Loading...
10-10-05 Special Item 8South Miami BACKGROUND AND ANALYSIS: In addition to extending main distribution pipes along each street, service lines will be stubbed -out to the each property and fire hydrants will be provided along each street for fire protection. These professional services will be funded through the South Florida Water Management District grant account numbers 106 -1711- 536 -6433 & 1 06-1 711 -536- 6434, with account balances of $45,000 & $205,000, respectively. The first $45,000 expense will be funded from account number 106 -1711- 536 -6433 and the balance of $8,696 will be funded from 106 -1711- 536 -6434. It is recommended that the City Commission approve the resolution. /,•g; ATTACHMENIS: 13 Proposed Resolution U TY LIN/HJ Ross' Work Order for Professional Services • General Engineering Services Agreement with HJ Ross ■ HJ Ross' Fee Worksheet • Project Location Map 39 40 Section 3: The attached proposal, Professional Service Work Order, is made part of the 41 resolution. 42 43 Sec 4: This resolution shall tape effect immediately upon execution. 44 45 SIGNATME PACE TO FOLLOW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 PASSED AND ADOPTED this dav of [411"GINJA 1. ATTEST: RM Commission Vote: Mayor Russell: Vice Mayor Palmer: Commissioner Wiscombe: Commissioner Birts-Cooper: Commissioner Sherar: C:\Documents and Settmp\Ancke\My Documents\NNIord Docunionts\ResolutionWdaMainExt.doo 201 Alhambra Circle, Suite 900 Coral Gables, Florida 33134 Tel. 305.567.1888 Fax. 305.567.1771 y EMAIL: hjross @hjross.com September 27, 2005 Mr. W. Ajibola Balogun, REM Public Works Director City of South Miami Public Works Department 4795 S.W. 75th Avenue Miami, FL 33155 RE: Citywide Water Main Extension — Area 2 Proposal for Engineering Services Dear Mr. Balogun: We appreciate the opportunity to provide surveying, engineering design, permitting, bidding assistance, and construction administration services for the Water Main Extensions along the following streets: 1. S.W. 691h Avenue, from S.W. 64th Street to S.W. 68th Street 2. S.W. 65th Street, from 6790 S.W. 65th Street to S.W. 691h Avenue 3. S.W. 67th Street, from S.W. 67th Avenue to S.W. 69th Avenue 4. S.W. 62nd Terrace, from S.W. 67th Avenue to the end of the street The attached Proposal for Engineering Services lists the Scope of Work, compensation to perform these services and the project schedule. If in agreement, please initial the attached sheets, sign on page 5 and return one original for our records. We look forward to working with you on this project. Sincerely, .Y Polidoro Africano, P.E. Project Manager Enclosures cc: Mariano Valle, P.E. Colin Henderson CITY OF SOUTH MIAMI CITYWIDE WATER MAIN EXTENSION — AREA 2 PROPOSAL FOR ENGINEERING SERVICES I. PROJECT DESCRIPTION Initials: PA AB The City of South Miami (CITY) proposes to construct water main extensions including fire protection and service lines to selected properties with meter boxes, along the following streets: 1. S.W. 69th Avenue, from S.W. 64th Street to S.W. 68th Street 2. S.W. 65th Street, from 6790 S.W. 65th Street to S.W. 691h Avenue 3. S.W. 67th Street, from S.W. 67th Avenue to S.W. 691h Avenue 4. S.W. 62nd Terrace, from S.W. 67th Avenue to the end of the street s .,N< ' i.R' `.;s (CONSULTANT) will provide final construction plans, technical specifications, permitting and bidding assistance, and construction administrative services for the above project. For the purpose of this proposal, the water main extension has preliminarily been identified as 3,580 feet in length. This work will be performed in accordance with the Professional Service Agreement for General Engineering Services (AGREEMENT) dated December 2004 as amended herewith. II. SCOPE OF PROFESSIONAL SERVICES The spe-cif ic work-scope tasks to be performed by CONSULTANT and its