Loading...
01-0597-010 - SPECIFICATIONS TABLE OF CONTENTS CUTTING AND PATCHING (01045) 6. WOOD GROUNDS, NAILERS, BLOCKING AND FURRING: 1. INSPECT PROJECT CONDITIONS TO DETERMINE SCOPE OF CUTTING AND PATCHING WORK REQUIRED. NOTIFY CONSTRUCTION 8. PERFORM WORK BY PERSONS QUALIFIED TO PRODUCE QUALITY WORK IN COMPLIANCE WITH APPLICABLE PORTIONS OF REFERENCED A. PROVIDE FOR SCREENING AND ANCHORAGE OF OTHER WORK. FORM TO SHAPES SHOWN AND AS REQUIRED. BLOCKING TO DIVISION SECTION TITLE MANAGER IN ADVANCE OF WORK REQUIRING INTERRUPTION OF BUILDING SERVICES OR POTENTIAL DISTURBANCE OF NEIGHBORING PERFORMANCE STANDARDS FOR WORKMANSHIP. PROVIDE ADEQUATE SUPPORT FOR STRUCTURAL LOADS AS REQUIRED BY CODE. TENANTS. 9. SECURE PRODUCTS IN PLACE WITH POSITIVE ANCHORAGE DEVICES DESIGNED TO WITHSTAND STRESSES, VIBRATIONS AND RACKING AND B. COUNTERSINK BOLTS AND NUTS FLUSH WITH SURFACES WHERE NECESSARY FOR FLUSH 0 00700 GENERAL CONDITIONS 2. MATCH EXISTING MATERIALS FOR CUTTING AND PATCHING WORK WITH NEW MATERIALS THAT MEET APPLICABLE REQUIREMENTS TO SUPPORT IMPOSED LOADS. INSTALLATION. 0 00800 SUPPLEMENTARY CONDITIONS OF CONTRACT DOCUMENTS. 10. WHEN WORK IS SPECIFIED TO COMPLY WITH MANUFACTURERS' INSTRUCTIONS, SUBMIT COPIES OF MANUFACTURERS' RECOMMENDATIONS. C. PROVIDE GROUNDS OF DRESSED, KEY-BEVELED LUMBER NOT LESS THAN 1-1/2' WIDE AND OF THICKNESS REQUIRED TO BRING 0 00900 PROJECT ALLOWANCES 3. MAINTAIN FIRE RESISTANCE RATINGS AS NECESSARY.. PERFORM WORK IN ACCORDANCE WITH SPECIFIED MANUFACTURER'S REQUIREMENTS. FACE OF GROUND TO EXACT THICKNESS OF FINISH MATERIAL INVOLVED. REMOVE TEMPORARY GROUNDS WHEN NO LONGER 1 01010 SUMMARY OF WORK TAI REQUIRED. WHERE INDICATED AS PERMANENT GROUNDS, PROVIDE TREATED LUMBER. 1 01030 ALTERNATES 4. CLEAN AREAS AFFECTED BY CUTTING AND PATCHING OPERATIONS. 11. TRANSPORT PRODUCTS BY METHODS TO AVOID PRODUCT DAMAGE. DELIVER IN MANUFACTURERS' UNOPENED CONTAINERS, WITH IDENTIFYING LABELS INTACT AND LEGIBLE 7. FRAMING: COMPLY WITH APPLICABLE RECOMMENDATIONS OF NATIONAL FOREST PRODUCTS ASSOCIATION REFERENCED STANDARD FOR 1 01040 COORDINATION 5. PATCH LEVEL AND SAND OR GRIND EXISTING CONCRETE FLOOR SLAB AS NEEDED TO RECEIVE NEW FINISHES, MAKING AS SMOOTH AND LEVEL AS POSSIBLE. REFINISH AREAS OF WALLS, COLUMNS, SOFFITS AND OTHER AREAS SMOOTH AND FLUSH WITH FABRICATION AND INSTALLATION. 12. PROMPTLY INSPECT SHIPMENTS TO ASSURE THAT PRODUCTS COMPLY WITH REQUIREMENTS, QUANTITIES ARE CORRECT, AND PRODUCTS 1 01045 CUTTING AND PATCHING ADJACENT CONSTRUCTION, READY To RECEIVE FINISH MATERIALS. ARE UNDAMAGED. IF DAMAGED OR IMPROPER PRODUCTS ARE RECEIVED, PROCESS CLAIMS AND REPLACEMENTS AS NEEDED 8. PLYWOOD: COMPLY WITH RECOMMENDATIONS OF AMERICAN PLYWOOD ASSOCIATION (APA) FOR FABRICATION AND INSTALLATION OF 1 01120 PROJECT PROCEDURES 13. STORE PRODUCTS IN ACCORDANCE WITH MANUFACTURERS' INSTRUCTIONS. PLYWOOD WORK. 1 01200 PROJECT MEETINGS 6. ENSURE THAT WORK IS PERFORMED BY WORKERS QUALIFIED FOR EACH CONDITION AND MATERIAL A ATTACH PLYWOOD UNDERLAYMENT FOR FILE CABINETS WITH ADHESIVE IN ACCORDANCE WITH 1 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES REQUIRED, IN CONFORMANCE WITH APPLICABLE SPECIFICATIONS. 14. FOR PERMITTED EXTERIOR STORAGE OF FABRICATED PRODUCTS, PLACE ON SLOPED SUPPORTS ABOVE GROUND. COVER PRODUCTS MANUFACTURER'S INSTRUCTIONS. NAIL PANELS AT 4" FROM EACH CORNER AND AT PANEL CENTER WITH CONCRETE NAILS SUBJECT TO DETERIORATION WITH IMPERVIOUS SHEET COVERING. PROVIDE VENTILATION TO PREVENT CONDENSATION. PENETRATING 1' INTO CONCRETE. IF NECESSARY USE ADDITIONAL NAILING TO KEEP PANELS FLAT, WITH NO ADJACENT PANELS OUT 1 01560 TEMPORARY CONTROLS 7. WHERE NEW OR ALTERED WORK IS ALREADY FINISHED, PATCHING AND REFINISHING SHALL BE DONE BY THE CONTRACTOR AT OF FLATNESS BY MORE THAT 1/327. ALLOW 1/8' SPACE BETWEEN PANEL ENDS AND EDGES AT WALLS FOR EXPANSION. International 1 01600 MATERIALS AND EQUIPMENT HIS EXPENSE 15. PERIODICALLY INSPECT TO ASSURE PRODUCTS ARE UNDAMAGED AND ARE MAINTAINED UNDER REQUIRED CONDITIONS. 