04-20-04 Item 7TO: Honorable Mayor, Vice Mayor DATE: April 20, 2004
& City Commission
FROM: Maria V. Davis ' AGENDA ITEM No.—T
City Manager RE: Adopting the 5 -Year People's
Transportation Plan
RESOLUTION:
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
SOUTH MIAMI, FLORIDA, ADOPTING THE FIVE -YEAR (2003 TO 2008)
PEOPLE'S TRANSPORTATION PLAN; PROVIDING FOR AN EFFECTIVE DATE
BACKGROUND & ANALYSIS:
In accordance with the County's adopted Ordinance No. 02 -116, levying and imposing a
one half of one percent Charter County Transit System Surtax ( "Surtax ") pursuant to the
authority of Section 212.055(1) Florida Statutes. The city will receive a pro rata share of
this imposed surtax based upon the ratio the city's population bears to the total population
in all eligible cities. The city is required to apply the entire portion of its share to
supplement, not replace, the City's general fund support for transportation and transit
purposes.
As part of the County's funding requirements, we are required to submit a 5 -Year
People's Transportation Plan, showing the projects we plan to accomplish during the
five -year period. The attached proposed plan was first prepared for review on October 15,
2003. Since then, two public workshops (January 15, 2004 and March 23, 2004) were
held to discuss, review and amend the plan. The attached plan was accepted during the
last workshop and we are now submitting it for adoption.
RECOMMENDATION:
It is recommended that the City Commission approve the resolution.
ATTACHMENTS:
Proposed resolution
Q Proposed 5 -Year People's Transportation Plan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
RESOLUTION NO.
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH
MIAMI, FLORIDA, ADOPTING THE FIVE -YEAR (2003 TO 2008) PEOPLE'S
TRANSPORTATION PLAN; PROVIDING FOR AN EFFECTIVE DATE
WHEREAS, Miami -Dade County adopted Ordinance No. 02 -116 levying and imposing a
one half of one percent Charter County Transit System Surtax ( "Surtax ") pursuant to the authority of
Sec. 212.055(1) Fla.Stats. (2002); and
WHEREAS, Ordinance No. 02 -116 provides that a portion of Surtax proceeds will be
distributed annually to certain cities who meet specified conditions; and
WHEREAS, the County and the City wish to provide for distribution of Surtax proceeds to
the City on the terms. and conditions provided in the agreement; and
WHEREAS, Miami -Dade County requires that we submit a 5 -year transportation plan prior
to distribution of the Surtax proceeds.
NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISION OF
THE CITY OF SOUTH MIAMI, FLORIDA:
Section 1: That the Mayor and City Commission adopt the City's People's
Transportation Plan as reviewed and accepted during the second workshop on March 23, 2004.
PASSED AND ADOPTED this day of , 2004.
APPROVED: ATTEST:
Maria Menendez, City Clerk
READ AND APPROVED AS TO FORM:
CITY ATTORNEY
Mary Scott Russell, Mayor
Commission Vote:
Mayor Russell:
Vice Mayor Palmer:
Commissioner Birts - Cooper:
Commissioner Wiscombe:
Commissioner Sherar:
g011
O d�
s
U
iwfD 1W rFli
�
OR I
City of South Miami
PEOPLE'S TRANSPORTATION PLAN 2003 -2008
Table of Contents
Table 1: People's Transportation Plan Funding ................................................ ............................... i
Table 2: People's Transportation Plan, Funding per Zones ............................. ............................... ii
Chart: Funding Distribution per Project Category .......................................... ...............................
