The Land and Water Conservation Fund (LWCF) grant for improvements to Brewer
Park includes the resurfacing of the existing tennis and racquetball courts. The
resurfacing work calls for patching low spots, repair of cracks, and the installation of an
acrylic resurfacing layer and three coats of textured acrylic surfacing. The installer is
also required to repaint all of the lines on the tennis and racquetball courts.
The Parks and Recreation Department has solicited quotations for the court resurfacing,
and the lowest responsive quotation was submitted by Welch Tennis Courts, Inc. in the
amount of $10,247.00. Welch Tennis Courts, Inc. is providing a one-year guarantee
against faulty workmanship andfor materials.
The attached resolution would authorize the City Manager to disburse funds in the
amount of $10,247.00 to Welch Tennis Courts, Inc. for this work. Funding is available in
the Land and Water Conservation Fund (LWGF) account # 001.0000.131.1461 that
currently has a balance of $167,233.
RECOMMENDATION
We recommend that the City Manager be authorized to disburse the amount of
$10,247.00 to Welch Tennis Courts, Inc. for the resurfacing of the tennis and
racquetball courts at Brewer Park.
RESOLUTION NO.
WHEREAS, the Parks and Recreation Department has received grant funding through the Florida
Department of Environmental Protection's Land and Water Conservation Fund (LWCF) for
improvements to Brewer Park, and
WHEREAS, one element of the improvements project is the resurfacing of the existing tennis and
racquetball courts; and
WHEREAS, Welch Tennis Courts, Inc. has provided the lowest responsive quotation for Or.
cR urt resurfacing.
NOW, THEREFORE, BE IT RESOLVED BY TBE MAYOR AND CITY COMMISSION OF
THE CITY OF SOUTH MIAMI, FLORIDA:
Section 1. That the City Manager is authorized to disburse $10,247.00 to Welch Tennis
Courts, Inc. for the resurfacing of the tennis and racquetball courts at Brewer Park.
Section 2. That the payment mi the amount of $10,247. 00 be charged to the Land and Water
Conservation Fund grant Account Number 00 1. 0000. 131.146 1, which currently has a balance of
$167,233.
PASSED AND ADOPTED this dav of
FIV99T411W13
FROM : D si; I D COQ iPTON FAX NO. : 5GI3308230 Sep. 14 2005 i O: 30PM P3
sliftote5; ASSOCIATION
DADE. (305) 255 -0252
BROWARD. (954) 443 -1711
FA: (305) ,378- 2395
CONSTRUCTION, INC.
16155 SW 117 AVENUE July 26, 2005
SUITE 26
MIAMI, FL 33177
City of South Miami
RE: Brewer Park
PROPOSAVAGREEMENT
CONDITIONS 2 Handball & % Basketball courts
1 Contractor will first pressure clean courts to remove mildew and dirt prior to resurfacing.
2. Contractor will flood courts and check for low spots, then will patch paddled areas as best as
possible, .to `a standard tolerance of 1/8 ", or the depth of a nickel:
3. Contractor will patch cracks with crack filler prior to resurfacing, and will roll entire court
area with 1 �/2 tom mechanical roller to smooth surface imperfections.
4. Contractor will resurface 2 existing court areas, approximately 100' a 60', as to California
Products Corporation specifications, using Plexipave materials with a 5- coat system as
follows: 2 coat acrylic Resurfacer and 3 coats Fortified Plexipave (see enclosed brochure).
5. Court colors to be: and (please specify).
6. Contractor will also restripe all playing lines to meet specifications, leaving court(s) ready for
play:
7. Contractor agrees to provide tools, materials, labor and supervision to complete the above
work for the sum of S 6,670.
8. Customer agrees to a lump sum payment of S 6,670 upon completion of the resurfacing.
9. Customer agrees to furnish access to site for equipment and materials.
10. Contractor guarantees workmanship and materials against defects for a period of THREE
YEARS, save normal wear and tear, Acts of Clod, vandalism and /or any structural damage
that may be pre- existing. Contractor cannot guarantee against future or the continuation of
root damage, if trees /plants are around perimeter. Nor can we guarantee against cracking
caused by age of asphalt.
MEMBER - -
1S COURT Aq�®
' WHOM
n
BUILDERS ASSOCIATION
City of South Miami
Brewer Park
Page 2
11 After completion of the resurfacing, proper court use and maintenance to be the sole
responsibility of the Customer,
12. Price subject to change if contract is not accepted within 90 days.
13. Work to commence at a date agreed upon by both parties, after Contractor receives a signed
copy of this contract from Customer.