Loading...
10-05-05 Item 6South Miami RESOLUTION BACKGROUND AND ANALYSIS The Parks and Recreation Department has solicited quotations for the installation of a concrete parking area, and the lowest responsive quotation was submitted by Leadex Corporation in the amount of $5,979.10. Leadex Corporation is providing a one -year guarantee on labor and materials. The attached resolution would authorize the City Manager to disburse funds in the 2mount of $5,979.00 to Leadex Corporation for this work. Funding is available in the Land and Water Conservation • r 00 1.0000.131.1461 - r balance of : RECOMMENDMION We recommend that the City Manager be authorized to disburse the amount of $5,979.00 to Leadex Corporation for the installation of the concrete parking area at Brewer Park. WHEREAS, the Parks and Recreation Department has received grant funding through the Florida Department • Environmental Protection's Land and Water Conservation Fund (LWCF) for improvements to Brewer Park; and WHEREAS, one element of the improvements project is the installation of a concrete parking area in place of the existing un-paved parking area; and WHEREAS, Leadex Corporation has provided the lowest responsive quotation for the installation • the concrete parking area. NOW, THEREFORE, BE ff RESOLVED BY THE MAYOR AND CITY COMM1 SI i OF THE CITY OF SOUTH MIAMI, FLORIDA: SeLtion 1. That the City Manager is authorized to disburse $5,979.00 to Leadex Corporation ('or the installation of the concrete parking area at Brewer Park. Section 2. That the payment in the amount • $5,979,00 be charged to the Land and Wat] Conservation Fund grant Account Number 00 1. 0000. 13 1.146 1, which currently has a balance of $167,233. q •a PASSED AND ADOPTED this day of re-julas 43 44 CITY ATTORNEY 45 10 & W91, Commission Vote: Mayor Russell: Vice Mayor Palmer: Commissioner Wiscombe: Aug 20.: 05 12 :42p Jorge 305- 361 -2316 p.1 General Contractors Rearmg Concrete Contr2ders Phone (305) 2292 Fax 361 -291 PROPOSAL DATE. -20 -2605 PROPOSAL SUBMUTZ0 TO. CUy Sea* Dfiwni Parhs� and Reeremdioe Dept (nit: Doug Baker) AIDDRE 6130 Swmea dr S sub Ia14imi R 331 PHONE: -19f- 9-12s6 JOB MUME. DrMer ftrk JOB $ d CATION. 57 .�A- SW & 62 Ale SoUth MiWM M ARCE37ECT.- nra DATE OF PLANS- sate JOB PHONE. We hereby subunit specifications and elates for l) Ncw Concrete Parking Slab—On n cxi stone parking area pp. 65 it 1 x 29 ft w -owner moves rA ties and hauls - - -- -rove rock to a depth of 5.5 inches —haul rock -- install wood form v oTk- install welded wire rnech pour 2,50 .0 psi concrete to a depth of 5.5 inchcs -broom s-. ept %airs: no permit, plans, engineering, surveys, processing included, price will vary if requested–no movement/ repair of asnder&,rou ncl utilities quoted ( hidden ). Price------- M,750 -50% down balance v,,hen final. Terms Of Proposal: 1) Acceptance of this proposal shall be acceptance of all terms and oanditions recited hereina or incorporated by reference, allowing JSM to commence preparation for work, signed proposal will constitute acceptance by brayer of this proposal and its terms and conditions. Quotation herein, unlless otherwise stated, is for immediate acceptance and not subject to cbange. 2) No back charges or claims shall be valid sunless previously authorized in writing by JSIr1 and unless written notice is given by owner to JSM tern (10) slays pp-'or- to the execution of charge explaining basis of proposed charge to be considered by JSM. for approval or denial. 3) All sums not paid when dude shall bear interest at the rate of 1.5% per rnorath ft-om due date until paid or the maximum legal rate permitted by law whichever is greater, plans all oasts of collection, including reasonable attorney's fees. Said rate of interest shall continue even past judgement. Due refers to date agreed in proposal but never more than 30 days from completion, unless agreed by bath panties and stated in proposals ) If paymetrt is not made to JSM as herein provided, alien JSM may stop work without prejudice to any rather remedy it may have. If on site -wari, is rcquired, buyer is to prepare all work areas so as to he asscesible and acceptable for JSMI's work JSM wila not be called upon to work until sufficient areas are ready to allow logical, continued and efficient proguess for the work until completion. 5) met° acceptance of this proposal, and unless othcrwise staid, JSNI shall be given reasonable time iL* which to make delivery of materials and labor to cornmence its performance. JSM shall not be responsible for delays or defaults of any kind, includ ag but not lim6ted to: delays caused by ou -ner, architects engineer, _._ _ ._ – ,. � � r ., ,' ,� � °- ;_. w �_ } /r� �� � _ sue,: _.— _— K � w �- R � A� �� '♦ �/}.p'p f _.n am n. r .. _ e a 'x' (� .. _. 1 P '" � J i r r .. �. _ m -� 1 ��� ,.__ .. ��:