1 01630 SUBSTITUTIONS PROJECT PROCEDURES (01120) CABINETWORK AND MILLWORK (06410)1 01700 CONTRACT CLOSEOUT 1. WORK SHALL BE PERFORMED DURING NORMAL HOURS OF OPERATIONS OF BUILDING, AFTER SUBSTITUTIONS (01630) 1. PROVIDE SHOP FABRICATED CABINETWORK AND ARCHITECTURAL WOODWORK ITEMS COMPLETE WITH HARDWARE AND ACCESSORIES, AS Design Partnership 2 02070 SELECTIVE DEMOLITION HOURS, AND ON WEEKENDS AS NECESSARY TO MEET CONSTRUCTION SCHEDULE ESTABUSHED BY 1. DO NOT ORDER OR PROVIDE SUBSTITUTE PRODUCTS WITHOUT PRIOR APPROVAL OF THE ARCHITECT. INDICATED ON ARCHITECTURAL DRAWINGS. 3 03740 BASE BUILDING SLAB PREPARATION THE AGREEMENT BETWEEN OWNER AND CONTRACTOR. COORDINATE WORK AND SCHEDULES 2. ALL CABINETWORK AND ARCHITECTURAL WOODWORK INDICATED ON ARCHITECTURAL DRAWINGS SHALL BE FABRICATED IN ACCORDANCE Incorporated CAREFULLY WITH LANDLORD AND CONSTRUCTION MANAGER TO MINIMIZE DISRUPTION OF 2. SUBMIT SEPARATE REQUESTS FOR EACH PROPOSED SUBSTITUTION. INCLUDE REASON FOR REQUEST. PRODUCT SPECIFICATIONS AND " rn 4 04270 GLASS UNIT MASONRY BUILDING'S AND TENANT'S NORMAL OPERATIONS. PREMIUM TIME WORK, IF REQUIRED, SHALL BE INCLUDED IN SAMPLES AND NAME AND ADDRESS OF SIMILAR PROJECTS ON WHICH PRODUCT HAS BEEN USED. WITH THE STANDARDS OF THE ARCHITECTURAL WOODWORK INSTITUTE (AWL), INCLUDING WOOD SELECTION, JOINERY, SIZING, FASTENINGS, yr 05600 ARCHITECTURAL METALWORK BASE BID CONTRACT AMOUNT. AND SHOP FINISHING AS FOLLOWS: 6 06100 ROUGH CARPENTRY 3. PROVIDE AN ITEMIZED COMPARISON OF SUBSTITUTION WITH PRODUCT SPECIFIED AND LIST VARIATIONS. INCLUDE ACCURATE COST DATA A. "CUSTOM GRADE" FOR PLASTIC LAMINATE OR OPAQUE FINISHED MILLWORK FINISHES AS INDICATED ON THE 2. MAINTAIN ENTRANCES, EXITS, AND CORRIDORS CLEAN AND FREE FROM OBSTRUCTION AT ALL TIMES, TO ENSURE SAFETY AND COMPARISON, WITH NET CHANGE IN THE CONTRACT PRICE. CONTRACTOR TO SUBMIT A MINIMUM OF TWO ALTERNATE CHOICES FOR DRAWINGS. 3O W. Mashta Drive 6 06410 CABINETWORK AND MILLWORK CONVENIENCE OF BUILDING OCCUPANTS. MAINTAIN EXITS, EXIT LIGHTING, FIRE PROTECTION DEVICES AND SYSTEMS, AND ALARMS PRODUCTS WITH LONGER LEAD TIMES WHICH WOULD AFFECT THE CONSTRUCTION SCHEDULE Key Biscayne,ne, a rive 7 07210 BUILDING INSULATION DURING ENTIRE PERIOD OF CONSTRUCTION. 4. SUBSTITUTIONS WILL NOT BE CONSIDERED IF THEY ARE IMPLIED ON A SUBMITTAL WITHOUT A FORMAL REQUEST OF SUCH, OR IF B. 'HIGH PRESSURE LAMINATE AS AN ARCHITECTURAL WOODWORK MATERIAL" REFERENCED FOR PLASTIC LAMINATE MILLWORK. y Y 7 07900 JOINT SEALANTS 3. DURING CONSTRUCTION, OUTSIDE TENANT CORRIDORS AND ELEVATOR LOBBY SHALL BE VACUUMED ON A REGULAR BASIS. SUBSTITUTION REQUIRES ADDITIONAL DESIGN TIME OR REVISIONS TO DOCUMENTS, UNLESS CONTRACTOR WILL PAY FOR ARCHITECTURAL Tel: 305.365.8338/Fax: 305.365.8339 8 08100 STEEL FRAMES de/OR ENGINEERING TIME AND DOCUMENTATION AS REQUIRED. C. 'PREMIUM GRADE' FOR EXPOSED WOOD VENEER MILLWORK. 8 08210 WOOD DOORS PROJECT MEETINGS (01200) 5. THE BURDEN OF PROOF OF MERIT FOR PROPOSED SUBSTITUTIONS IS THE RESPONSIBILITY OF THE CONTRACTOR. 3. ALL WOOD SHALL FIRE-RETARDING TREATED AND SHALL COMPLY WITH REQUIREMENTS OF THE SOUTH FLORIDA BUILDING CODE 8 08385 SAFETY GLASS DOORS 1. BEFORE BEGINNING DEMOLITION, MATERIAL DELIVERY. OR NEW CONSTRUCTION, CONTRACTOR 6. BY PROPOSING A SUBSTITUTION, CONTRACTOR WARRANTS THAT THE PRODUCT HAS BEEN INVESTIGATED AND HAS DETERMINED THAT IT 4. SUBMITTALS: 8 08710 FINISH HARDWARE SHALL MEET WITH LANDLORD TO ENSURE THAT ALL PARTIES ARE FAMILIAR WITH BUILDING REGULATIONS AND MEETS OR EXCEEDS THE QUALITIES AND PROPERTIES, IN ALL RESPECTS, OF THE SPECIFIED PRODUCT, INCLUDING REQUIRED APPROVAL ACCESS UMMATIONS; TO CLARIFY QUESTIONS AND CONFLICTS; TO ESTABLISH METHODS OF COMMUNICATIONS AMONG PARTIES FROM AUTHORITIES HAVING JURISDICTION. A. SUBMIT THE FOLLOWING IN ACCORDANCE WITH DIVISION 1, SECTION 01340. 