Loading...
00-0044-035 P.T. WOOD 1/2" DRYWALL FIN. BLOCKING, SET IN CONTINUOUS METAL SUPPORT m 5f$" STUCCO FIN. OD T SS BEYOND a ® SEALANT BED. L BRACKET .wa - P —CAST Op q, spa" Y >~ n m °° R`Il GATT INSUL. GONG. LINTEL, SEE M v DRAWINGS FOR SIZE 4 REINF. TM "mr-1.1 -STUCCO CONT. CAULKIN G 1 X 4 P.T. UJD. BLK. Wf HILTI ❑BIDDING SET ONLY PINS S 099-112 HC AT 12" O.G. ST D ro" IMTER SEALANT O C. LINTEL ❑CONSTRUCTION SET ONLY -2 X ro T H A R FROM TOP AND BOTT. OR AND BACK BEDDING ONY PE "X" GYPSUM WALL A OR ER BASE'S ❑BUILDING PERMIT SET ONLY 2 TAP—CONS AT 24 O.C. APPLIED AT RIGHT ANGLES OR PARALLEL TO EACH SIDE OF 3 5/8 3" TAP—CON AT 24" O.G. STAGGERED ATTACHMENT WINDOW TO 1/2" DRYWALL OD MOLDING. 25 GAUGE METAL STUDS 24" ON CENTER WITH P TYPE S DRYWALL SCREWS WOOD BLOCKING AS PER � REVt WINDOW MANUFACTURER 2x4 D FRAME 6" ON CENTER TO VERTICAL EDGES AND 12`° ON CENTER TO TOP AND BOTTOM REV2 SPECIFICATIONS. 1x3 OD E ERS INTERMEDIATE STUDS. ST ER ALL VERTICAL AND HORIZONTAL JOINTS 24°` REV3 TO BE:X 3 FOR WNDCU* ON CENTER EACH SIDE AND OPPOSITE SIDE AND I X d FOR S)GZ%AND NAILEA WITH HILT[ (1) LAYER 5/S" TYPE "X'" � .OPA AND MC HC AT a'mac.Arun 3® DETAIL WP 12@@ FROM THE DESIGN � TOP,aru,eorrcm,, GYP. BD. ADHERED TO PLYWOOD SHEATHING W/P.V.C. MANUAL OF THE GYPSUM ASSOCIATION 4 "J" BEAD AT PERIMETER �D �2 E�X T�ER I�OR�D O�O R�H EA D�E R�D E�T A�IL D 2 )WINUUW HEAD' DETAIL s x3 P.T. WOOD a AFFIX SEAL HERE 1/2" DRYWALL FIN. BLOCKING, SET r2/a" STUCCO FN. IN CONTINUOUS SEALANT BED. 11 2 Q 0" GONG. BLK, Wf I E, WOOD BLOGKINGWI WINDOW O R BA FILLED Wf GONG. tb WIN OW MANUF'AGTURER AD-2 D-2 D RaTff W A L L mu E T A I L (C".0" LAI A R A CIE CONT. CAULKING 1 X 4 P.T. WD. BLK, Wf HILTI PINS #CRS 099-112 HC AT • 12" O.C. STAGGERED ro" CL 2 X G RA55ETED 14EADS FROM TOP AND BOTT. OR 2" TAP-CONS AT 2411 O.C. WEATHERSTRIPPING 3" TAP-CON AT 24" O.G. STAGGERED v PERIMETER SEALANT AND BACK BEDDING FRONT VIEW I STUCCO 4 a - A mm 2 rT PfRE-FAB ROOF TRISSES a 24'OL, 25 Z Q� SEALANT ROOF TRUSS. ----- 2 x 4 BRIDGINa 24'QC. .0 'o I" WALL Q 00 ° S WS SEALANT AL E.A TRUSS . . 3 5/6" METAL - HEAD - —RUNNER CONT. L A 3 1/2" STANDARD = PRE-CAST 1/2" STAND. :�TIF FINISNED DRYWALL GONG. LINTEL DRYWALL 5/8 'X DR L ON 1 x 3 FU 00 D L 3/4'METAL HI-HATS a 24'O.C. � . ® . . SEALANT C - FINISHED AS PER SCHEDUE ATTACHMENT Oi JO F SLD f SEALANT PER SCHEDULE PLAN 25 �A. FIRE RA JOINT � LOCKING AS 3 5/5" METAL OVER FIBERGLASS TAPE 1. 1-HR FIRE-RATED GYPSUM WALL ASSEMBLY. WINDOW MANUFACTURER 1X4 P.T. WOOD STUDS 'a 24" O.0 SPECIFICATIONS. BUCK SET N CONT. 3 5/5" METAL 2. 1-1/2" DIA. (OR SMALLER) SCHEDULE 40 PVC O CPVC PIPE OR � 11 SCREEN SEALANT BED. 10 CUT NAIL --RUNNER GOVT. 5/8' "X'DR �L E SIDE OF 1°' DIA lOR SMALLER) PB OR COPPER PIPE 1CLO5ED PIPING SYSTEM). 