subconsultant are: 1. SURVEYING PHASE The project surveyor will prepare a Specific Purpose Survey within the above mentioned project limits. Survey will include all above ground visible features and utilities, driveways, trees, signs, and drainage structures with pipe size and inverts. Elevations will be taken at 100 -foot intervals. Survey Data will be on the State Plane coordinate system with elevations referenced to the NGVD 1929 datum. Survey will be prepared in AutoCAD format. City of South Miami - Public Works Department September 27, 2005 Citywide Water Main Extension — Area 2 Page 1 Proposal for Engineering Services P +i ,i`�f'E i 7'"' C"`' ..r w z __ -y._ _ _: Initials: PA AB 2. PHASE III: FINAL DESIGN PHASE CONSULTANT agrees to provide the Phase Ill - Final Design / Construction Documents Development services in accordance with Paragraph 2.2.3 of the AGREEMENT with the following modifications: 2.1 CONSULTANT will limit the Phase III design services to the proposed water main extensions and associated surface reconstruction details within the limits identified in Section I above. 2.2 CONSULTANT will prepare one set of Construction Documents including plans and specifications for the water main - extensions along all four- sites- shown above. 2.3 CONSULTANT will prepare construction plans and details using the standards of Miami -Dade County Water and Sewer Department (WASD). 2.4 CONSULTANT will make one presentation to the City Board for final approval if required under Paragraph 2.2.3.H. 2.5 CONSULTANT will provide permitting services as stated in Paragraph 2.2.3.J. 3. PHASE IV: BIDDING ASSISTANCE PHASE CONSULTANT agrees to provide the Phase IV — Bidding and Negotiation Phase services in accordance with Paragraph 2.2.4 of the AGREEMENT. 4. PHASE V: CONSTRUCTION ADMINISTRATION PHASE CONSULTANT agrees to provide the Phase V — General Administration of the Construction Contract services in accordance with Paragraph 2.2.5 of the AGREEMENT with the following modifications: 4.1 CONSULTANT bases fee for this task on a construction time of 105 calendar days from award of Construction Contract to approval, by the CONSULTANT, of Contractor's final Payment Certificate. 4.2 CONSULTANT bases fee for this task on conducting weekly site visits and part- time on -site observations at an average of 8 hours per week. In the event that continuous daily on -site observations are required as stated in Paragraph 2.2.5.E of the AGREEMENT, CONSULTANT reserves the right to negotiate additional fees with the CITY at the hourly rates found in Section 4 of the AGREEMENT. City of South Miami - Public Works Department September 27, 2005 Citywide Water Main Extension — Area 2 Page 2 Proposal for Engineering Services .tat Initials: PA AB 5. PHASE VI: POST CONSTRUCTION ADMINISTRATION CONSULTANT agrees to provide the Phase Vl — Post Construction Administration services in accordance with Paragraph 2.2.6 of the AGREEMENT. Ill. SUBCONSULTANTS The below Fisted Sub - Consultants will assist in the performance of the Work. SubConsultant Name Specialty or Expertise Avino & Associates, Inc. Surveying services IV. SCHEDULE OF DELIVERABLES CONSULTANT will submit the following deliverables to the CITY: SCHEDULE OF DELIVERABLES Task No. Description of Deliverable or Drawing Name 1. Two signed and sealed surveys and an electronic AutoCAD file on CD. Projected Finish Date • At 50% & 100% completion: 2 copies of drawings, check sets, and specifications. 2 • Upon final approval by the CITY: 12 sets of drawings and specifications. TBD • 1 CD with drawings in AutoCAD format, and WORD files of specifications. 2. • Copies of correspondence and minutes of meetings. 3. Copies of Pre -bid agenda and minutes, addendums, bid tabulations and correspondence. 