Loading...
01-0597-019 FF��j, 0 MECHANICAL SPECIFICATIONS - L SQUARE ELBOWS WITH DOUBLE THICKNESS 9, 05 AFTER ALL PRESSURE TESTS ARE SATISFACTORILY 6, 03 PR❑VIDE AL 1. 0 GENERAL CONSTRUCT ROUND DUCT ELBOWS ❑F ING SYSTEMS, TURNING VANES. NOT LESS COMPLETED, EACH REFRIGERANT PIPING SYSTEM SHALL BE 1. 01 PROVIDE COMPLETE, PROPERLY FUNCTION THAN FIVE ( 5) SECTIONS, EVACUATED WITH AN APPROVED HIGH VACUUM PUMP TO A VACUUM 1. 02 DRAWINGS ARE DIAGRAMMATIC. PRODUCE ACC URATE SHOP 6, 04 CONSTRUCT ALL TRANSFORMATI❑NS IN DUCT SIZE AND OF 50 TO 100 MICR❑NS AND HELD FOR A PERI❑D OF NOT LESS DRAWINGS AND PROVIDE MINOR COMPONENTS REQUIRED TO SHAPE WITH A MAXIMUM ANGLE OF 15 DEGREES BETWEEN THE THAN 3 HOURS, THIS PROCEDURE SHALL BE REPEATED 3 TIMES OBTAIN COMPLETE AND PROPER SYSTEMS. DUCT CENTERLINE AND ANY SIDE OF THE TRANSITION. ALL BREAKING THE VACUUM WITH DRY NITROGEN OR DRY CARBON 1. 03 MANUFACTURER' S NAMES ESTABLISH TYPE, CLASS AND DIOXIDE THE FIRST 2 TIMES, AND WITH THE REFRIGERANT QUALITY. BRANCHES SHALL ENTER THE MAIN AT LARGE END OF USED IN THE SYSTEM THE 3RD TIME. AFTER FINAL CHARGING WORK WITH OTHER TRADES. TRANSITION ❑R BEFORE TRANSITION, WITH REFRIGERANT, THE SYSTEM LIQUID INDICATOR SHALL International 1. 04 COORDINATE ALL 6. 05 SEAL ALL JOINTS IN DUCTWORK WITH AN APPROVED FIRE 1. 05 ALL COMPONENTS SHALL BE STANDARD CATALOGED INDICATE A DRY C❑NDITI❑Nj IF ANY MOISTURE IS PRESENT IN ' PRODUCTS OF APPROVED U. S. MANUFACTURERS, SUBSTANTIATED RETARDANT GLASS FIBER REINFORCED HIGH VELOCITY DUCT THE SYSTEM, THE DEHYDRATION PROCEDURE SHALL BE REPEATED Design P artn e r S hI p BY PUBLISHED DATA] SHALL ESSENTIALLY DUPLICATE SEALANT UNLESS OTHERWISE INDICATED, AS EQUIPMENT AND MATERIALS THAT HAVE BEEN IN SATISFACTORY 6, 06 CONTROL ❑FLAIRLDISTRIBUTRI❑N. V❑LUMEFDAMPERSLSHALL BE 10. 0 PIPE HANGERS AND SUPPORTS Incorporated USE FOR A PERIOD ❑F TWO YEARS, AND SHALL BE NEW AND 10. O 1 SPAC I NGI 1/2' TO 3/4' - 3, 5 FEET MAXIMUM, 1" TO 1-1/4' FREE FROM DEFECTS, CONSTRUCTED OF 16 GAGE SHEET METAL] DAMPERS UP T❑ 12 - 4. 5 FEET MAXIMUM, 1-1/2" TO 2' - 5. 5 FEET MAXIMUM, 2- 1, 06 WHERE CONTACT ❑F DISSIMILAR MATERIALS MAY CAUSE INCHES IN WIDTH MAY BE SINGLE BLADE AND OVER 12 INCHES 1/2' AND LARGER - 7. 5 FEET MAXIMUM. CORROSION ❑R ELECTROLYTIC ACTION, SEPARATE MATERIALS BY SHALL BE MULTI-BLADE WITH A MAXIMUM BLADE WIDTH OF 9 10, 02 HANGERS FOR AND SUPPORTS SHALL BE GALVANIZED WROUGHT 30, W. Mashta Drive MEANS ❑F SYNTHETIC RUBBER ❑R PLASTIC GASKETS, GROMMETS INCHES. SINGLE BLADE DAMPERS SHALL BE PROVIDED WITH 1- STEEL CLAMP OR CLEVIS TYPE, PLACED OUTSIDE THE Key Biscayne, Fl 33149 AND IS❑LATI❑N FITTINGS, AS REQUIRED. 