8 08850 INTERIOR GLAZING INVOLVED; AND TO ESTABLISH SCHEDULE FOR SUBSEQUENT PROJECT MEETINGS. No. Issue Date 9 09250 GYPSUM BOARD SYSTEMS 7. ACCEPTANCE OF SUBSTITUTION IS AT THE SOLE DISCRETION OF ARCHITECT AND TENANT REPRESENTATIVE. B. SUBMIT SHOP DRAWINGS FOR ALL ARCHITECTURAL WOODWORK INCLUDING DIMENSIONED PLANS, ELEVATIONS, CROSS-SECTIONS, 9 09310 CERAMIC TILE 2. AT INITIAL PROJECT MEETING, CONTRACTOR SHALL SUBMIT A LIST OF ALL ITEMS INITIALLY SUBMITTED DURING THE BIDDING AND LARGE-SCALE DETAILS OF CONSTRUCTION TO ARCHITECT FOR REVIEW PRIOR TO FABRICATION. SHOP DRAWINGS SHALL 1. PERMIT/CLIENT REVIEW 03-21-01 PHASEWHICH ARE ANTICIPATED TO REQUIRE MORE THAN FOUR 8. IF ACCEPTED , CONTRACTOR WILL PROVIDE THE SAME WARRANTIES FOR SPECIFIED PRODUCT, COORDINATE INSTALLATION AND MAKE INDCATE MATERIALS AND WOOD SPECIES, COMPONENT PROFILES, FASTENING, JOINTING, FINISHES, HARDWARE AND ACCESSORIES, 9 09330 QUARRY TILE OTHER CHANGES WHICH MAY BE REQUIRED FOR WORK TO BE COMPLETE IN ALL RESPECTS, AND WANES CLAIMS FOR ADDITIONAL COSTS AND ADJACENT WORK OF OTHER TRADES. (4) WEEKS DELIVERY (FROM DATE OF PLACING ORDER) TOGETHER WITH SCHEDULED ORDERING AND DELIVERY TIMETABLE, FOR WHICH MAY SUBSEQUENTLY ARISE. 9 09500 ACOUSTICAL CEILINGS DISCUSSION AND REVIEW. C. SUBMIT THREE (3) SAMPLES OF EACH ARCHITECTURAL WOODWORK FINISH INDICATED ON 9 09600 STONE AND MARBLE FLOORING 9. IF CONTRACTOR MAKES, OR CAUSES TO BE MADE DURING THE BIDDING PHASE OR DURING CONSTRUCTION, DUE TO APPROVAL OF DRAWINGS: PAINT, LACQUER, AND PLASTIC LAMINATE, AND OTHERS, IF ANY, AS INDICATED ON THE DRAWINGS, TO ARCHITECT 3. IF THE CONTRACTOR MAKES, OR CAUSES TO BE MADE DURING THE BIDDING PHASE OR DURING CONSTRUCTION, DUE TO SUBSTITUTE OR OTHERWISE, ANY CHANGE FROM THE DRAWINGS, HE SHALL BE RESPONSIBLE FOR THE COSTS ASSOCIATED WITH SUCH FOR REVIEW AND ACCEPTANCE PRIOR TO FABRICATION. 9 09650 RESILIENT FLOORING AND BASE APPROVAL OF SUBSTITUTE OR OTHERWISE, ANY SUBSTANTIAL CHANGE FROM THE DRAWINGS, HE SHALL PAY ALL COSTS ASSOCIATED CHANGE, INCLUDING ARCHITECTURAL AND ENGINEERING FEES REQUIRED TO CHECK THE ADEQUACY OF SUCH CHANGES WHETHER OR NOT 9 09680 CARPETING WITH SUCH CHANGE, INCLUDING ARCHITECTURAL AND ENGINEERING FEES REQUIRED TO CHECK THE ADEQUACY OF SUCH THESE CHANGES ARE ULTIMATELY ACCEPTED BY THE TENANT. D. SUBMIT CERTIFICATION OF FIRE-RETARDING TREATMENT OF WOOD STATING NAME OF FIRE- RETARDING MATERIALS USED, AND 9 09910 INTERIOR PAINTING CHANGES, WHETHER OR NOT THESE CHANGES ARE ACCEPTED BY THE TENANT. COMPLIANCE WITH AWPA SPECIFICATION C1 AND C20 FOR LUMBER AND 027 FOR PLYWOOD, IF REQUIRED. CERTIFY THAT ONLY CONTRACT CLOSEOUT (01700) FIRE-RETARDING MATERIAL WILL BE USED FOR FINISH SURFACES. 9 09950 WALLCOVERING SUBMITTALS (01340) 5. PROTECT ALL ARCHITECTURAL WOODWORK ITEMS DURING TRANSIT, DELIVERY, STORAGE AND HANDLING TO PREVENT DAMAGE. SOILING 10 10270 ACCESS FLOORING 1. SUBMIT REQUIRED CERTIFICATES AND WARRANTIES TO OWNER UPON COMPLETION OF WORK. AND DETERIORATION. THE WOODWORK CONTRACTOR AND GENERAL CONTRACTOR SHALL BE JOINTLY RESPONSIBLE TO MAKE CERTAIN THAT 10 10522 FIRE EXTINGUISHERS AND CABINETS SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. WOODWORKING IS NOT DELIVERED UNTIL PAINTING, WET WORK AND SIMILAR OPERATIONS WHICH COULD DAMAGE FINISH WORK HAVE BEEN 2. REMOVE AND DISPOSE OF ALL RUBBISH AND WASTE MATERIALS IN CONFORMANCE WITH APPLICABLE CODES, ORDINANCES, REGULATIONS COMPLETED. 10 10650 OPERABLE PANEL PARTITIONS 1. PRIOR TO COMMENCING WORK, PREPARE A MASTER SUBMITTAL LOG SHOWING EACH REQUIRED SUBMITTAL AND SPECIFICATION AND ANTI-POLLUTION LAWS, AND WITH REQUIREMENTS OF BUILDING MANAGEMENT. 