Loading...
09-18-01 (19)N N_ C, Lu Q d C3 M 0 O UJ c21 Q THE CONTRACT DOCUMENTS the contract documents consist of the Owner - Contractor Agreement, these Conditions, the drawings, specifications, and all Addenda issued prior to and all Modifications issued after execution of the Contract. CHANGE ORDERS A Change Order is a written order to the Contractor signed by the Owner and the Architect, issued after execution of the Contract, authorizing a change in the Work or an adjustment in the Contract Sum or the Contract Time. THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction. ARCHITECT The Architect will be the Owner's representative during construction and until final payment is due. The Architect will not be responsible for and will not have control or charge of construction means, methods, technicjues, sequences or procedures, or for safety precautions. and programs in connection with the Work The Architect shall at all times have access to the Work wherever it is In preparation and progress. The Architect will review and approve or take other appropriate action upon Contractor's submittals such as Shop Drawings, Product Data and Samples. The Architect's approval of a specific item shall not indicate approval of an assembly of which the item is a component. Upon authorization by the Owner additional compensation, the Architect will render extensive Construction Administration as described in the AIA Standard Documents. OWNER The term Owner means the Owner or his authorized representative. The Owner shall furnish all surveys describing the physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. The Owner shall secure and pay for necessary approvals, easements, assessments and charges required for the construction, The Owner, upon written order, may stop the work and contract the remaining work with another entity deducting through a Change Order the cost of correcting any deficiency, including compensation for the Architect's additional services made necessary by such default, neglect or failure. CONTRACTOR The Contractor shall carefully study and compare the Contract Documents and shall at once report to the Architect any error, inconsistency or omission he may discover. The Contractor shall supervise and direct the Work, using his best skill and attention. Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay For all labor, materials, equipment, tools, constructing equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution and completion of the Work, shall secure and pay For the building permit and for all other permits and governmental fees, licenses and inspections necessary for the proper execution and completion of the Work The Contractor shall maintain at the site for the Owner one record copy of all Drawings, Specifications, Addenda, Change Orders and other Modifications, in good order and marked currently to record all changes made during construction, and approved Shop Drawings, Product Data and Samples. The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish caused by his operations. SUBCONTRACTORS A subcontractor is a person or entity who has a direct contract with the Contractor to perform any of the Work at the site. The Contractor shall furnish to the Owner and the Architect in writing the name of the persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each of the principal portions of the Work, The Owner reserves the right to perform work related to the Project with his own Forces, and to award separate contracts in connection with other portions of the Project. ARBITRATION All claims, disputes and other matters in question between the Contractor and the Owner relating to the work shall be decided by arbitration in accordance with the Construction Industry Arbitration Rubs of the American Arbitration Association. SUBSTANTIAL COMPLETION The Date of Substantial Completion of the Work is the Date certified by the Architect when construction is sufficiently complete, so the Owner can occupy or utilize the Work INTERIOR ALTERATION 1909 CAFE 5710 SW. AVE. BIRD ROAD, SOUTH MIAMI, FL. INDEX TO DRAWINGS ARCP ITE CTURE A -1 Locaition Plan A-2 Flooir plan A -3 Schedules STRUCTUIRAL: 9-1 Demolition plan 4 Schedules and Details S. LU, 40st. 5T. (BIRD RD.,) I PLUMBING: P -1 Floor Plan 5ehedulsa.,8 and Details H.v.A.C. M-1 Floor Plan ,Schedules and Details ELECTRICAL: E -i Floor Plan E -2 5hedules and Details (EX15T ING 5LDG 4 PARKING) LEGAL DE-5CRIFTION LOT 3 THRU 10 (INCLUSIVE, LESS THE NORTH 20 FEET, AND LOT5 15 TPRU 24 INCLUSIVE, WESTERPIELD 1"1'1ANOR SECTIONS ONE AND TWO ACCORDING TO THE PLAT THEREOF, A5 RECORDED IN PLAT BOOK 16 AT PAGE 41 OF THE PUBLIC RECORDS OF MIAMI -DADS COUNTY, FL. S. W. 41st. 5T. � - NUMBER NAME AREA SPACE REQUIER. CAR SPACES I Sul SEWING STORAGE 280 OF 300 0.9 2 t 3 ANTIQUE SHOP 1,930 SP 300 26.1 4 t 5 kARAlE SCHOOL 4,500 300 150 6 BEEHIVE NATURAL POOPS 1,020 SF 300 3.4 'l BELEN COITURE 1,020 8F 300 3.4 8 N SEWING CENTER 2,040 SF 300 6.8 9 SHOE REPAIR 1,4% 8F 300 4.9 10 LUCILA BALEW 8MET 1360 SF 300 4.53 it OPTICAL 2040 SF 200 102 12 TRAVEL AGENCY 600 SF 250 2.4 13 ALTERATIONS 600 W 300 2.0 14 FROPOSED 1909 CAIN INC. 600 8F 150 40 15 i909 CAFE INC. 600 8F 150 40 16 ANTIQUE CENTER 1,305 SF 300 4.4 11 ANTIQUE CENTER 1 2134 W 1 300 9.1 TOTAL REQUIER, 101.2 TOTAL EXISTING 103.6 HANDICAP 3.0 5Y1MeOL5 LEGEND MATERIAL5 B ;SECTION NO, 3 DETAIL NO. REINF. C.M.U. A-5 ;SHEET NO. A -3 SHEET NO. CONC. LARGE SCALE !ELEVATION NO. CONC. SMALL SCALE 3 � B2 DOOR SYMBOL �� ;SHEET NO. INTERIOR PARTITION 1 a M a 11NT- ELEv. NO. FIN15- ELEVATION � EXTERIOR WALL - ISHEET NO. SYMBOL A PARTITION TYPE 3 LEGEND wrScC.r. tom! ■rrrrr rNyrNM SAND / STUCCO EARTH BATT INSULATION RIGID INSULATION STEED.. EXISTING PARTITION OR WALL TO REMAIN EXISTING PARTITION OR WALL. TO BE DEMOLISHED v RX. N 1_ r OM C6 A. TAQUECHEL ASSOC. INC. ARCHITECTS - ENGINEERS - PLANNERS 4848 S.W. 74th. COURT,MIAMI FL. 33155 TEL:(305)663 -9688 LIC. No. AR- 0004668 FL. A A- C002021 FL. DRAWING$ � AND SPECIFICATIONS, AS INSTRUMENTS OF SERVICE, ARE AND SHALL REMAIN THE PROPERTY OF THE ARCHIITECT, WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT, THEY ARE NOT TO BE USED BY ANYONE ELSE ON OTHER PROJECTS EXCEPT BY AGREEMENT IN WRITING AND WITH APPROPRIATE COMPENSATION TO THE ARCHITECT. CONSUI.LTANTS DRAWN NAME REG.NO. DISCIPLINE DRAWN T51-No. X' :f HARRY KiJNER CAFE 1909 A -1 M A -4 ob No. 1 01 -030 S