1/2 X 1/8 INCH GALVANIZED STEEL CHANNEL FRAME. EACH INSULATION, OR ISOLATED FROM UNINSULATED PIPE BY MEANS CODES AND STANDARDSi ALL WORK SHALL CONFORM TO DAMPER BLADE SHALL BE SECURELY ATTACHED TO A 1/2 INCH OF RIBBED SYNTHET I C RUBBER ISOLATION PADS, Tel: 305.365.8338/Fax: 305.365.8339 1. 07 DIAMETER STEEL PIVOT ROD MOUNTED IN BRONZE FRAME THE REQUIREMENTS OF THE FOLLOWING STANDARDS AND CODES INSERTS; EACH ROD SHALL BE EXTENDED TO A LOCKING 11. 0 INSULATION AS MODIFIED BY LOCAL ORDINANCES QUADRANT WITH INDICATING DEVICE MOUNTED ON THE SIDE OF 11. 01 INSULATION SECTIONS OR SEGMENTS SHALL BE PROPERLY CUT AND FITTED TO EACH SURFACE, TIGHTLY BUTTED TOGETHER AND SYSTEMS SECURED WITH STAINLESS STEEL BANDS OR 14 GAUGE No. Issue Date A. NFPA 90A - AIR CONDITIONING AND VENTILATION THE DUCT. B. SOUTH FLORIDA BUILDING CODE. 6. 07 ALL DUCT PENETRATIONS THROUGH FIRE OR SMOKE RATED COPPERWELD WIRE ON 9' MAXIMUM CENTERS. ALL SEAMS AND WALLS AND FLOORS SHALL BE SEALED WITH A UL LISTED JOINTS SHALL BE THOROUGHLY SEALED WITH AN APPROVED FIRE- C. UNDERWRITERS' LABORATORIES.OD D. SMACNA SYSTEM TO MAINTAIN THE FIRE AND SMOKE INTEGRITY OF THE RETARDANT JOINT SEALER AS RECOMMENDED BY THE INSULATI❑N WALL OF FLOOR. MANUFACTURER, E. ASHRAE F. NFPA 13 - INSTALLATI❑N OF SPRINKLER SYSTEMS. 6. 08 WIRE FLEXIBLE DUCTS SHALL BE OF THE INSULATED REINFORCED FABRIC OR METAL TYPE. FLEXIBLE DUCTS SHALL 11, 02 REFRIGERANT SUCTION LINES AND FITTINGS SHALL BE 1 2, 0 SPECIAL CONDITI❑NS NOT EXCEED 8' IN LENGTH, DUCTS SHALL BE FACTORY INSULATED WITH FOAM PLASTIC PIPE INSULATION SUCH AS AP 1 2. 01 ALL PROPOSALS TO PERFORM WORK UNDER THIS SPECIFI INSULATED WITH 1' THICK, 3/4 PCF GLASS FIBER WITH AN ARMAFLEX ❑R AS APPROVED, CONDENSATE DRAIN LINE CATION SHALL BE BASED ON A THOROUGH INVESTIGATION ❑F INSULATION SHALL BE 3/4' THICK, WHERE POSSIBLE, SLIDE ACTUAL CONDITIONS AT THE JOBSITE, AND SHALL INCLUDE ALL APPROVED FIRE-RETARDANT VAPOR BARRIER FINISH. DUCTS INSULATION ON WITHOUT SPLITTING. WHERE THIS IS NOT SHALL CONFORM TO THE REQUIREMENTS FOR CLASS 1 POSSIBLE, USE MANUFACTURER' S RECOMMENDED ADHESIVE TO WORK REQUIRED TO INTRODUCE SYSTEM COMPONENTS INTO CONNECTORS WHEN TESTED IN ACCORDANCE WITH SECTIONS 3 CEMENT JOINTS TOGETHER. ADDITIONALLY SECURE WITH TAPE EXISTING STRUCTURES, AND TO CONNECT TO OR MODIFY EXIST INSTALLATION. ALL THRU 21 ❑F STANDARD FOR AIR DUCTS ( UL-181-1986) . OR 14 GAUGE