09-19-00 (3)2
A2.1
FRONT VIEW
ELEVATION - OPTION °A°
3/16" — 1' -0"
SINGLE — CARRIER 'POWER
Jk TOP OF CROSS
IV +70' -0" AFF
II
II
II
858HDDH90 —SX ANTENNA II
(INSIDE OF CROSS)
STEALTH CROSS
(TO BE PAINTED WHITE)
U
I I
I I
I I
NEW BOXED OUT CHASE I I
TO CONCEAL CABLE AND
STRUCTURAL SUPPORTS I I
PAINTED TO MATCH EXIST. I I
CHURCH)
I I
I I
I I
I I
I I
I I
I I
EXISTING I I
CHURCH
I I
I I
I I
I I
I I
I I
I I
I I
I I
NEW SUPPORT
STRUCTURE I I
BEYOND I I
I I
rill I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
NEW FOOTING
(SEE STRUCTURAL DWGS.) I I
I
I I
I I
I I
N
I
x
a
I
N
SIDE VTFTN
I
I,, /LA_)
SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN
APPROVAL, ALL PREVIOUS ISSUES OF THIS DRAWING ARE
SUPERSEDED BY THE LATEST REVISION, ALL DRAWINGS
AND SPECIFICATIONS REMAIN THE PROPERTY OF
MORRISON HERSHFIELD CORPORATION. NEITHER
MORRISON HERSHFIELD NOR THE ARCHITECT WILL
BE PROVIDING CONSTRUCTION REVIEW OF THIS PROJECT.
7
6
5
4
3
2
1
08/22/00
A/C UNIT
A
06/12/00
ISSUED FOR REVIEW
No.
Date
Action
oBE_LLSOUTH Mobility
M 0 R R I S 0 N
H E R S H F I E L D
373D Chamblee Tucker Rd. Atlanta, GA. 30341
Tel: (770) 939 2370 Fax: (770) 934 9476
Project:
EHGO CELL SITE
HOPE LUTHERAN CHURCH
6330 BIRD ROAD
MIAMI, FLORIDA
Drawing Title:
TOWER ELEVATION
OPTIONS A
Scale:
Project No.
AS SHOWN
6003708
Designer:
Date:
RMG
08/16/00
Drawn By:
Checked By:
RMG
Drawing File:
Client Approval
Revision No.
Drawing No.
A
A2.1