iii
Traffic Calming, Northside Charrette Area ...................................................... ..............................1
Traffic Calming, Snapper Creek Neighborhood ............................................... ..............................2
TrafficCalming, Manor Lane ........................................................................... ..............................3
Downtown Improvements, Phase 3 ................................................................... ..............................4
RoadwayResurfacing, Citywide ...................................................................... ..............................5
Bus Pullout Bay, U.S. 1 between Sunset Drive And SW 62 Avenue ............... ..............................6
TrolleySystem .................................................................................................. ..............................7
Bus Shelters, Downtown Area .......................................................................... ..............................8
Traffic Calming, SW 64 Street between SW 57 And 62 Avenues .................... ..............................9
TrafficCalming, CRA Area ............................................................................. .............................10
Maintenance Equipment Purchase ................................................................... .............................11
Traffic Control, Cocoplum Terrace Neighborhood & SW 62 Avenue ............. .............................12
City of South Miami
People's Transportation Plan
Item
Project
FY 2003 -04
FY 2004`` -05
FY 2005 -06
FY 2006 -07
FY 2007 -08
TOTAL
1
TRAFFIC CALMING,
$
115,000
$ 111,683
$ 31,000
$
31,000
$
288,683
Northside Charrette Area
2
TRAFFIC CALMING, Snapper
$
50,270
$ 50,753
$
51,436
$
152,459
Creek Neighborhood
3
TRAFFIC CALMING, Manor
$
56,900
$ 19,900
$ 19,900
$
96,700
Lane
4
DOWNTOWN
$
34,500
$
34,500
IMPROVEMENTS, Phase 3
5
ROADWAY RESURFACING,
$
11,500
$ 30,000
$ 35,000
$
35,000
$
49,900
$
161,400
Citywide
BUS PULLOUT BAY, U.S. 1
6
between Sunset Drive and SW
$ 25,000
$ 4,000
$
29,000
62 Avenue
7
TROLLEY SYSTEM
$ 35,834
$ 30,417
$
35,417
$
35,417
$
137,085
8
BUS SHELTERS, Downtown
$ 25,417
$
25,417
$
25,417
$
76,251
Area
TRAFFIC CALMING, SW 64
9
Street between SW 57 and 62
$ 66,718
$
75,118
$
141,836
Avenues
10
TRAFFIC CALMING, CRA
$ 70,718
$
81,218
$
121,000
$
272,936
Area
11
MAINTENANCE EQUIPMENT
$
21,000
$ 21,000
$ 21,000
$
21,000
$
21,000
$
105,000
PURCHASE
TRAFFIC CONTROL,
12
Cocoplum Terrace
$
15,000
$ 10,000
$
25,000
Neighborhood & SW 62 Ave.
TOTAL:
$
304,170
$ 304,170
$ 304,170
$
304,170
$
304,170
$ 1,520,850
City of South Miami - People's Transportation Plan
Item jProject
FY 2003 -04 1 FY 2004 -05 1 FY 2005 -06 1 FY 2006 -07
FY 2007 -08
TOTAL
ZONE 1
$ 288,683
1 TRAFFIC CALMING,
$ 115,000
$ 111,683
$ 31,000
$ 31,000
$ 288,683
Northside Charrette Area
ZONE 2
$ 25000`
8
BUS SHELTERS, Downtown Area - partially included (see Zone 6)
TRAFFIC CONTROL,
12
Cocoplum Terrace $ 15,000 $ 10,000
$ 25,000
Neighborhood & SW 62 Ave.
ZONE 3
$ 414,772
8
BUS SHELTERS, Downtown Area - partially included (see Zone 6)
TRAFFIC CALMING, SW 64
9
Street between SW 57 and 62
$ 66,718
$ 75,118
$ 141,836
Avenues
10
TRAFFIC CALMING, CRA
$ 70,718
$ 81,218
$ 121,000
$ 272,936
Area
ZONE
4
$ 258,100
3
TRAFFIC CALMING, Manor
$ 56,900
$ 19;900
$ 19,900
$ 96,700.
