Loading...
00-1144-002 DRY EX"F'ILTRATION SYSTEM IN PAVED AREA RSh;(,c``*.• •c ' a U+rret o�o�t' �T�lJal SA Mtq to"_ of PwD Mawuau( . KQE kfse_r •3tF el>Q+�dL tsr C cea h out covet, 3 It STU& cm pot Pv4 w- 1�•Z5-� ICe••Kauable. Screwrs. M-w A"t f t txrqr ' IS" oa gore. 4 M; Iry it SeFc•ra+jaK V..Sur•IP �MM Red S;3e caroC. (3asw+ 11RE tr/ o+cQ TEE a/2 TEES 7¢r S D • .(� ALTRPMATE 'c 1TrE 7 ( . to U•QOC IZL1tORQ1pt1 d e rr e.�a euu�c tY.oae�tTaR Re ro ouc ble(up cli, 6 lt2f 4WD 6rC9�+ 6° rs on vt 5 tub nt r„ w of eot sto.oEt s�.zb ce n aaaa u 1M ILL d VA.a ear 4rnt awd r erto�4�¢ Q 64W ' fatOC attitl SarewS �� �� I�IBC SC'$3WC• 6►r e�u:M P,Pe artSCR 3 $e�e�t�oN . f�r� •-- —•• �� 0111L•T PETE �Ox VUL rmc p FOR ONE 7EE TYPICAL 'CATCH BASIN ttCOSO M AL =` Q TYPC I FOR 2 TEE'S a � — 11 J-II CATCH BASIN GREASE do ' OIL SEPARATOR DI (PRECEO NG FRENCH©GRAIN . TWO (2) TEES AS - SHOWN IF F.D. AT BOTH SIDES OF STRUCTURE NOTES: 1 — A26VC STRUCTURC TYPC "P' S.D. 2.6 1S RECOMUClHOEo fOR SMJLLL DRAINAGE ARCAS LESS TKAIN 0.20-ACRE PER CATCH .BASIN. 2 rOR ORAINACC ARCAS EOUAL TO OR GREATER THAN 0.20 BUT NOT 'CXCEEOING .3 J=*PWMC TYPE 'J. As PER 5.0: 2:6 'STRUCtMLS. • S . ALL INVERTS •OF PERT ORATEO PIPES TO BE -AT OCTOBER WATER •TABLC. 4 wHCH PRETRCATMENT IS REQUIRED- IN A ORY CXrILTRATION` SYSTC". 11' CRAOE CONDITION' ON SITE Is SUCH THAT THE INVERT or THE Hom PERFOPATEo PIPE Lc^vlttG THE CATCH BASIN IS BCLOw THE OCTOBER CROUND WATER LcvtL-- A TRANSITION IS REOUIRCO FRdu THIS INVCRT ELEVATION TO THE INVERT OF THE PERFORATED PIPE- 5 — ALL OTHCR ALTERNATIVES TO THE ABOVE OIL k GREASE INTERCEPTORS MUST 6C RCVIL1+tC0 ANb'RPPROVCO BY D.E.R.1d. PRIOR TO ISSUANCE OI''A CONSTRUCTION PER&AII