COPPERWELD WIRE ON 9' CENTERS. FINISH ING SYSTEM AS NECESSITATED BY THE SUCH WORK SHALL BE PERFORMED WITHOUT IN ADDITI❑NS TO THE FLEXIBLE DUCT SHALL ALSO COMPLY WITH THE REQUIREMENTS ❑F NFPA 90A. COMPOSITE BENDS AND TURNS IN EXCESS OF 90 EXPOSED INSULATION WITH TWO COATS OF WHITE LATEX PAINT CONTRACT COST. DEGREES SHALL BE AVOIDED, CONNECTI❑NS OF FLEXIBLE OR ARMAFLEX FINISH. 2. 02 WHERE INDICATED EXISTING SYSTEM COMPONENTS SHALL DUCTS T❑ CEILING DIFFUSERS AND DUCT TAPS SHALL BE MADE 11. 03 PROVIDE INSULATING SADDLES FOR INSULATED LINES AT EACH BE CAREFULLY REMOVED OR RELOCATED, EACH RESULTING PIPE SUPPORT. THE INSULATION SADDLE SHALL BE 16 GAUGE OPENING IN THE BUILDING STRUCTURE SHALL BE PROPERLY AIR TIGHT WITH A STAINLESS STEEL BAND CLAMP WITH WORM GALVANIZED STEEL INSTALLED BETWEEN HANGER AND PATCHED AND FINISHED WITH THE SAME MATERIALS AS THOSE GEAR AND SCREW. INSULATI❑N AND SHALL BE TWICE AS LONG AS OUTSIDE ADJACENT T❑ THE OPENING. 7. 0 AIR OUTLETS AND INLETS DIAMETER OF INSULATION. S 7. 01 TEST AND RATE ALL AIR OUTLETS AND INLETS IN 12. 0 CONTROLS CLIENT APPROVAL 3, 0 SHOP DRAWING THE FOLLOWING SHOP DRAWINGS, ACCORDANCE WITH ADC EQUIPMENT TEST CODE 1062R4, AND I have reviewed these plans and have been 3. 01 SUBMIT COPIES ❑F A. DETAILED INFORMATION F HE F FOR ALL EQUIPMENT, PROVIDE THE PROPER SIZE AND TYPE TO OBTAIN SATISFACTORY 12. 01 GENERALS PR❑VIDE ELECTRIC, ELECTRONIC OR COMBINATION given the opportunity to ask questions about \ DAMPERS, ROOF FAN, AIR D I STR I BUT I ON DEVICES AND DISTRIBUTION ❑F THE SPECIFIED AIR QUANTITIES WITHIN CONTROLS FOR NEW AND RELOCATED EQUIPMENT. them prior to issue. These plans conform / DAM I L I S, I ES. EACH SPACE, CONSTRUCT ALL GRILLES, REGISTERS AND DIFFUSERS 12, 02 ALL TRANSFORMERS AND CONTROL DEVICES FOR ELECTRIC AND to our requirements. I understand that any B. DETAILED LAYOUTS ❑F EACH EQUIPMENT AREA, ENTIRELY ❑F ALUMINUM W I TH PAINTED F I N I SH UNLESS ELECTRONIC CONTROLS SHALL BE PROVIDED. modifications to these plans will be an additional service with potential impact on SHOWING ALL EQUIPMENT, PIPING AND DUCTWORK. OTHERWISE INDICATED. PROVIDE EACH AIR OUTLET AND INLET 12. 03 ALL WIRING REQUIRED FOR ELECTRIC AND ELECTRONIC CONTROL P P WITH A SYNTHETIC SPONGE RUBBER GASKET TO FORM A TIGHT SYSTEMS SHALL BE FURNISHED AND INSTALLED UNDER THE construction cost and scheduling. C. COMPLETE COMPOSITE DIAGRAMS, ELECTRICAL WORK, THIS CONTRACTOR SHALL El AS IS DESCRIPTIONS AND SEQUENCE OF ❑PERATI❑N FOR CONTROL SEAL BETWEEN FRAME AND MOUNTING SURFACE, SECTION, EL SYSTEMS IN THEIR ENTIRETY, SHOWING THE SPECIFIC 7. 