Lane
5
ROADWAY RESURFACING,
$ 11,500
$ 30,000
$ 35,000
$ 35,000
$ 49,900
$ 161,400
Citywide
ZONE
5
$ 152,459
2
TRAFFIC CALMING, Snapper
$ 50,270
$ 50,753
$ 51,436
$ 152,459
Creek Neighborhood
5
ROADWAY RESURFACING,. Citywide - partially included (see Zone 4)
ZONE
6
$ 276,836
4
DOWNTOWN
$ 34,500
$ 34,500
IMPROVEMENTS, Phase 3
BUS PULLOUT BAY, U.S. 1
6
between Sunset Drive and SW
$ 25,000
$ 4,000
$ 29,000
62 Avenue
7
TROLLEY SYSTEM
$ 35,834
$ 30,417
$ 35,417
$ 35,417
$ 137,085
8
BUS SHELTERS, Downtown
$ 25,417
$ 25,417
$ 25,417
$ 76,251
Area
NOT ZONED
$ 105000
11
MAINTENANCE EQUIPMENT
$ 21,000
$ 21,000
$ 21,000
$ 21,000
$ 21,000
$ 105,000
PURCHASE
TOTAL:
$ 304,170
$ 304,170
$ ' 304,170
$ 304,170
$ 304,170
$ 1,520,850,'
City of South Miami
5 -Year People's Transportation Plan
FUNDING DISTRIBUTION PER PROJECT CATEGORIC
[2004 -2008]
TRAFFIC ENGINEERING
$740,444
61%
ROADWAYS & DRAINAGE
$149,900
12%
TRANSIT
$242,336
20%
ROW MAINT. & EQUIPMENT
$84,000
7%
FUNDING DISTRIBUTION PER PROJECT ZONES
[2003 -2008]
ZONE
$258,100
17%
ZONE 5
$152,45!
10%
ZONE 3
$414,772
27%
111
ZONE 6
$276,836
18%
ZONE 2
$25,000
2%
NOT ZONED
$105,000
7%
ZONE 1
$288,683
19%
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
Pro a. TRAFFIC CALMING
PlAect Northside Charrette Area
-0- Public Works Department
--- ----------
Traffic calming by using curbing, medians and median
trees, marked pedestrian crossings, roundabouts,
"bump-outs" and other uses of trees on: SW 42 nd
Terrace and SW 62 nd Court; SW 42nd Terrace and SW
64th Avenue; and SW 44h Street and SW 64h Avenue.
Alignment of pedestrian lights with streets at SW 48th
Street (Blue Road) and SW 58th Avenue. Stop signs
should be discouraged.
Residents have stressed the importance of transforming
the streets from hazardous commuter roads into
dynamic, walkable and aesthetically pleasing
neighborhood streets.
Additional maintenance will be needed. Increase in
annual maintenance cost will be required.
Concurrent with the CSM Comprehensive Plan and
Traffic Calming Study for the area.
Study
Survey
Engineering
Construction
K,
Half Penny Surtax Funds
Dept Prix 3t°,, I of 12
PRIOR YRS. FY 03 -04 FY 04 -05
FY 05 -06
FY 06 -07 FY 07 -08
EXtr',E�
HDF`�
9
5,000
5,000
3,500
3,500 1
10,000
10,000
6,500
7,500
100,000 1
96,683 i
20,000
20,000
--- - ---- -------
115,000
-------------
111,683
--------
30,000
31,000
!"S ,_E_1,!-
115,000 111,683 30,000 31,000
115,000 111,683 30,000 31,000
U
H _",ry - oa 1 o iMl.
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
--------------- ------------ ------ - --- --- ------ ------------
TRAFFIC CALMING
Snapper Creek Neighborhood
Public Works Department
Traffic calming by regulatory signs, entrance features,
textured paving, medians, raised crosswalks and
roundabouts within the Snapper Creek Neighborhood.
T/ F!
, ,
Residents in the Snapper Creek neighborhood have
stressed the importance of traffic calming.
----------
Additional maintenance will be needed. Increase in
annual maintenance cost will be required.
Concurrent with the CSM Comprehensive Plan. In
accordance with results of Snapper Creek Charrette and
Commission approved resolution.
