Loading...
1951-412 R"-OLUTICPI No. 412 A XjOLUTTLCN APPROVING A FOLICY ,'U i 'liter, :4:X`P�IdSTUId OF "lATilk LAINSI TAPPING Fc;L�; DEPOSITS By Ttih CUDI:iUI:S�L�a '.rH'1''�ai CU'l TLAIIY DI Tn::�, CI12Y OF SOUTH MIAKI 0. BE IT R4SOLVm BY THE A1AY01j A IIll T112 COUNCIL OF E-L,' CITY OF SUUTII LiIesI;?I, PWRIDA.- 1 That the policy and rules set out below for the extension of water mains and water service to new buildings, for tapping fees and meter deposits, by the Consumers :eater Company within the City Of South Miami, be and the same hereby is approved. 1. Water Slain Extensions (a) Consumers `:later Company will make requested extensions Of its water mains without cost to the customer up to a maximum of 100 feet, provided that extensions will not be required unless the proposed customer produces sufficient proof, acceptable to the Com- pany that a residence, apartment or commercial building will be actually constructed and completed at the location as shown on the application for service. (b) For water main extensions of more than 100 feet, the first 100 feet will be installed at no cost to the customers and the excess distance over 100 feet shall be at the expense of the pro- posed customer who will pay the actual cost of installation of a two- inch galvanized water main, including labor and materials, but not including any s`y".stem betterment items such as valves, valve boxes, tees and plus for future connections, and any other normal water works accessories. The cost to the customer for water main exten®ions will not include water services which are normally installed between the water main and water meter. The size of water main actually in- stalled will be in accordance with standard water works practice without regard to the amount of money paid by the proposed customer to the Consumers Idater Company. (c) Nhenever a proposed customer has complied with the provisions of paragraphs (a) and (b) above and has paid to Consumers Water Company the actual cost for construction of a water main, he shall then be entitled to a refund for any future connections to the water main extension, as shown in subparagraphs (1) or (2) below, as may be elected by the customer at the time of actual payment of money to the Company;