4 Copies of Pre - construction agenda and minutes, shop drawings, change orders, payment PHASE 1V: BIDDING ASSISTANCE PHASE certificates, construction observation reports, test results, and correspondence. 5. Copy of written manual if required and One set of reproducible record drawin s. V. SCHEDULE OF SERVICES CONSULTANT shall perform the Work as depicted in the table below following receipt of a written Notice -to- Proceed from the CITY. A preliminary schedule of activities is attached as Exhibit "A ". SCHEDULE OF WORK () Task No. Task Name and /or Activity Description Duration work days Projected Start Date Projected Finish Date 1. SURVEYING PHASE TBD TBD 2. PHASE Ill: FINAL DESIGN PHASE TBD TBD 3. PHASE 1V: BIDDING ASSISTANCE PHASE TBD TBD 4. PHASE V: CONSTRUCTION ADMINISTRATION PHASE TBD TBD 5. PHASE VI: POST CONSTRUCTION ADMINISTRATION TBD TBD The above schedule assumes CITY will issue a Written Notice to Proceed on October 15, 2005 City of South Miami - Public Works Department September 27, 2005 Citywide Water Main Extension — Area 2 Page 3 Proposal for Engineering Services VI. COMPENSATION Initials: PA AB CONSULTANT shall perform the Work detailed in this Proposal for a Lump Sum, Fixed fee of Fifty Three Thousand Six Hundred Ninety Six dollars and 00 cents ($53,696.00). SUMMARY OF COMPENSATION Task # Task Name and /or Activity Description Amount Fee Basis 1. SURVEYING PHASE $12,214.00 Lump Sum, Fixed 2. PHASE III: FINAL DESIGN PHASE $27,390.00 Lump Sum, Fixed 3. PHASE IV: BIDDING ASSISTANCE PHASE $3,172.00 Lump Sum, Fixed 4. PHASE V: CONSTRUCTION ADMINISTRATION PHASE - $9,886.00 Lump Sum, Fixed 5. PHASE VI: POST CONSTRUCTION ADMINISTRATION $1,034.00 Lump Sum, Fixed $0.00 Lump Sum, Fixed Total = $53,596.00 Lump Sum, Fixed VII. ALLOWANCE FOR ADDITIONAL SERVICES Additional services not specifically described under "Scope of Professional Services" will be performed upon written approval, and will be billed at the hourly rates shown in Section 4 of the AGREEMENT. CONSULTANT may use the Allowance for Additional Services requested in writing by and at the discretion of the CITY. VIII. SERVICES NOT INCLUDED The following services are not included in the Scope of Work for this project: 1. Roadway Engineering services identified in Paragraph 2.1.A of the AGREEMENT. 2. Drainage Design services identified in Paragraph 2.1.13 of the AGREEMENT. 3. Civil Engineering services for Sanitary Sewer System Evaluation and design identified in Paragraph 2.1.0 of the AGREEMENT. 4. Traffic Engineering services identified in Paragraph 2.1.D of the AGREEMENT. 5. Environmental Engineering services identified in Paragraph 2.1.E of the AGREEMENT. 6. Phase I services identified in Paragraph 2.2.1 of the AGREEMENT. 7. Phase II services identified in Paragraph 2.2.2 of the AGREEMENT. 8. Additional Professional Services identified in Paragraph 2.3 of the AGREEMENT. 9. Geotechnical Engineering services including subsurface explorations and /or testing. 10. Permitting Services other than those described above or payment of permit fees. City of South Miami - Public Works Department September 27, 2005 Citywide Water Main Extension — Area 2 Page 4 Proposal for Engineering Services Initials: PA AB IX. INFORMATION TO BE PROVIDED BY THE CITY CITY agrees to provide, if available: 1. Aerial photographs in digital form of the project area. 2. AutoCAD standard sheet format and guidelines to be used on the plans. 3. As -built plans of existing City -owned facilities with elevations of underground utilities. 4. Division 1 (front -end) documents for the preparation of the contract documents. 