2 12
----------- ------------------------ - ------
Pro;a No, �
FUNDED
-------- ------ ------
PRIOR YRS. FY 03-04
FY 04-05 FY 05-06 FY 06-07
FY 07-08
7
Engineering
25,270
Construction
25,000
50,753
51,436
----------
------- - - ---- ------ -----
50,270
- ------- -- ---------- - ------------
50,753
---------
51,436
(D A
...... ....
Half Penny Surtax Funds
50,270
50,753
51,436
-------------
u, ,
-5nt i a,, od I n-1
------------
50,270 i
50,753
51,436
------------
cia, eci cti-�
- - ------- -------------
waf,.-dn,,-,,,
------
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
TRAFFIC CALMING
oca',on. Manor Lane
Dep,-',�: Public Works Department
Traffic calming measures by utilizing turn restrictions,
textured paving, diverters, pavement marking and
signage, speed humps, and pavement realignment at
various intersections and locations along or in the
vicinity of Manor Lane.
Residents in the vicinity of Manor Lane have stressed
the importance of traffic calming to preserve the quality
of life, safety and physical environment of the
residential neighborhood.
Additional maintenance will be needed. Increase in
annual maintenance cost will be required.
Per Manor Lane Traffic Intrusion Study prepared by
Civil Works, Inc., February 2001.
De p'.. Pnorit 3 of 12
— --- - ----- - ----- - -------- - ---- - -----
FUNDED
Locations for Recommended Internal and
External Improvements:
Manor Lane
SW 63rd Avenue
SW 63d Place
SW 64th Court
SW 65b Place
SW 66th Avenue
SW 67'h Avenue
SW 68th Avenue
SW 74th Street
SW 77th Terrace
SW 78th Street
SW 78th Terrace
SW 79th Street
SW 80th Street
0 11-1
Half Penny Surtax Funds
56,900 19,900 19,900
56,900 1 19,900 19,900
56,900 19,900
cfi.i "'g pnc ke 7� arypa,
19,900
PRIOR YRS. '� FY 03-04
FY 04-05
FY 05-06 FY 06-07 FY 07-08
Survey
3000 i
1' 500
1,500
Engineering
7: 000
3,400
3,400
Construction
46,900
------------
15,000
---- ------ -------
15,000
- ------- -------
0 11-1
Half Penny Surtax Funds
56,900 19,900 19,900
56,900 1 19,900 19,900
56,900 19,900
cfi.i "'g pnc ke 7� arypa,
19,900
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
N'
DOWNTOWN IMPROVEMENTS
Downtown and CRA Area
i y' Public Works Department
---- - ------ -------
Roadway repair, resurfacing and parking analysis as it
relates to traffic calming in the Downtown area.
i- -
-F7
The condition of the paved surface is critical to the
safety of vehicular and pedestrian traffic.
Improvement will reduce street maintenance cost but
there will be an increase in landscaping maintenance
cost.
IRM-11
SW
Dept P.Jcrity
-- - - - - -- FUNDED ----
4 -,,f 12
PRIOR YRS. FY 03-04 FY 04-05 FY 05-06 FY 06-07
- --------- -- ---- - ---- --
Survey 1,500 '1
Engineering 3,500
Construction 29,500
34,500
HE—
34,500
34,500
FY 07-08
City of South Miami
2003 -2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
ROADWAY RESURFACING
Citywide
Public Works Department
Roadway resurfacing of streets throughout the City
exhibiting severely damaged or deteriorated asphalt
surfaces.
The condition of paved surfaces is critical to the safety
of vehicular and pedestrian traffic. The condition of the
roadway surface is also important for street sweeping
maintenance.
Will minimize maintenance cost.