0 (WHEN QUI D) TEMPS D GLASS 12 O.G BASE AS 3-5/8 STEEL STUDS 24 QC.l SEE PER SCHEDULE DETAIL 3,614T A-1). 3.MINIMUM 4-3/4" DEPTH NILTI F5 611A FIRE STOP SEALANT. ASE ©NG. SLAB 4. SCHEDULE 40 STEEL SLEEVE ) (SEE NOTE NOTES : 1.FOR 1-1/2" DIA. (OR SMALLER) PVC OR CPVC PIPE THE MAX. DIA. 00 OF THE SLEEVE IS 3", AND ANNULAR SPACE = 1/211. @@ . • 2.FOR I" (OR SMALLER) P5 (POLYBUTYLENE) PIPE THE MAX. DIA, OF r D-2 S L I D&INO G D 000%R H E A D D E T A I L D-2 �9 WIDE, o SLEEVE IS 4", AND ANNULAR SPACE = MIN. P TO MAX. 1-1/2". C7 W ®, • •NOMBEARING PARTITION vs SEE HILTI FIRE STOP INSTALLATION MANUAL FOR ADDITIONAL INSTRUCTIONS 1. ti ALL ---S 5/8' HILTI, ING. TULSA, I-8@@-819- @@ 1/2'D K' THICK MIN U.L. SYSTEM NO. WL2051/U L2 @52 � coo J p 5EAD F RATING = 1-HR METAL FLASHING(GALVANIZED) SEALANT CARPET cA SPANISH 'S'T LE T TING = 3/4-HR 2 x WD STUD 0 24" O.G. ` tm%,000 ca OR. 00 r QQ c $BB G. O 00 i " .' o MIN. SLAB 0 �• .� ® ® AN R5 �T L R R TO STRJMRAL DWiS. r ® ® FOR SIB AND METHOD OF I ATTAG ) I I SECTION A-A ► 7 I FRONT VIEW con �\�D-2 �SS I'LL I�DMINM�'Go"" DVO�OR�S%01L�LD�XT�AIL... D-2 F L A S H I"No D E T A IL C l - A � 2 CKD W �- ——— TYPICAL METAL STUD PARTM --- P -CASTCONC. LINTEL, SE DRAWINGS FOR SIZE 4 REINF TYPICAL 2x6 WOD B � 000 • s a 1gxLOCKING WOOD O 0 1. WALL ASSEMBLY : A IN CONTINUOUS 1/2" DRYWALL SEALANT BED. 2-HR.FIRE-RATED GYPSUM WALL. HE FU ER RING STRIPS 3 SEE ST GT. D S. TUGGO C` 2. TELEPHONE GABLE )MAX. 25 PR.N0. 24 A ). E )METER SEALANT INSULATION BOTTOM CHORD OF ROOF TRUSSES I 3.HILTI FS 605 OR EGUIVALENT FORCED INTO AULAR SPACE TO MAX EXTW P05515LE, o Q SEALANT AND BACK BEDDING ATTAG ENT I°' x 3°' FURRING AT 16" ON CENTER ONE I AND BUILD UP 1/4" CROWN AROUND CABLE A$ 5 WINDOW TO OD SNAP IN GLAZING I O LDGKC AS PER BB ° BB BEAD (TYR) LAYER 5/8 TYPE X°, GYPSUM WALLBOARD, 5d CEMENT COATED WIND ` INYL ATHER OR RING SWANKED NAILS 6" ON CENTER, PAPER TAPE BEDDED f a MANUFACTURER STRIPPI G IN GEMENTITIOUS COMPOUND OVER JOINTS, EXPOSED NAIL HEADS I NOTE ; MAXIMUM DIAMETER OF OPENING = 1/2", SPECIFICATIONS. COVERED WITH COMPOUND AND PRODUCT APPROVED INSULATION I SEE HILTI FIRE STOP INSTALLATION MANUAL FOR ADDITIONAL INSTRUCTIONS CAULK OF FIBERGLASS OR MINERAL L BATTS, OR CELLULOSIC I �NQI A ERBE�pINC� INSULATION HAVING A MINIMUM VALUE OF R 11 HILTI, INC. TULSA, OK I-8 @ @-819-8 @ @@ MARBLE SILL 4 4 -� U.L. SYSTEM NO. WL3 058 .' TUCCO F RATING = 2-HR T wKm&Amq1"1NG lsssAlAd rin. NOTE: ALL WINDOWS SILL TO BE PRECAST NG TE 9 CPABLE THRU 'I—H'K Go&%1 ffr P S EUN'Mm of UNLESS DENOTED OTHERWISE ON STRUCTURAL DRAWINGS. D-2 WINUVW HEADER & S&L DETAIL �D-2 "'m TEIJ` G`AKAGE CL'u 2FKE KA i I KAF 1 1 No G DLETAILAk D-z m "mmm mBL%ff