02 ALL CEILING RETURN AIR GRILLES AND EXHAUST PROVIDE COMPLETE DIAGRAMS AND INSTRUCTIONS AS REQUIRED El ACCEPTED AS NOTED REGISTERS SHALL BE SQUARE GRID TYPE, WITH 1/2 X 1/2 FOR INSTALLATION UNDER THAT SECTION. D. COMPLETE DETAILS OF ALL HANGERS, I NCH GR I D 1/2 INCH DEEP, FREE AREA SHALL NOT BE LESS 13. 0 FILTERS LTERS Signature: Date: EQUIPMENT FURNISHED, THAN 90 PERCENT. 24 SUPPORTS AND VIBRATI❑N ISOLATORS. " X 24' GRILLE SHALL HAVE A HINGED 13. 01 PR❑VIDE ❑NE SET OF THROWAWAY FILTERS T❑ BE USED DURING 3. 02 SHOP DRAWINGS SHALL INCLUDE CAPACITIES, OPERATING FRAME AND A 1' FILTER RACK. EXHAUST REGISTERS SHALL CONSTRUCTI❑N. FILTERS SHALL BE VISC❑US IMPINGEMENT PRESSURES AND TEMPERATURES, SERVICE RATINGS, SOUND HAVE A KEY OPERATED OPPOSED BLADE DAMPER. GRILLES AND TYPE, WITH GLASS FIBER MEDIA AND DISPOSABLE FRAMES] LEVELS, PHYSICAL STRUCTURE, WEIGHTS, AND EXHAUST REGISTERS SHALL BE T I TUS WITH STYLE 50F CORE OR THICKNESS OF MEDIA SHALL BE 1' . All drawings and written material herein, as instruments POWER L DIMENSIONS EVE AS REQUIRED, ALL PERFORMANCE DATA AND AS APPROVED. 13. 02 NEW FILTERS ARE TO BE INSTALLED IN THE UNITS PRIOR TO of service, shall remain the property of International DIMENSIONS SHALL BE CERTIFIED BY THE MANUFACTURER WITH 7. 03 NEW CEILING DIFFUSERS W I TH A 24" X 24' FACE SHALL F I NAL TEST AND BALANCING. THESE F I LTERS SHALL ALSO BE Design Partnership, Inc. (IDP) and shall not be reproduced DIMENSIONS AUTHORIZED MENS FACTORY SIGNATURE.CERTIFIED F I BE PERFORATED FACE, CURVED BLADE, 1, 2, 3 OR 4-WAY THROWAWAY TYPE AS SPECIFIED ABOVE. PROVIDE ONE w copied, in whole or in part, without the expressed DEFLECTORS W I TH A 2' X 2' LAY-IN TYPE FRAME. DIFFUSERS ADDITI❑NAL COMPLETE SPARE SET OF FILTERS T❑ BE USED written consent of IDP and may not be used or 3. 03 NO EQUIPMENT OR MATERIALS SHALL BE PURCHASED OR referenced for any other project. Information contained INSTALLED PRIOR TO FINAL APPROVAL OF SHOP DRAWINGS. SHALL HAVE A ROUND NECK OF THE S I ZE I ND I CATED. AFTER TEST AND BALANCE. herein represents proprietary information of International 4. 0 TESTING AND BALANCING DIFFUSERS SHALL BE PROVIDED COMPLETE WITH OPPOSED BLADE 14. 0 VIBRATION I SOLATORS Design Partnership and/or its Client and shall not nt 4. O 1 SUBJECT THE COMPLETED SYSTEMS AND ALL COMPONENTS DAMPERS SUCH AS TITUS M❑DEL AG-75. THE CEILING 14. 