10 10800 TOILET ACCESSORIES SECTION NUMBER, THE PROPOSED SCHEDULE AND SEQUENCING OF SUBMITTALS. AND EACH AFFECTED SUBCONTRACTOR. 6. WITH THE CONTRACT DOCUMENTS IN HAND, CONTRACTOR AND WOODWORK SUBCONTRACTOR SHALL EXAMINE THE PROJECT SITE MAINTAIN THE LOG OF SUBMITTALS AS 3. CLEAN SURFACES OF DIRT GRIME AND FOREIGN MATERIALS, USING METHODS AND CLEANING MATERIALS RECOMMENDED BY SUFFICIENTLY IN ADVANCE OF DEMOLITION AND / OR CONSTRUCTION TO ENSURE HIS / HER SATISFACTION AS TO THE CONDITIONS UNDER 11 11132 PROJECTION SCREENS CURRENT AND AN ORDERLY FILE OF ALL APPROVED SUBMITTALS FOR DELIVERY TO OWNER AT TIME OF SUBSTANTIAL MANUFACTURERS. CLEAN WINDOW BLINDS OF DUST AND DIRT. WHICH THE WORK WILL BE PERFORMED. RELEVANT CONDITIONS MAY INCLUDE LOADING / UNLOADING FACILITIES, LOCATION AND SIZE OF 11 11900 APPLIANCES COMPLETION. UPON REVIEW OF MASTER SUBMITTAL LOG, THE ARCHITECT MAY WANE THE REQUIREMENTS FOR CERTAIN SUBMITTALS. 4. REPAIR OR REPLACE MISSING AND DAMAGED MATERIALS AS DIRECTED BY ARCHITECT OR CONSTRUCTION MANAGER. SERVICE ELEVATOR(S). 12 12500 WINDOW TREATMENT 2. SUBMITTALS ARE REQUIRED FOR ALL PRODUCTS AND FINISHES SPECIFIED ON THE PROJECT INCLUDING, BUT NOT LIMITED TO: 7. WOODWORK CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS 13 13000 SPECIAL CONSTRUCTION GLAZING, ACOUSTICAL CEILING, DOORS, FLOORING MATERIALS, PAINT, WALLCOVERINGS, HARDWARE, ACCESS FLOORING, MILLWORK AND 5. MAINTAIN FULL SET OF CONTRACT DOCUMENTS AT PROJECT, ANNOTATED WITH REVISIONS, CHANGE ORDERS AND CLARIFICATIONS AND AND SHALL NOT PROCEED WITH THE PORTION OF WORK IN QUESTION UNTIL THE DISCREPANCIES ARE RESOLVED TO THE ARCHITECT'S 14 14000 CONVEYING SYSTEMS FINISHES ASSOCIATED WITH IT, RESILIENT BASES, WINDOW TREATMENT, FIRE EXTINGUISHERS, APPLIANCES, ETC.. TO THE EXTENT OF SUBMIT COMPLETE SET OF REPRODUCIBLE AS-BUILT DRAWINGS AND SPECIFICATIONS TO OWNER UPON COMPLETION OF WORK. SATISFACTION. 15 15000 MECHANICAL, ELECTRICAL, & PLUMBING ALL SECTIONS INCLUDED IN THESE SPECIFICATIONS. 6. PROVIDE CONTRACTOR WARRANTY, SUBCONTRACTOR WARRANTIES, AND WARRANTIES FOR ALL EQUIPMENT AND PRODUCTS INSTALLED. CLIENT APPROVAL MAKE SUBMITTALS DIRECTLY TO THE ARCHITECT. REVIEW SUBMITTALS AND INDICATE RESULTS OF REVIEW PRIOR 16 16000 FIRE & LIFE SAFETY 3. CONTRACTOR TO BEGIN THESE ON DATE OF SUBSTANTIAL COMPLETION. INDICATE EXPIRATION DATES, ON SUMMARY SHEET, OF ALL WARRANTIES PROVIDED. 8. CABINET HARDWARE AND RELATED ACCESSORIES, WHETHER INDICATED ON DRAWINGS OR NOT, SHALL BE INDICATED ON MILLWORK TO SUBMITTING TO ARCHITECT. SUBMITTAL WHICH DO NOT INCLUDE RESULTS OF CONTRACTOR REVIEW WILL RF gErUgNFn To 7. PROVIDE TAGGED KEYS FOR ALL KEYED DOORS. COORDINATE WITH TENANT AND LANDLORD. DETAILS. I have reviewed these plans and have been CONTRACTOR. UNREVIEWED. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY PROJECT D AY BA ED ON INAPPROPRIATE SUBA• I TAI. given the opportunity to ask questions about DIVISION 0: GENERAL CONDITIONS 8. PROVIDE COPIES OF INSPECTION REPORTS AS REQUIRED BY LOCAL CODE. 9. JUST PRIOR TO OWNER ACCEPTANCE, REMOVE PROTECTIVE COVERING, TOUCH UP AS REQUIRED, WIPE CLEAN, ADJUST AND LUBRICATE GENERAL CONDITIONS (00700) 4. TRANSMIT EACH ITEM UNDER ALA FORM 810 OR SIMILAR DOCUMENT. HARDWARE, CHECK FOR PROPER OPERATION OF ALL ITEMS, AND COORDINATE THIS WITH THE GENERAL CONTRACTOR. them prior to issue. These plans conform 9. COORDINATE WITH ARCHITECT AND ENGINEERS FOR ON-SITE INSPECTIONS AS REQUIRED BY THE JURISDICTION. PROVIDE A MINIMUM OF to our requirements. I understand that any SUPPLEMENTARY CONDITIONS (00800) 5. SUBMITTAL SHALL IDENTIFY PROJECT, CONTRACTOR, SUBCONTRACTOR, AND SUPPLIER. ALLOW SPACE OF A MINIMUM 3" X 4' THREE BUSINESS DAYS NOTICE OF DATES) FOR INSPECTIONS. 