Consistent with the City's 5 -year Capital Improvement
Plan.
fit- �E�c,�rr° 5 12
------------ - -- --- - - - - -- ----------------
_- - -- _-- FUNDED - __ -',
,..,)
Roadway Resurfacing Program:
1. SW 751h Terr. from SW 67`h Ave. to SW 69th Ave.
2. SW 761" Terr. from SW 67`h Ave. to SW 69"' Ave.
3. SW 681h Ave. from SW 75`h Terr to SW 76`h Terr.
4. SW 651h P1. from Manor Lane to SW 75`h Terr.
5. SW 75th St. from SW 65th Pl. to SW 655thCt.
6. SW 70h St. from SW 65 Pl. to SW 66 Ave.
7. SW 66th Ave. from SW 76th St to SW 771h Terr.
8. SW 77th Terr. from 6600 Block to SW 65th Pl.
9. SW 76th Terr. from SW 65 Pl. to SW 66th Ave.
10. SW 76th Terr. from SW 66th Ave. to SW 67th Ave.
11. SW 63rd Ave. between Sunset Drive & Manor Lane
12. SW 63rd Ct. between Sunset Drive & Manor Lane
13. SW 641h Ct. between Sunset Drive & Manor Lane
14. SW 65th Ave. between SW 62nd Pl. & SW 74th St.
15. SW 741h St. between SW 62nd Pl. & SW 65th Ave.
16. SW 81St St. between SW 58th Ave. and SW 62nd Ave.
17. SW 81St Terr. between SW 57`h Ave. & SW 58th Ave.
18. SW 82nd St. between SW 571h Ave. & SW 62nd Ave. j
19. SW 83rd St. between SW 571" Ave. & SW 60th Ave.
20. SW 84th St. between SW 57th Ave. & SW 62nd Ave.
21. SW 58th Ave. between SW 815` Street & SW 841h Ave.
22. SW 591h Ave. between SW 81St St. & SW 84th Ave.
23. SW 60th Ave. between SW 83rd St. & SW 84th St.
24. SW 60th Ave. between SW 8155 St. & SW 82nd St.
25. SW 60th Ct. from SW 82nd St. to end of circle.
26. SW 61' Ave. from 8200 block to SW 84th St.
PRIOR YRS. FY 03 -04
FY 04 -05
FY 05 -06
FY 06 -07
FY 07 -08
X P _. °F
Survey
i
1,500
1,500
1,500
1,500
1,500
Engineering
2,500
3,500
3,500 ',
3,500
3,500
Construction
7,500 1
25 000 ;
30 000
30,000
44,900 i
11,500
30,000
35,000 `;
35,000 `
49,900 j
JU
Half Penny Surtax Funds
11,500
30,000:
35,000
35,000.
49,900
I
--
P
11,500
30,000
35,000
35,000 r
49,900
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
BUS PULLOUT BAY
U.S. 1 between Sunset Drive and SW 62 Avenue
ec) �,, �-asd, Public Works Department
Asphalt paved pullout bay along U.S. I for southbound
traffic. To be constructed between SW 72nd Street
(Sunset Drive) and SW 62nd Avenue.
Allows large transit vehicles, such as trolleys and buses,
to make required stops without disrupting the flow of
traffic.
Additional maintenance will be needed.
Concurrent with the CSM Comprehensive Plan and
Five Year Capital Improvement Plan.
Study
Survey
Engineering
Construction
Half Penny Surtax Funds
Toia� FllllndliMci,
f
6 12
------ ------------- - ----------- -
C�
O
SW 72NO ST
I �JEl
U� 1)"'I i6'-! 11,
PRIOR YRS. 1 FY 03-04 FY 04-05 FY 05-06 FY 06-07 FY 07-08
---------- - - ----- --- ---
EXF "N""'ITURE
'- -- 0,
d dkjm P!a-
i 5,000
20,000 5,000
25,000 5,000
---------- ------- ------
25,000 j 5,000
25,000 li 5,000
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
--------- ---- ------
TROLLEY SYSTEM
Downtown and CRA Areas
Public Works Department
Trolley system designed to provide transportation
services within the business district, Community
Redevelopment Area, City Hall, and Metrorail Station.