01 HORIZONTAL AIR HANDLING UNIT SHALL BE INSTALLED WITH disclosed to others. Those who use these documents THEREOF T❑ OPERATING TESTS, AS SPECIFIED HEREIN, AND AS D I FFUSERS SHALL BE SUCH AS T I TUS MODEL PCS-AA. SPRING TYPE ISOLATION MOUNTS SUCH AS MODEL BSS-100 AS do so in confidence. REQUIRED TO DEMONSTRATE ACCEPTABILITY OF SYSTEMS. TESTS 7. 04 PR❑VIDE AIR VOLUME EXTRACTORS AT ALL RECTANGULAR MANUFACTURED BY THE AMBER/BOOTH COMPANY ❑F H❑UST❑N, SHALL BE PERFORMED BY AN APPROVED AGENCY AND AT THE BRANCH DUCT TAKE-OFFS. AIR VOLUME EXTRACTORS SHALL BE TEXAS. Architect of Record: CONTRACTOR' S EXPENSE. CAPABLE OF PROVIDING A COMPLETE SHUT-OFF AND SHALL BE 15. 0 AUXILIARY DRAIN PAN Charles Myers EQUIPPED WITH A MANUAL OPERATOR WITH GRADULATED DIAL 15. 01 AUXILIARY DRAIN PAN MAY BE REL❑CATED, 4. 02 RECORD AND TABULATE ALL DATA NECESSARY TO TYPE INDICATOR AND LOCKING OUT MOUNTED IN AN ACCESSIBLE 15. 02 ALL JOINTS AND SEAMS SHALL BE SOLDERED LIQUID TIGHT. DEMONSTRATE THE CAPACITY OF EACH NEW AND RELOCATED LOCATION. AIR EXTRACTORS SHALL BE FACTORY FABRICATED 15. 03 DRAIN PAN LIP SHALL HAVE A PIPED CONNECTION WITH DRAIN State of Florida SYSTEM COMPONENT UNDER ACTUAL OPERATING C❑NDITI❑NS. DATA FOR EACH ITEM OF EQUIPMENT SHALL BE RECORDED AND ASSEMBLED. EXTRACTORS SHALL BE TITUS MODEL AG-45. PIPING CONNECTED T❑ PRIMARY CONDENSATE DRAIN PIPING. Registration # SIMULTANEOUSLY WITH DATA FROM ALL ASSOCIATED EQUIPMENT, WHERE LENGTH ❑F EXTRACTOR EXCEEDS 12' , PROVIDE A TITUS 15. 04 PAN SHALL BE PROVIDED WITH A MOISTURE SENSOR TO DE- AR0014546 TOGETHER WITH COINCIDENT OUTSIDE AIR DRY BULB AND WET XY-02644-1 ROLLER SUPPORT. ENERGIZE THE UNIT. BULB TEMPERATURES. DATA SHALL INCLUDE, 8. 0 SPLIT SYSTEM AIR HANDLING UNIT 16. 0 POWER VENTILATOR A. SUPPLY, RETURN AND OUTSIDE AIR 8. 01 THIS UNIT IS EXISTING AND SHALL BE CAREFULLY 16. 01 POWER VENTILATOR SHALL BE TESTED AND RATED IN QUANTITIES FOR RELOCATED AIR HANDLING UNIT. RELOCATED AS INDICATED. ACC❑RDANCE WITH THE REQUIREMENTS OF AMCA, AND SHALL BE B. AIR VOLUMES AND VEL❑CITIES FOR RELOCATED 9. 0 REFRIGERANT PIPING SELECTED T❑ DELIVER THE SCHEDULED AIR QUANTITY AGAINST AIR HANDLING UNIT FAN, C❑❑LING COIL, AIR CLEANING 9. 01 TYPE K HARD-DRAWN COPPER TUBE. ALL JOINTS, THE SYSTEM RESISTANCE AS INSTALLED. FAN SHALL BE ASSEMBLY AND NEW ROOF FAN. C❑NNECTI❑NS AND BENDS SHALL BE MADE WITH WROUGHT COPPER STATICALLY AND DYNAMICALLY BALANCED AT THE FACT❑RYj FAN C. ENTERING AND LEAVING AIR DRY BULB AND SOLDER-JOINT FITTINGS] JOINTS SHALL BE BRAZED WITH BLADES AND HOUSING SHALL BE OF PROPER DESIGN, WET BULB