10. WOOD SUBSTRATE SHALL BE 3/4 PLYWOOD WITH VENEER APPLIED FINISH. VENEER SHALL BE QUARTERSAWN FOR STILE AND RAIL modifications to these plans will be an ON SHEET FOR REVIEWER'S STAMP. APPLICATIONS, WHILE VENEER FOR PANEL INSETS SHALL BE PLAIN SLICED. TRIM MOLDING SHALL BE APPLIED OVER JOINTS OF VENEER additional service with potential impact on 1. PROJECT REPRESENTATIVES SO THAT MINIMAL JOINTS ARE VISIBLE. construction cost and scheduling. A. OWNER/LANDLORD - ADVANCE TOWER 6. AFTER REVIEW, REVISE AND RESUBMIT IF SO INDICATED. IDENTIFYING CHANGES MADE. ❑ ACCEPTED AS IS 433 PLAZA REAL, SUITE 275 7. MAKE SUBMITTALS AR ENOUGH IN ADVANCE PROVIDE TIME FOR REVIEW, RESUBMITTING IF REQUIRED, AND FOR DIVISION 2: SITEWORK E] ACCEPTED AS NOTED BOCA TO L TO CONTACT. WEISS. 561-416-4600 PLACING ORDERS AND SECURING DELIVERY. SELECTIVE DEMOLITION (02070) DIVISION 7: THERMAL AND MOISTURE PROTECTION B. TENANT. INTERVAL INTERNATIONAL 1. CONTRACTOR SHALL VISIT SITE TO DETERMINE ALL ITEMS REQUIRED TO BE REMOVED IN ORDER TO COMPLETE THE CONSTRUCTION AS BUILDING INSULATION (07210) Signature: Date: CONTACT. GERALD PIERCE, 305-666-1861 8. WHERE ITEMS REQUIRE COLOR SELECTION RELATED TO ONE ANOTHER, SUBMIT ALL ITEMS AFFECTED CONCURRENTLY. INDICATED ON THE DRAWINGS. 1. GENERAL C. CONTRACTOR - CONTRACTOR WHO ENTERS INTO CONTRACT WITH OWNER 9. SAMPLE SUBMITTALS TO BE MADE IN TRIPLICATE, ONE TO BE RETAINED BY ARCHITECT. 2. DEMOLITION, REMOVAL AND/OR DISPOSAL SHALL INCLUDE EXISTING CORRIDOR WALL AT NEW ENTRIES OR D(ITS. RETURN ANY A) WHERE ORIGINAL BUILDING INSULATION IS DISTURBED RESTORE TO ORIGINAL CONDITION. D. ARCHITECT - INTERNATIONAL DESIGN PARTNERSHIP. INC., 10. SHOP DRAWINGS: BUILDING STANDARD ITEMS NOT INCORPORATED INTO THE WORK TO THE TENANT. 30 W. MASHTA DRIVE B) WHERE ORIGINAL BUILDING INSULATION IS DAMAGED REPLACE WITH IDENTICAL MATERIALS. KEY BISCAYNE, FL 33149 A SUBMIT ONE REPRODUCIBLE TRANSPARENCY, REVERSE READ, AND ONE PRINT OF EACH SHEET. 3. CONTRACTOR TO OBTAIN DEMOLITION PERMIT(S) AND / OR CONSTRUCTION PERMIT(S) PRIOR TO COMMENCING WORK. A COPY OF All drawings and written material herein, as instruments CONTACT. BOBETTE ROUSSEAU, 305-365-8338 SUCH DOCUMENTS SHALL BE FURNISHED TO THE BUILDING MANAGEMENT, OWNER, AND ARCHITECT PRIOR TO COMMENCEMENT. C) WHERE ORIGINAL BUILDING INSULATION DOES NOT EXIST IN A REQUIRED LOCATION, INSTALL IDENTICAL MATERIALS AND of service, shall remain the property of International ADP THE CONTRACTOR, UNREVIEWED. LICENSE #:AA 0002386 B. SHEET SIZE SHALL BE A MINIMUM 8 1/2" X 11', UP TO 24" X 36" MAXIMUM. 3. OBTAIN PERMITS, IF REQUIRED, FOR REMOVAL AND DISPOSAL OF DEBRIS. DO NOT MIX RUBBISH WITH THAT OF BUILDING OCCUPANTS. STATE OF FLORIDA RECORD - CHARLES MYERS REGISTRATION � AR 0014546 ILLEGIBLE SHOP DRAWINGS WILL BE RETURNED TO NOTIFY OWNER. Design Partnership, Inc. (IDP) and shall not be reproduced ARCHITECT or copied, in whole or in part, without the expressed 11. PRODUCT DATA: 4. PROVIDE AND MAINTAIN PROTECTION FOR BASE BUILDING CONSTRUCTION AND ALL OTHER TENANT CONSTRUCTION. written consent of IDP and may not be used or E M.E.P. ENGINEERS - ANDERSON WILLIAMS CONSULTING ENGINEERS, INC. JOINT SEALANTS AND CAULKING (07900) referenced for an other project. Information contained 117 MAJORCA AVE.. CORAL GABLES, FL 33134, PH: 305-442-8033 5. INSPECT, TEST AND DISCONNECT UTILITY SERVICES AT MAIN SOURCE OR MAIN BRANCH WITHOUT DISRUPTING UTILITY SERVICES OF BASE 1. GENERAL. y p MECHANICAL ENGINEER OF RECORD: JOHN ANDERSON A. MARK EACH COPT'/CATALOG CUT TO IDENTIFY THE SPECIFIC MODEL, OPTIONS, AND OTHER herein represents proprietary information of International STATE OF FLORIDA REGISTRATION # 0008906 RELATED INFORMATION REQUIRED FOR THE WORK. BUILDING OR OF OTHER BUILDING TENANTS. Design Partnership and/or its Client and shall not be ELECTRICAL ENGINEER OF RECORD: EDUARDO F. AL.CAINE 6. CAP AND IDENTIFY EXPOSED UTILITIES. A) PROVIDE SEALANT AND CAULKING MATERIALS AS INDICATED OR REQUIRED. disclosed to others. Those who use these documents STATE OF FLORIDA REGISTRATION # 0025493 B. WHERE CHOICE OF COLOR IS REQUIRED, PROVIDE ORIGINAL COLOR SAMPLES, NOT PHOTOCOPIES OR OTHER B) PROVIDE ONLY MATERIALS WHICH ARE SUITABLE FOR THE INTENDED APPLICATION. do so in confidence. 