Provides relief for parking and traffic problem in
business district, assists pedestrians, enhances
hometown look and feel.
--- - - --- ---
Additional maintenance will be needed.
Concurrent with the CSM Comprehensive Plan and
Five year capital Improvement Plan.
----------- - -
Contractual Services
Lease Purchase
tt, Rrko: tv: 7 12
- - -------------- I -------------
pm
- ----- ---------
FT-T,
-- ---- ----- -----
�Io
City of South Miami
TROLLEY ROUTE AND STATIONS
Z=
WIN 10
MIA
a,
0 0.1 0.2 0.3 0.4 0.5
IuLles
--------- ------------ ---- - ------ ----- ------- ----------- ----- ------ --- — -- ----- ------- 11 ------ -----------------
PRIOR YRS. FY 03 -04 FY 04 -05 FY 05 -06 FY 06-07 FY 07-08
- - --- ----------
pRFE SCHEU'LE
--- ------ -- -- --- -- ------------------------- ------ -- ------ ------- --- - --- ----
35,834 30,417 35,417 35,417
35,834 30,417
35,834 30,417
35,417 35,417
35,417 35,417
35,834 30,417 35,417 35,417
--------------
iinnar P!af1!0'�F'
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
Bus shelters in the selected existing bus stops along
City-owned rights-of-way at SW 59th Place, SW 66"'
Street and SW 72 ,d Street (Sunset Drive).
J, '_ o GA T;
CRA citizens have stressed the need for comfortable
and aesthetically pleasing waiting areas.
Additional maintenance will be needed.
Concurrent with the CSM Comprehensive Plan and
SMCRA Plan. In accordance with TODD regulations
and results of Charrette Too.
— - — __ - - -------------- � ---� --- --- --- ---- — --- --- ------------------- ------ - ----- --- -- -- --- -
PRIOR YRS. FY 03-04 FY 04-05 FY 05-06 FY 06-07
-------- -----
FY 07-08
2,000
3,000
20,417
'R' ES
Half Penny Surtax Funds
r,,eiirininary p�au'trd
BUS SHELTERS
8
12
f�)rnqle,-A Luca�Fior_
Charrette Too (CRA) Area and Sunset Drive
------ ---- ------ ------ -----------
------
Public Works Department
FUNDED
_ -- ---- --------
-
Bus shelters in the selected existing bus stops along
City-owned rights-of-way at SW 59th Place, SW 66"'
Street and SW 72 ,d Street (Sunset Drive).
J, '_ o GA T;
CRA citizens have stressed the need for comfortable
and aesthetically pleasing waiting areas.
Additional maintenance will be needed.
Concurrent with the CSM Comprehensive Plan and
SMCRA Plan. In accordance with TODD regulations
and results of Charrette Too.
— - — __ - - -------------- � ---� --- --- --- ---- — --- --- ------------------- ------ - ----- --- -- -- --- -
PRIOR YRS. FY 03-04 FY 04-05 FY 05-06 FY 06-07
-------- -----
FY 07-08
2,000
3,000
20,417
'R' ES
Half Penny Surtax Funds
r,,eiirininary p�au'trd
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
TRAFFIC CALMING
Lo "ucr'- SW 64 Street between SW 57 and 62 Avenues
Public Works Department
---------- - -------- - -- -- ----- - ---- ---
Traffic calming for SW 64th Street (Hardee Drive)
between SW 57th Avenue and SW 62nd Avenue.
Includes textured pavement, pavement realignment and
traffic control signage and striping.
CRA citizens have stressed the importance of
transforming the streets from hazardous commuter
roads into dynamic, walkable and aesthetically pleasing
neighborhood streets.
Additional maintenance will be needed.
- ------ ---- ------ -
Concurrent with the CSM Comprehensive Plan and
SMCRA Plan. In accordance with TODD regulations
and results of Charrette Too.