TEMPERATURES FOR RELOCATED COOLING COIL. SILVER BRAZING ALLOY. ALL PIPE AND FITTINGS SHALL BE SUFFICIENT STRENGTH AND RIGIDITY TO OPERATE UNDER INTERVAL D. AIR VOLUMES AND VELOCITIES AT EACH INLET DESIGNED FOR A WORKING PRESSURE OF 300 PSI AT 150 INSTALLED CONDITI❑NS WITHOUT OBJECTIONABLE NOISE OR AND OUTLET. DEGREES F. ALL ELBOWS SHALL HAVE A MINIMUM CENTERLINE VIBRATI❑N. ALL STEEL SURFACES SHALL BE PROVIDED WITH E. MEASURED VOLTAGE AND CURRENT INPUT FOR RADIUS EQUAL TO THE NOMINAL PIPE DIAMETER. AN APPROVED CORROSION-RESISTANT COATING. EACH NEW AND RELOCATED MOTOR. 9. 02 DEHYDRATORS SHALL BE IN-LINE TYPE FILTER-DRIERS 16. 02 VENTILATOR OUTLET SHALL BE COMPLETELY PROTECTED WITH INTERNATIONAL 4. 03 SUBMIT TEST DATA FORMAT FOR APPROVAL PRI❑R TO WITH WELDED STEEL SHELLS AND SOLDER CONNECTIONS, BIRD SCREEN, DESIGNED FOR A WORKING PRESSURE OF 300 PSI AT 150 16. 03 POWER VENTILATOR SHALL BE FACT BEGINNING OF TESTS. UPON COMPLETION OF TESTING AND DRY ASSEMBLED UNIT, BALANCING PROCEDURES, SUBMIT FOUR N C❑PIES OF ALL DEGREES F. DESICCANT SHALL BE ❑F THE NON-POWDERING, COMPLETE WITH CENTRIFUGAL FLOW FAN, MOTOR AND DRIVE. TEST DATA FOR RECORD AND APPROVAL. MOLDED-CORE TYPE WITH SUFFICIENT AREA TO OBTAIN A 16. 04 VENTILAT❑R SHALL BE CONSTRUCTED AND INSTALLED TO 8th Floor 5. 0 IDENTIFICATION AND RECORD DRAWINGS MAXIMUM PRESSURE DROP OF 1 PSI AT DESIGN FLOW] CAPACITY WITHSTAND A WIND PRESSURE OF 60 PSF FROM ANY DIRECTION 6262 Sunset Drive 5. 01 IDENTIFY ALL EQUIPMENT, SWITCHES, STARTERS AND RATINGS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF AND TO PREVENT ENTRY OF WATER INTO THE BUILDING OR THE CONTROLS BY MEANS OF ENGRAVED VINYL PLASTIC NAMEPLATES. ARI STANDARD 710. VENTILATING SYSTEM UNDER ALL WEATHER C❑NDITI❑NSj Miami, F1 33t43 PROVIDE COMPLETE CONTROL DIAGRAMS WITH OUTLINE 9. 03 LIQUID INDICAT❑RS SHALL BE DOUBLE-PORT COMBINATI❑N WEATHERPROOF COVER SHALL BE PROVIDED FOR MOTOR AND OPERATING INSTRUCTIONS, PROPERLY CODED TO MOISTURE AND LIQUID INDICATORS WITH BRASS BODY, DRIVE. IDENTIFICATION PLATES. THREADED SEAL CAPS AND SOLDER CONNECTI❑NS, DESIGNED FOR 16. 05 VENTILATOR SHALL BE PROVIDED WITH INTERNAL VIBRATION IDE 5. 02 I DEPROVIDE A COMPLETE SET ❑F RECORD DRAWINGS, SHOWING A WORKING PRESSURE OF 450 PSI AT 150 DEGREES F. ISOLATORS. Owner: Jeff Weiss THE EXACT INSTALLED L❑CATION OF EACH COMPONENT OF THE 9. 04 AFTER ALL REFRIGERANT P I P I NG HAS BEEN INSTALLED, 16. 