2. OMISSIONS REPLICATIONS. 14• SAMPLES: C) COLOR A DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. ANYTHING SHOWN ON DIVISION 3: CONCRETE PROVIDE CAULK OR SEALANT TO MATCH COLOR OF ADJACENT SURFACE Architect of Record: a ONE IS UNDERSTOOD AS BEING IN BOTH AND ANYTHING, ALTHOUGH NOT SHOWN, BUT A. SUBMIT MANUFACTURER'S FULL RANGE OF FINISHES, PATTERN AND COLORS FOR SELECTION BASE BUILDING SLAB PREPARATION (03740) REASONABLY IMPLIED, SHALL BE FURNISHED OR CONSTRUCTED ACCORDINGLY WITHOUT WHERE SPECIFICATION IS INCOMPLETE, OR WHERE SUBSTITUTIONS ARE PROPOSED. " Charles Myers EXTRA CHARGE IF A DISCREPANCY OCCURS BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN THE 1. CONCRETE AND PATCHING AND "SCAR PATCHING MATERIAL SHALL BE APPROPRIATE AND COMPATIBLE WITH INSTALLATION SPECIFICATION OF A CERTAIN PRODUCT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE ARCHITECT B. COORDINATE SUBMISSIONS WITH OTHER INTERFACING WORK. REQUIREMENTS OF DECORATIVE FLOOR FINISHES AND EXISTING CONCRETE SLAB. SEE ALSO "CUTTING AND PATCHING' SECTION 01045. DIVISION 8: DOORS AND WINDOWS :,` •• .`'�� OF THE DISCREPANCY PRIOR TO ORDERING THE PRODUCT OR PRIOR TO CONSTRUCTION, AS APPLICABLE. State of Florida , t C. IDENTIFY EACH SAMPLE CLEARLY, GIVING FULL INFORMATION. 2. PATCH CONCRETE FLOOR SURFACES TO PROVIDE STEEL FRAMES (08100) Registration # 3. DIMENSIONS A. DO NOT SCALE DRAWINGS. PLAN DIMENSIONS SHOWN ARE FROM FACE OF FINISHED WALL A. DEAD LEVEL SURFACE AT FILES, FLOOR STANDING EQUIPMENT, AND DESK CHAIR AREAS. CONCRETE WORK SHALL BE IN 1. GENERAL AR0014546 ACCORDANCE WITH AC1 302 AND AC 1304. TO FACE OF FINISHED WALL UNLESS OTHERWISE INDICATED. D. LIQUID COATED SUBMITTAL SUCH AS PAINT SHALL BE 12 SQUARE, MINIMUM AND 24 SQUARE MAXIMUM. A) PROVIDE NEW H.M. FRAMES IN ALL OPENINGS UNLESS OTHERWISE INDICATED OR t� �S�?-� ,• �f7 B. THE CONTRACTOR AND DRYWALL SUBCONTRACTOR TO LAY OUT ENTIRE PROJECT, CHALK MARK THE LOCATION OF THE E. TEXTILES OR FIAT PRODUCTS SHALL BE MINIMUM 6' SQUARE B. MAXIMUM VARIATION OF 1/8" IN 10'-0" THROUGHOUT DIRECTED. °•,R°+••° WALLS AND CHECK DIMENSIONS. OWNER AND ARCHITECT TO REVIEW WALL LOCATIONS PRIOR TO CONSTRUCTION C. AT FILE ALCOVES, LEVEL SLAB TO ENSURE A MAXIMUM VARIATION OF 1/16' IN 10'-0". /,;,, •� OF PARTITIONS. CONTRACTOR TO PROVIDE 24 BUSINESS HOURS WRITTEN NOTICE WHEN LAYOUT WILL BE COMPLETE F. STONE OR CERAMIC SAMPLES SHALL BE MINIMUM 12" SQUARE. WHERE A PATTERN IS WOOD DOORS (08210) FOR REVIEW, OBTAINING VERBAL CONFIRMATION OF RECEIPT OF SUCH NOTICE. INDICATED, BY UNITS OF 2' SQUARE OR LESS, THE SAMPLE SHALL REPLICATE THE PATTERN AS SPECIFIED. 1. GENERAL C. ON SITE VERIFICATION OF DIMENSIONS AND CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR PRIOR DIVISION 4: MASONRY A) PROVIDE WOOD DOORS AS INDICATED ON DRAWINGS. TO COMMENCING WORK. CONTRACTOR SHALL REPORT ANY DISCREPANCIES OR CONFLICTS TO THE G. PREFABRICATED UNITS SHALL BE SUBMITTED IN QUANTITY OF ONE . GLASS UNIT MASONRY 04270 ( ) B) SUBMITTALS (FOR NON-BUILDING STANDARD DOORS) CONSTRUCTION MANAGER AND ARCHITECT IMMEDIATELY FOR CLARIFICATION OR COORDINATION. H. PROVIDE PAINT SAMPLE BRUSHOUTS ON SITE FOR FINAL APPROVAL PRIOR TO COMMENCING NOT USED PAINTING. TWO DAYS NOTICE OF SCHEDULED BRUSHOUT SHALL BE PROVIDED. 