTIONS, TEST, INSURANCE, ETC. REQUIRED FOR THE CCMPLt=.T19N - OF THE AIR CONDITIONING SYSTEM SHOWN ON THE DRAWINCS_AT -FOR:__ - LISTED BELOW. - 2 CONTRACTOR SHALL VISIT THE SITE TO BECOME FAMILIAR WITH ALL EXISTING CONDITIONS AND SCOPE OF WORK. CONTRACTOR -SHALL = - SUBMIT ANY DESCREPANCIES TO ARCHITECT-ENGINEER FIFTEEN,-(15) - DAYS PRIOR TO BIDS. THE NATURE THIS PROJECT INVOLVES THE REMODELING OF EXISTING FACILITIES. - 3 INTERRUPTION OF EXISTING FACILITIES AND / OR SERVICES SHALL KEPT TO A MONIMUM AND THE CONTRACTOR SHALL FURNISH ALL MATERIALS REQUIRED VHENEVER TEMPORARY CONNECTIONS ARE NECESSARY TO MAINTAIN CONTINUITY OF SERVICES. COORDINATE ALL INTERRUPTIONS OF SERVICES WITH THE OWNER'S REPRESENTATIVE. 4 VENTILATION DUCTWORK SHALL BE GALVANIZED STEEL WITH GAUGES, DUCT CONSTUTIONS, BRACING AND SUSPENSION IN ACCORDANCE WITH THE RECOMMENDATIONS SET FORTH IN THE LATEST EDITION OF THE ASHRAE GUIDE AND SMACNA STANDARDS. DUCT SIZES SHOWN ARE 9780 Southwest 16th Street AIRSIDE DIMENSION. VERIFY EXACT LOCATION OF DUCT WITH RESPECT TO STRUCTURE BEFORE FABRICATION. Miami, Florida 3 3 1 6 5 5 FLEXIBLE DUCT SHALL BE SELF-SUPPORTING ALUMINUM CONSTRUTION (305) 2 2 9 - 6 8 6 0 WITH 1' THICK BLANKET TYPE INSULATON WITH EXTERIOR VAPOR BARRIER PROVIDE SPIN COLLAR WITH DAMPER AND EXTRACTOR WHERE FLEXIBLE DUCT IS CONNECTED TO RECTANGULAR DUCTWORK. 6 AIR CONDITIONING SUPPLY AND RETURN DUCTWORK SHALL BE 1-1/2" Z R-6 FIBERGLASS U.L 181 LISTED. CLASS 1' AIR DUCTWORK SHALL BE Q FABRICATED IN ACCORDANCE WITH S.M.A.C.N.A. STANDARDS. J 7 ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH THE PROGRESS OF CONSTRUTION AND ITS STRICT COMPLIANCE WITH ALL APPLICABLE CODES AND STANDARDS. 8 VERIFY ALL DIMENSIONS WITH STRUCTURE PRIOR TO ANY FABRICATION O OR INSTALLATION. O 9 SUBMIT SHOP DRAWING OF ALL MATERIALS AND EQUIPMENTFOR J APPROVAL PRIOR TO FABRICATION. LL 10 OBTAIN FULL INFORMATION REGARDING PECULIARITIES AND LIMITATIONS OF SPACE AVAILBLE FOR INSTALLATION OF THE EQUIPMENT AND .J MATERIALS UNDER CONTRACT.PROVIDE READY ACCESSIBILITY Q TO DAMPERS, VALVES AND OTHER APPARATUS, INCLUDING ANY /1 PART OF SYSTEM REQUIRED TO BE REACHED FOR MAINTENANCE V AND OPERATIONS. Z 11 VIBRATION ISOLATION: ALL EQUIPMENT AS PER MANUFACTURER Q RECOMMENDATIONS TO ELIMINATE ANY EQUIPMENT NOISE FROM I BEING HEARD. r, • • ❑ El •• 12 CUT ALL OPENINGS AND CHASES REQUIRED TO ACCOMMODATE W THE WORK UNDER THIS DIVISION AND REPAIR ALL FLOORS, ETC. cc DAMAGED BY SUCH CUTTINGS. ALL WORK DONE UNDER THIS w L HEADING MUST CONFORM IN EVERY RESPECT TO FINISH AND QUALITY MATERIALS AND WORKMANSHIP SPECIFIED UNDER APPROPRIATE SECTIONS FOR THE BUILDING. 