5. CITY is responsible for payment of any permit review fees to the regulatory agencies. X. PROJECT MANAGER CONSULTANT'S Project Manager for this Work Order assignment will be Polidoro Africano, P.E. Prepared by: Approved by: Polidoro Africano, P.E. Date Maria V. Davis Date City Manager City of South Miami - Public Works Department September 27, 2005 Citywide Water Main Extension — Area 2 Page 5 Proposal for Engineering Services a n � � a 4. a fT W N i J N G tOO O 01 A J4 ul m g y w 7 g a VJ O 11 C O -i toN m umi O C �p 0 O z m m rn x c, m S m o 2 Rs m a ID .c µa 4A M 2 a T. C N r A W, rtitt F m c Q 3 C 3 7 O 11 ��11 a03 mo Ip v Q v v s W O 0 jjYY C ; 00 7 �' Na 1? Awtn Zp m m C 0 i C o d 0 y m m O 7' r w O m m m D w A M C � o lu R n C^l, 3 7 4 0 C) n N A W N A vm �� �WffK° p O 0_y > J N to C. Qp N m of J a a co a c a EL ° c0 �vIDl o CA CD m t0 � 7 O O m ar N '• Q .y.. s. .S: m t o N o o N a n � � a 4. a fT W N i J N G tOO O 01 9z C 0 VJ O 11 0 W - O -i toN mm p, ID m° mm z m r ' c, 0 O O �N N z µa 4A M W C N r 6: m r J m W W O 00 a N c C c c c c c C 11 ��11 a03 mo Ip v Q v v s W O 0 jjYY C ; 00 7 �' Na O m r> 3 3 r J Zp m m <' fn Vl UJ V1 UI y m m O 171 o n e >= C e c m D ID M w w A M � o lu :: lu 4 O m tY 3 m m VI 7 a ID N � m A O V O `o M 3 m I h I 1 N 1 1 1 0 0 7 0 fn 7 C n m ORz '0 (A a cp O >CD Om in w ID mO °o CD m :.a Fn = L ZO /Z0 ONI OOSSV SSON fH 0b9bT9psoc 90:ST S00Z /SZ /60 6 fT W N i N X 11 0 W - toN p, ID 3 O O �N N µa 4A M W J N N N 6: i J W W O 00 m O W' O O 0 00 O O O O m tY 3 m m VI 7 a ID N � m A O V O `o M 3 m I h I 1 N 1 1 1 0 0 7 0 fn 7 C n m ORz '0 (A a cp O >CD Om in w ID mO °o CD m :.a Fn = L ZO /Z0 ONI OOSSV SSON fH 0b9bT9psoc 90:ST S00Z /SZ /60 6 fT W N i 0 W - p, ID 3 '•° N J m m d •gyp n o N d � y m m O ol fA N A N O 07 O O O N 4 N A W N A C p O o to C. Qp N m of J - m �° c0 w o CD o N CO y O O +.1 N N to .y.. IQ N o o N A S m m m' f 49 � ° v Q! co .1 C O O 0 O W N i N 04 • m � n s wOl 69 w rn [7 0 R o A v W NO .aa ° jo C3 O N A 'p O m n S m � N 3. °f en 11 to s» n co 03 W N O ° O N . ° o 0 N Eft rn O c 0 67 0 0 T 6 y 7 ° � m Z m 0 s w � w A m N O C� 7n' m Q � F II N w 9 y c7 y m Q �o A rn N N o< W O O N O O O Q O Q O o O fA 4W fA 69 69 m W W d) .p. Qi N In W pi fT V W G� m !p y m O m tY 3 m m VI 7 a ID N � m A O V O `o M 3 m I h I 1 N 1 1 1 0 0 7 0 fn 7 C n m ORz '0 (A a cp O >CD Om in w ID mO °o CD m :.a Fn = L ZO /Z0 ONI OOSSV SSON fH 0b9bT9psoc 90:ST S00Z /SZ /60 6 City of South Miami PUBLIC WORKS & ENGINEERING DEPARTMENT CITYWIDE WATER EXTENSION — AREA 2 Project Location Map 6646;6626!6606: 652U6500 6800 6538 0 6050 .6625 6605 6525 6501 ssa -SW 61ST -ST- 0 6624:6604Z540 6512:6120, Q 6643.6623 6045 6750 0 60036541:6521:614& D` 6156, S—W 61ST TE6504 > 6642 6622:6602.6524.6514 Q 6161 U) 6605 '6202 6225, 68676845'6825 6785 6771 6765 6761 6649 662965609 _ 6201 6899 6200 SW 62ND TE SW, 62ND TE 6z10 �n 6211 szas 6212 Q 6840 6820 6780 6770 6760 f—: 6648 66286601" - 6221 6240 F62800 6855 6835 6815 6791 6781 6771 = 6250 6647 ,66276607 6241 a, 6275 _ SW 63RD ST �- � _. _ 1- 6310 SW 63RD TE< s310 6311 6325 6310 6860 6800 6790 6780 6770 �0 65596 6646:662M 06 _ r 6845 ,- , . _ ,,� 6 330 6331 6865: 6390 0 6390 6355 6875 6825 6775 6765 3: 6641 66216601.65516527 6350 6351 cn HRRDEE DR SW 64TH ` ST 6900 6650 '6630 6610!6540 6506 6502 6401 6700 6890 6800 6790 6776 6649 66296609:65216511'6501 6421 6440 6450 SW 65TH ST SW '65 TH ST 6511 . _ 6648 6628:6608 652&6510 6500 6500 � 6521 6505 6500 6647:6627:660T6521.6511 -6501 6830 6810 679 0 6750.. _. SW 65TH TE _ 6531 6901 6585 C 6646` 6551 0 6626 6606.6520 6510' 6500 " > 66090 6610 6619: 6612 6604 6605_ - 0 6621 Q 6622 0 6624 co 6624 6835 0 6767 0 6711 a 6680'' U Q 6695- 6648 6636 a 6700 �; SV1i- 6� %TH ..'ST .. .:: .. _ _ , _ _,: Q Q _o,� ° .� 0 6712, Q . 6708 0 6708 6751 �. 0 0 67 90_ p 672.. 6830 6800 6740 6706 (� 0 0 6716 Q 6706 0 6745 674 0 6780 6792 755 SW 68TH ST can fi 6800 (0: 6701 .6721 6741:6761 6781 6801 4 6801 6848 65832'6816:6800 6801 6800 6830 ;? SW 68TH._. TE 6821 820! 6821 6850 .,! 6780 6760 6740 6720 6700 6665 6841 6675 6655! 6840 6875 6861 6$45 6831 6815 6801 6900 6781 6701 6660 6905 6904