1.) SUBMIT PROPERLY IDENTIFIED PRODUCT DATA AND SPECIFICATIONS INTERVAL D. DETAIL DIMENSIONS TAKE PRECEDENCE OVER PLAN DIMENSIONS. ANY INCONSISTENCIES SHALL BE REPORTED TO THE 2.) SUBMIT SHOP DRAWINGS FOR REVIEW SHOWING DOOR LOCATIONS, THICKNESS, SIZES, TYPE, GRADE, FACE VENEERS, EDGE ARCHITECT PRIOR TO COMMENCING WORK FOR CLARIFICATION. 13. MANUFACTURERS' CERTIFICATES DIVISION 5: METALS BANDING, CORES, OPENINGS, FRAMES, LOUVER OPENINGS, KICKPIATES, UNDERCUTS, FINISHES, BUMPER. INTERNATIONAL 4. PERMITS A PROVIDE COPIES OF CERTIFICATES, WITH ORIGINAL SIGNATURES ON EACH. AND HANDSET LOCATIONS. ARCHITECTURAL METALWORK (05600) (SS-1) 3.) SAMPLES: FOR TRANSPARENT FINISHED DOORS, SUBMIT PROPERLY IDENTIFIED SAMPLES OF SELECTED VENEERS WITH A. CONTRACTOR TO PROVIDE AND PAY FOR ALL PERMITS, SALES TAXES, ETC. REQUIRED FOR THE 14. RESUBMISSION REQUIREMENTS SPECIFIED FINISHES. WORK. TWO SETS OF SIGNED AND SEALED DOCUMENTS WILL BE PROVIDED TO THE CONTRACTOR FOR PERMITING, AS 1. SUBMIT PRODUCT SPECIFICATION(S) AND SHOP DRAWINGS. WELL AS ONE SET OF REPRODUCIBLES FOR CONTRACTOR'S USE IN MAKING ADDITIONAL SET'S AS NEEDED. A. MAKE ANY CORRECTIONS OR CHANGES IN SUBMITTAL REQUIRED BY ARCHITECT-ENGINEER AND RESUBMIT UNTIL ACCEPTED. 2. EXECUTION 2. FASTENERS ARE NOT TO BE EXPOSED. PANELS APPLIED TO WALLS WITH Z CUPS AND WOOD BLACKING AS SHOWN ON DETAILS. A) INSTALL DOORS PLUMB AND LEVEL 5. CODES B. SHOP DRAWINGS AND PRODUCT DATA B) CHECK DOOR OPERATION AND REMEDY ANY BINDING SAGGING OR OTHER IMPROPER OPERATION. 3. METALWORK TO BE US4 STAINLESS STEEL, UNLESS NOTED OTHERWISE. MINIMUM GAUGE FOR PANELS TO BE 26 GA. APPLIED TO 8th Floor A. ALL WORK SHALL COMPLY WITH THE LATEST EDITION, AND ALL AMENDMENTS OF ALL APPLICABLE 1.) REVISE INITIAL DRAWINGS OR DATA, AND RESUBMIT AS SPECIFIED FOR INITIAL SUBMITTAL PLYWOOD SUBSTRATE . C) FINISH DOORS AS SPECIFIED OR INDICATED ON DRAWINGS. NATIONAL, STATE AND LOCAL CODES, AND ALL AUTHORITIES HAVING JURISDICTION INCLUDING, NATIONAL FIRE PROTECTION 4. SIZE AND SHAPE OF METALWORK AS INDICATED ON DRAWINGS. ASSOCIATION (NFPA), NATIONAL ELECTRIC CODE, AMERICANS WITH DISABILITIES ACT (ADA). AND THE LIFE DAFETY CODE. 2.) INDICATE ANY CHANGES WHICH HAVE BEEN MADE OTHER THAN THOSE REQUIRED BY ARCHITECT-ENGINEER. 5. WASH ALL SURFACES CLEAN FOLLOWING INSTALLATION. 6262 Sunset Drive C. SAMPLES: SUBMIT NEW SAMPLES AS REQUIRED FOR INITIAL SUBMITTAL SUPPLEMENTARY CONDITIONS (00800) 6. METAL WORK TO BE PROTECTED FROM DAMAGE BY OTHER TRADES AFTER INSTALLATION BY GENERAL CONTRACTOR. Miami, F133143 NOT USED TEMPORARY CONTROLS (01560) 1. PROVIDE ALL NECESSARY REQUIREMENTS FOR NOISE AND DUST CONTROL DURING THE CONSTRUCTION PERIOD INCLUDING VACUUMING 7. ARCHITECTURAL METALWORK TO BE APPUED TO PLYWOOD SUBSTRATE PROJECT ALLOWANCES (00900) OR CORRDIOR CARPET. NOISE AND DUST CONTROL PROCEDURES SHALL CONFORM TO ALL APPLICABLE OSHA REQUIREMENTS, AND TO BUILDING CODES AND LOCAL ORDINANCES HAVING JURISDICTION OVER THE WORK. Owner: Jeff Weiss NOT USED DIVISION 6: WOOD AND PLASTICS 2. NOTIFY THE LANDLORD PRIOR TO LOUD NOISE AND VIBRATIONS PROJECTING OPERATIONS. COORDINATE WITH LANDLORD'S 433 Plaza Real, Suite 275 ROUGH CARPENTRY (06100) Boca Raton, FL 33432 DIVISION 1 : GENERAL REQUIREMENTS REQUIREMENTS AND SCHEDULE OPERATIONS AS AGREED UPON WITH LANDLORD. AFTER HOURS OR OVERTIME WORK TO MEET 01010 LANDLORD'S REQUIREMENTS SHALL BE INCLUDED IN THE BASE PRICE OF THE WORK. UNLESS OTHERWISE AGREED, NO LOUD WORK INCLUDED: SUMMARY OF WORK ( ) VIBRATING WORK OR SHALL BE UNDERTAKEN BETWEEN 8 AM AND 5 PM. Contact: Jeff Weiss, (561) 416-4600 1. WORK INCLUDES DEMOLITION AND NEW CONSTRUCTION FOR INTERIOR ARCHITECTURAL, MECHANICAL, ELECTRICAL. AND MATERIALS AND EQUIPMENT (01600) 1. WOOD BLOCKING IN WALLS AND ABOVE CEILINGS PLUMBING IMPROVEMENTS TO TENANT SPACE LOCATED ON THE 8TH FLOOR 