1"'ric-I[Y 9 0" 12
------ --- -- - ----------- -
NO:
'V�
FUNDED
------ ---- ---- -- __FUNDED
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
TRAFFIC CALMING
Charrette Too (CRA) Area
DE,,!1, Public Works Department
Traffic calming for Church Street (SW 59b Place)
intersections, SW 62d Avenue crosswalk locations and
Hardee Drive (SW 64h Street). Also included are raised
intersection at SW 64th Street and SW 59th Place and
small roundabout at SW 60th Street and SW 59h Place.
CRA citizens have stressed the importance of
transforming the streets, and especially Church Street,
from hazardous commuter roads into dynamic, walkable
and aesthetically pleasing neighborhood streets.
Additional maintenance will be needed.
Concurrent with the CSM Comprehensive Plan and
SMCRA Plan. In accordance with TODD regulations
and results of Charrette Too.
10 12
---------- ---- ------
FUNDED
�' o 2 c ! ;u, a i,:'Ml.-��',�
PRIOR YRS. FY 03-04 FY 04-05 FY 05-06 FY 06-07 FY 07-08
Study
2,500
2,500
4,000
Survey
3,500
3,500
5,000
Engineering
10,000
10,000
12,000
Construction
50,718
59,118
100,000
---------------------
---- ------
66,718
75,118
121,000
U "J 1- 1 N,,'-, 0 S P P R 0 P R'
--- --- -- ------ ------ ------ -- --- ------
.',e J I-
--- --- ----- ------- ---------------- --------
--- -- --------
- - --- --- --
f
Half Penny Surtax Funds
66,718
75,118
121,000
--- -------- --- -------------- ------------- -- -- -- -------
66,718
75,118
- --------
121,000
-j U Y
�e�, —' i
City of South Miami
2003-2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
---- ----- ------- ------- ------- - ---- -- ---- - - ------- ------ ---- - ------ ---- - - ----- - -- ----- -------------------------- - - ------------- ------- - ----------------- - - -- ------ ------------- ------- -
-- -----
r
"I U4
MAINTENANCE EQUIPMENT PURCHASE 11 12
---------------- 1 -- ----- --- I ---------- ----------------------- ------
Pre�"et"i No,
4975 SW 75th Avenue
- ---- ------ - ---- ------- ------ - ----- ------ - -------- ----
Public Works Department FUNDED
---- - - ---- - ----- -------- -----------
r)j=(z(,PtPT1nN:
i
5-year lease at 6.37% ($1.00 buy-out at end):
• Backhoe (Combination)
• Full-Size Bucket Truck
Lease Vehicles
PRIOR YRS. FY 03-04 i FY 04-05 FY 05-06 FY 06-07 FY 07-08
- -- - ------
21,000 21,000 21,000 21,000 21,000
City of South Miami
2003 -2008 PEOPLE'S TRANSPORTATION PLAN
CAPITAL IMPROVEMENT PROJECT REQUEST FORM
3 - , .. TRAFFIC CONTROL
---------------- .
12 12
Cocoplum Terrace Neighborhood & SW 62 Avenue
Public Works Department i I FUNDED
DESCRIPTION:
i
Final phase of the construction of intersection
improvements along with roadway modifications to
calm traffic in the Cocoplum Terrace neighborhood.
Engineering process for the installation of crosswalks
along SW 62nd Avenue.
To finalize the implementation of traffic control devices
to address speeding and traffic intrusion in local
residential streets. Also to assist pedestrian traffic
crossing SW 62nd Avenue.
Additional maintenance will be required.
Consurrent with Cocoplum Terrace Neighborhood
Traffic Management Plan.
? _ ° I
Engineering
Construction
PRIOR YRS. FY 03 -04 1 FY 04 -05 1 FY 05 -06 I FY 06 -07
3,500 1 3,500
11,500 6,500
15,000 10,000
Half Penny Surtax Funds 15,000 i 10,000
i
I
15,000 10,000
_
FY 07 -08