Loading...
02-03-04 Item 8TO: Honorable Mayor, Vice Mayor RESOLUTION DATE: February 3, 2004 ITEM No. RE: Authorizing the City Manager to Execute an Additional Drainage Improvement Agreement with Proturf, Inc. for the Dante Fascell Park Tennis Courts. A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER FOR ADDITIONAL DRAINAGE IMPROVEMENTS PURSUANT TO SECTION 10.03 OF THE PROTURF, INC. AGREEMENT FOR THE DANTE FASCELL PARK TENNIS COURT IMPROVEMENTS WHICH CHANGE ORDER WILL RESULT IN CONSTRUCTION COSTS IN THE AMOUNT OF $9,981.52 TO BE CHARGED TO SOUTH FLORIDA WATER MANAGEMENT DISTRICT GRANT ACCOUNT NUMBER 001 - 0000 - 132 -2060; PROVIDING FOR AN EFFECTIVE DATE. BACKGROUND & ANALYSIS Proturf, Inc. is currently renovating the tennis courts at the Dante Fascell Park, under the contract executed by the City of South Miami on October 3, 2003. The original design provided for standard tennis court grading and construction throughout the facility. However, during construction an unforeseen condition arose as the southernmost boundary of the courts, which receives little or no direct sunlight because of the adjacent landscaping, has been retaining moisture for extended periods. To rectify this problem, a design was recently created by our engineering consultants to provide a small exfiltration drainage system along the rear boundary of the courts. This system consists of a small gravel - filled trench with a pipe that would help convey the stormwater runoff to the newly installed catch basins just outside the perimeter of the courts. This solution will expedite the removal of moisture from the courts and therefore ensure the proper maintenance of the clay surface. Public Works staff requested and received a proposal from Proturf, Inc. to accomplish this work. The proposal for $9,981.52 was thoroughly checked and compared with prices for similar work Page 2 of 2 Comm. Mtg. Agenda February 3, 2004 being performed in the City. This amount will be funded through the South Florida Water Management District Grant Account Number 001- 0000 -132 -2060. The account balance before the proposed $9,981.52 is $64,733.33. RECOMMENDATION It is recommended that the City Commission approve the funding for the work. Attachments: ❑ Proposed Resolution ❑ Contractor's proposal MVD /WAB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 RESOLUTION NO. A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER FOR ADDITIONAL DRAINAGE IMPROVEMENTS PURSUANT TO SECTION 10.03 OF THE PROTURF, INC. AGREEMENT FOR THE DANTE FASCELL PARK TENNIS COURT IMPROVEMENTS WHICH CHANGE ORDER WILL RESULT IN CONSTRUCTION COSTS IN THE AMOUNT OF $9,981.52 TO BE CHARGED TO SOUTH FLORIDA WATER MANAGEMENT DISTRICT GRANT ACCOUNT NUMBER 001 - 0000 -132 -2060; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Mayor and City Commission wishes to provide drainage improvements to the tennis courts at the Dante Fascell Park aid; WHEREAS, the construction activities will consist of a new drainage system along the southern boundary of the tennis courts to enhance percolation, and; WHEREAS, the Mayor and City Commission entered into a contract with Proturf, Inc. on ; and WHEREAS, the Mayor and City Commission authorizing the city manager to execute a change order for additional drainage improvements pursuant to section 10.03 of the Proturf, Inc. agreement for the Dante Fascell Park tennis court improvements which change order will result in construction costs in the amount of $9,981.52 to be charged to South Florida water management district grant account number 001- 0000 -132 -2060 NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1: The city wishes to install a new exfiltration drainage system along the southernmost boundary of the tennis courts as part of the Dante Fascell Tennis Court and Parking Lot Improvements project currently under construction by Proturf, Inc. Pursuant to section 10.3 of the Proturf, Inc. agreement, the city manager is authorized to execute the work change order which is attached as exhibit 1. Section 2: The engineering consultant reviewed the proposal submitted by Proturf, Inc. and confirmed that the unit prices for this additional work were consistent with work previously performed in the City. Section 3: The project will be funded through the South Florida Water Management District Grant account number 001 -0000 -132 -2060. Section 4: That the Mayor and City Commission authorize the City Manager to execute an additional drainage improvement agreement with Proturf, Inc. for the tennis courts in the amount of $9,981.52. PASSED AND ADOPTED this day of , 2004. 1 2 3 4 5 6 7 8 9 10 11 12 13 APPROVED: Maria Menendez, City Clerk READ AND APPROVED AS TO FORM: CITY ATTORNEY ATTEST: Horace G. Feliu, Mayor Commission Vote: Mayor Feliu: Vice Mayor Russell: Commissioner Bethel: Commissioner Wiscombe: Commissioner McCrea: 01/14/2004 WED 16:23 FAX 305 774 6277 OTS ARCHITECS -ACCTG IM 003/004 - Jan•14. 2004- 3:47PM — —No-1829—P. 2�� Proturf, Inc. CHANGE ukumt RhgUEST No. 00001 7344 SW 48th Street, Suite 301 Phone: 305,665.9351 Mimni, FL 33155 Fox; 305.665,5478 TITLE: Drainage (? Tennis Courts DATE: 1/14/2004 FROJFCT• Dantc l�ascell Park ;1( }B: 2403 -10 Dante Fascell ';arlc TO: Attn: Ramou Custalla CONTRACT NO: 1 C31'8 Enincers Architects Planners 901 Ponec do Lcon Blvd., Suite 900 3QS.445.336b Coral Gablcs, FL 33134 Phone: 305.445.2900 RE: To: From: Number: D +`S CLtiPTION OF PROMS ", u;�� =' in accordmee with job site visit on 1/9/03 and several meetings with the consulting ensincer we are proposing to provide 6" drainage with pearock gravel .-tiong the back side of the north and south tennis courts for approxhuately 185 if on each side. Item Description :. Stock# Quant '" 'I.rt1 tk Unit Price . TaaRatt Tax Amount Net Ant0QM 00001 Am1C11ed Cost Bfeak Down for 1.000 1s (8,16& I J 001% $0.00 SAJ68.13 wprk w be C-omplC1e1 00002 ( erhud 1,0(10 10% 581613 0.00% $U.00 $816.11 00003 PecAt 1.000 10 "/0 $89$.43 Q -90% so,o(1 SA08.43 OWN bond Cost' 1.000 174 $199.93 000% $0.00 $98,83 Unit Cost: $97981.52 Unit Tax: $0.00 Lump SUM: $0.00 Lump Tax: $0.00 Total: $9,981.52 ft APPROVAL: By: By Andres Correa. Ramon Castella Date: Date: 1. t R fthurt nR N