06 UNIT SHALL BE EQUIPPED WITH A UL WEATHERPROOF 433 Plaza Real, Suite 275 AIR COND I T I❑N I NG SYSTEMS, MANUFACTURER' S NAMES AND BUT BEFORE P I P I NG IS CONCEALED, EACH SYSTEM SHALL BE DISCONNECT SWITCH. Boca Raton, FL 33432 DESIGNATIONS FOR ALL NEW MAJOR ITEMS OF EQUIPMENT, AND TESTED AT NOT LESS THAN 150% OF THE MINIMUM FIELD LEAK 16. 07 FOR DETAILED REQUIREMENTS SEE THE VENTILATION EQUIPMENT FINAL A I R QUANTITIES, OPERATING PRESSURES AND TEST PRESSURES SPECIFIED IN THE ANSI B9. 1 SAFETY CODE SCHEDULE AND THE NOTES BELOW IT. Contact: Jeff Weiss, (561) 416-4600 TEMPERATURES. FOR THE SPECIFIC REFRIGERANT USED, TESTS SHALL BE 17. 0 GUARANTEE 6. 0 DUCTWORK APPLIED BY FIRST CHARGING THE SYSTEM TO APPROXIMATELY 17. 01 ALL NEW EQUIPMENT SHALL BE GUARANTEED TO HAVE THE 6. 01 ALL SUPPLY AIR AND RETURN AIR DUCTWORK SHALL BE 10 PSI, THEN CHARGING WITH DRY NITROGEN ❑R DRY CARB❑N SPECIFIED CAPACITIES AND T❑ OPERATE WITHOUT Date: 03-200 CONSTRUCTED OF FIBR❑US GLASS DUCT BOARD UNLESS DIOXIDE TO THE FULL TEST PRESSURE] AFTER WHICH THE OBJECTIONABLE NOISE OR VIBRATION UNDER INSTALLED Project No: 2013.00 OTHERWISE INDICATED. CONSTRUCTI❑N AND INSTALLATION ENTIRE PRESSURIZED SYSTEM SHALL BE CHECKED FOR LEAKS CONDITI❑NS. Drawn By: SJB SHALL COMPLY WITH SMACNA FIBR❑US GLASS DUCT WITH A HALIDE OR ELECTRONIC DETECTOR. IF ANY LEAKS ARE 17. 02 PROVIDE A WRITTEN WARRANTY COVERING ALL EQUIPMENT, Checked By: JEA CONSTRUCTION STANDARDS. DETECTED, THE DEFECTIVE PIPE, F I TT I NG OR JOINT SHALL BE MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM CADD File 00-55\MECHANICAL.DWG REMOVED AND REPLACED] PEENING OR CAULKING OF LEAKS WILL THE DATE OF FINAL ACCEPTANCE OF BENEFICIAL USE BY THE 6. 02 ALL OUTSIDE AIR AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEET STEEL. DUCTWORK SHALL NOT BE PERMITTED. AFTER REPAIRS ARE COMPLETED, THE OWNER, WHICHEVER IS EARLIER] THIS SHALL INCLUDE AN BE FABRICATED IN ACCORDANCE WITH THE 1975 ASHRAE TESTS SHALL BE REPEATED AS REQUIRED TO DEMONSTRATE THE AGREEMENT TO REPLACE ALL DEFECTIVE EQUIPMENT OR Title: HANDBOOK-EQUIPMENT, CHAPTER 1, TABLE 4 AND SMACNA LOW ACCEPTABILITY ❑F EACH SYSTEM. MATERIALS AND REPAIR ALL DEFECTIVE WORKMANSHIP DURING VELOCITY DUCT CONSTRUCTION STANDARDS, EXCEPT AS THE WARRANTY PERIOD WITHOUT COST T❑ THE OWNER. MECHANICAL OTHERWISE INDICATED HEREIN. 4 -- - _ -- - , Joliet-D\ DEQ -'^_ ------ AxE: HS_IV7ICATE=D- - � gNZER tA { ra L $ CERTIFICATE OF AUTHORIZATION^#1438 Sheet N0.: NDERSON ILLIA�'S�CONSIILTING EP GINEEFfS FJC.- - 117 MAJORCA AVE. GAakES, FL-ORIDP ?3134 TELEPHONE (305) 442-8033 AWCE JOB#: 00-55 - / Sheet^Number :_-3 i of: 3