1. DO NOT REUSE EXISTING MATERIALS EXCEPT THOSE BASE BUILDING MATERIALS SPECIFICALLY INTENDED FOR INTERFACE OR ITEMS 2• PLYWOOD PANEL BOARDS AND SUBSTRATE FLOOR OF A COMMERCIAL OFFICE BUILDING KNOWN AS 6262 SUNSET DRIVE, MIAMI , FL 33143. INTENDED TO BE RE-USED OR SALVAGED. Date: 03-15-01 THE PROJECT SQUARE FOOTAGE IS APPROXIMATELY 589 USEABLE SQUARE FEET. 3. PLYWOOD UNDERLAYMENT FOR FILE CABINETS 2. DO NOT REUSE EXISTING PRODUCTS CONTAINING HAZARDOUS MATERW.S. SPECIFICALLY EXCLUDED MATERIALS AND ACTIVITIES INCLUDE Project No: 2013.20 2. CONTRACTOR'S USE OF PREMISES: THE USE, DETECTION, REMOVAL, CONTAINMENT, OR TREATMENT OF ANY ASBESTOS OR MATERIALS CONTAINING ASBESTOS OR POLLUTANTS, 4. FIRE-RETARDING TREATMENT Drawn By: kt HAZARDOUS WASTES, HAZARDOUS MATERIALS AND CONTAMINANTS. EXECUTION: Drawn By: br CONTRACTOR SHALL: 3. PROVIDE NEW PRODUCTS FREE FROM ASBESTOS AND OTHER DOCUMENTED HAZARDOUS MATERIALS. A LIMIT HIS USE OF THE PREMISES TO PROJECT RELATED WORK AND FOR STORAGE 1. CORRELATE LOCATION OF FURRING. NAILERS, BLOCKING, GROUNDS AND SIMILAR SUPPORTS SO THAT ATTACHED WORK WILL COMPLY CADD File interval\08toilets\cd's\•.dwg 4. WHERE BUILDING STANDARD MATERIALS AND PRODUCTS HAVE BEEN SPECIFIED, CONTRACTOR SHALL OBTAIN THESE ITEMS FROM THE WITH DESIGN REQUIREMENTS AND BE PROPERLY LOCATED. B. ASSUME FULL RESPONSIBILITY FOR THE PROTECTION AND SAFEKEEPING OF PRODUCTS UNDER THIS CONTRACT, STORED ON THE LANDLORD'S STOCK TO THE DEGREE THAT THEY ARE AVAILABLE. 2. CONSTRUCT MEMBERS OF CONTINUOUS PIECES OF LONGEST POSSIBLE LENGTHS. Title: S 5. THE DRAWINGS AND SPECIFICATIONS INTEND FOR THE CONTRACTOR TO PROVIDE EXPERTISE WHERE ACTUAL CONDITIONS CANNOT BE ANTICIPATED BY THE DRAWINGS AND SPECIFICATIONS OR WHERE THE CONTRACTOR CAN MAKE SUBSTANTIAL IMPROVEMENT TO THE WORK 3. FIT CARPENTRY WORK TO OTHER WORK. SCRIBE AND COPE AS REQUIRED FOR ACCURATE FIT. C. MOVE ANY STORED PRODUCTS, UNDER CONTRACTOR'S CONTROL, WHICH INTERFERE WITH OPERATIONS OF THE EXISTING WITHOUT INCREASE OF CONTRACT TIME OR COST. SPECIFICATION S TENANT(S). _ 6. THE DRAWINGS AND SPECIFICATIONS ESTABLISH THE GENERAL DESIGN CONCEPT AND CHARACTERISTICS OF THE WORK, AND ARE MEANT 4. SHIM WITH METAL OR SLATE FOR BEARING ON CONCRETE AND MASONRY SUBSTRATES. ----- TO UTILIZE THE CONTRACTOR'S D(PERIISE AND CHOICE OF FABRICATION PROCESSES AND TECHNIQUES, COORDINATION OF THE TRADES AND 5. SECURELY ATTACH CARPENTRY WORK TO SUBSTRATES BY ANCHORING AND FASTENING AS REQUIRED BY RECOGNIZED STANDARDS. ^ ^ ^ • ALTERNATES (01030) SEPARATE CONTRACTS, CONFIRMING DIMENSIONS AND OTHER ASPECTS OF CONSTRUCTION CONTROL, OR BECAUSE CONCEALED CONDITIONS NOT USED ARE NOT KNOWN TO THE ARCHITECT. A PROVIDE WASHERS UNDER BOLT HEADS AND NUTS IN CONTACT WITH WOOD. - - -" =- 7. ENGINEERING OF THE DESIGN AND ITS DETAIL WITHIN THE ARCHITECT'S GENERAL CONCEPT IS THE RESPONSIBILITY OF THE B. NAIL PLYWOOD TO COMPLY WITH RECOMMENDATIONS OF AMERICAN PLYWOOD ASSOCIATION. scni�:: 1 4° 1.'-0° IF:13.9. COORDINATION 01040 CONTRACTOR. WHEN PRODUCT ENGINEERING DESIGN IS REQUIRED, USE THE SERVICES OF ANY ENGINEER LICENSED TO PRACTICE THE ^ - sheet N0.: ( ) APPLICABLE ENGINEERING DISCIPLINE IN THE STATE OF FLORIDA SEAL ENGINEERING DESIGN DRAWINGS, CALCULATIONS AND SUBMITTAL - 1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT AND FOR DATA AND PROCESS AS SUBMITTAL DATA. WHERE ENGINEERING SEAL ARE NOT REQUIRED, PROVIDE A LETTER OF CERTIFICATION OR BEING AWARE OF ASSOCIATED WORK BY LANDLORD OR ADJACENT TENANTS WHICH MAY AFFECT THE WORK UNDER THIS STATEMENT OF COMPLIANCE SIGNED BY APPLICABLE CONTRACTOR STATING PRODUCTS ARE FABRICATED AND INSTALLED TO MEET OR '_ - 8ol CONTRACT, WHETHER THE ASSOCIATED WORK IS CURRENTLY UNDER WAY OR SCHEDULED FOR FUTURE EXECUTION. EXCEED REQUIREMENTS. - - _ - __ '- - : - - ----- ----