13 GUARANTEES: A ALL COMPRESSOR MOTORS ON NEW EQUIPMENT FURNISHED UNDER WIC THIS CONTRACT SHALL HAVE A 5 YEARS PRODUCT GUARANTEE FROM > 5'2"x 5 3 DATE OF START-UP. m B CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP 0 FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN 1 YEAR FROM 411 DATE OF ACCEPTANCE. � 14 TESTING: A ALL REFRIGERANT HIGH SIDE PIPING TO 300 PSIG LOW SIDE TO 150 p PSIG AFTER TESTING EVACUATE SYSTEM TO 28" MERCURY GAUGE PRESSURE WITH VACUUM PUMP.HOLD FOR 25 HOURS WITH PUMP OFF BREAK VACCUM WITH REFRIGERANT. w MASTER BEDROOM B BALANCE AIR SYSTEM TO DELIVER QUANTITIES AND EACH OUTLET o 11'2"x14'8" WITHIN 5 PERCENT USING A.A.B.C. PROCEDURES AND TESTS SUBMIT AIR 8"x12" 1W U)D BALANCE TEST RESULTS FOR APPROVAL PRIOR TO FINAL INSPECTION. DRESSING 150 CFM 15 REFRIGERATION SUCTION PIPING SHALL BE INSULATED WITH 3/4" } INCOAFELX. ARMAFELX INSULATION MAY ONLY BE USED IN NON-PLENUM •• AREAS. FINISH WHERE EXPOSED WITH 2 COATS OF WHITE LATEX PAIN ALL AS PER MANUFACTURER'S INSTRUCTION. 16 ALL REFRIGERANT PIPING SHALL BE TYPE "K" HARD COPPER, TOGETHER WITH WROUGHT COOPER SOLDER. FITTINGS JOINTS SHALL BE MADE WITH Y SILVER SOLDER OR "SILFOS" ALL CONDENSATE DRAIN PIPING TO BE Q SC!-'EDULE 40 TYPE II HIGH IMPACT PVC WITH SLIP JOINT FITTING OF M • M. BATH I THE-SAME MATERIALS WITH AN APPROVED SOLVENT INSTALLED IN A LU 8'9"x 7'0" /x\ h1r" _COMMENDED BY THE FITTING MANUFACTURER. 17 DUCT MOUNTED SMOKE DETECTORS SHALL BE EDWARDS GS MODEL No 62648 IONIZATION DETECTOR OR APPROVED EQUAL. DETECTOR TO BE z O O I WH i INSTALLED PER UL268A DETECTORS SHALL COMPLY WILL ALL .. JLA REQUIREMENTS LISTED ON N.F.P.A. 90A AND TIED TO FIRE ALARM SYSTEM. FLEXA o DW EXNAU9T FAN TNRU RANGE ._ O W/4"[)IA GALV.MET (26 GA) L LL BABY'S ROOM I . KITCHEN DINING ROOM 9'I"x 12'7' DUCT. NUTONE ORE .15 CFM.� O 9'I"x 12'7" 9'I"x 16'4" I F SINK .E EXIST. R-6 0"Lj RIGID DUCT I EXI T E T W t REFRIG. �° Z � W 0 2468 2068 co CLOSET I W rn . . V J O Cd CLOSET I '-' W 2468 I 8" DIAM. V♦ LIVING ROOM I FLEX 0 L C (311"x 1217" I Z 0 n O --�-- g 3 00 I 8"x10" BUJ CD Q BEDROOM 150 CFM 10'9"x 12'7" W (6 7 co CO N f�LO 0 O co FAMILY ROOM cc (�0 10181,x 19T, U w O H 0_ a_ DRAWN BY: EMM CLOSET FOYER CHECKED BY: 5'2"x4'4" 10'6"x4'4" EM M ATTACHMENT NO.: •• ❑ I ATTACHMENT _ Q � DRAWING FILE NO.: 2001-002 DATE: 3/2/2001 SCALE: NOTED SHEET NUMBER: i Mi ECHANICAL FLOOR PLAN 1/4 EXIST. A/C FLOOR AREA = 1080 S.F. OF NEW A/C FLOOR AREA = 719 S.F. 9 TAT