Loading...
01-0412-002 4dO no r - _ 3 � DcN M O co In ^' wwx J � Uoco mI trJr- < CNI MIAM F ORIDA i ® Q LICENSE •: PRINTED NAME: ; AR %o ^ HITECTURAL ARCHITECTURAL SYMBOLS PROJECT TEAM T1.01 COVER SHEET SP1.01 ARCHITECTURAL SITE PLAN DOOR SYMBOL!INDIVIDUALDOOR) ® FINISHLUIZER DENNIS OWEEFE - PROJ. MANAGER 12.01 FIRST FLOOR AND THIRD FLOOR LIFE SAFETY PLAN ® MICHAEL ARRIGO " DOOR SYMBOL!TYPICAL DOOR GROUP) ROUGH LUMBER 12.02 SECOND AND FOURTH FLOOR BED COUNT PLAN OWINDOW SYMBOL. METAL 12.03 EXISTING FIFTH FLOOR PLAN 131.01 PARTIAL THIRD FLOOR DEMOLITION PLAN TOILET ROd1 ACCESSORIES o POURED CONCRETE 131.01 A1.01 PARTIAL THIRD FLOOR PLAN, SCHEDULES AND DETAILS DETAIL BOOK VATION zm NON RIGID INSULATION A3.01 PARTIAL THIRD FLOOR REFLECTED CEILING PLAN 65 AND DETAILS — ° RIGID INSULATION I DETAIL SECTION NUMBER 9-It DETAIL BOCK PAGE NUMBER n GYPSUM BOARD D MECHANICAL DETAIL� PLAN NUMBER g-g DETAIL BOCK PAGE NUMBER —� WALL TYPES A3 C=CATED � O CN FLOOR FLANS M-1 PARTIAL THIRD FLOOR MECHANICAL DEMOLITION PLAN 0-� DETAIL NUMBER LL A-h PLAN SET SWEET NUMBER M-2 PARTIAL THIRD FLOOR MECHANICAL RENOVATION PLAN - EELLEVVAI COMPONENT TION M-3 MECHANICAL EQUIPMENT SCHEDULES AND DETAILS d WlALL SECTION NUMBER -IS FLAN SECTION SHEET NUMBER 2 BUILDING SECTION NId'IBER PLUMBING a PLAN SET SWEET NUMBER OWNER LARKIN COMMUNITY HOSPITAL � P°1 PARTIAL THIRD OUTH�WMIAMI, FL 331143 RD FLOOR PLUMBING DEMOLITION PLAN ARCHITECTURAL ABBREVIATIONS � _ P-2 PARTIAL THIRD FLOOR PLUMBING RENOVATION PLAN ANCHOR BOLT FC FIRE CODED PL PLATE P-3 PLUMBING FIXTURE SCHEDULE AND DETAILS Arza ABOVE IN18W Tl P.E. FIRE EXTMCsU,SHER PR. POLISHED FATE GLASS z AGG. ABOVE FMISHED FLOOR FIN. FINISH PR PAIR AG. ABOVE GROUND FLR FLOOR P.VL. POLYVINYL CHLORIDE PIPE ARCHITECT AL UM AL UI'flNUJN FWD. FOUNDATION R RADIU9 O'K E E F E ARCHITECTS INC. ANGLE . FOUND. FOUNDATION R:CP. REItIFORGED CONCRETE PIPE A.T APARTMENT PT ' REFERENCE U TILE Fo w_s 2424 CURLEW RD. AW, AUTCMAT1c WLaeHER Ga GA RGW ROUGH F I R E P R O T E C T I O N ROA W. BOARROOM PALM HARBOR FLORIDA 34683 GAL GALVINI�D RM. BLIC BLOCK G.C. GENERAL CONTRACTOR R.O. ROUC-04 OPENING PHONE! (7271 781-5885 an BEAM GYP.W. GYPSUM BOARD ROia RIGHT OF WAY BM BENCH MARK H.C. WOLL°W CORE S.G SOLID CORE FAX! 17271 781-0265 FP=l PARTIAL THIRD FLOOR FIRE PROTECTION DEMOLITION PLAN BOt. BOTTOM wm HARDWARE SAD. SCHEDULE - B1JR BUILT UP ROOF WM HOLLOW METAL SECT. SECTION GAEL CABINET H.M.F. HOLLOW METAL FRAME SEW. SERVICE FP-2 PARTIAL THIRD FLOOR FIRE PROTECTION RENOVATION PLAN `EI GEILING HR HOUR S�ML S ECIFI CIVIL N/A - CELL CEILING HTR HEATER SPEC SPECIFICATIONS G!. CAST IRON will. WOT WATER SQ SGUARE 4 CENTER LINE W111 H. HOT WATER HEATER Sh. STAINLESS STEEL z , , C.G. CEILWj IE INVERT ELEVATION STND. STANDARD mO MO. CLOSET IN. INCH STL STEEL ELECTRICAL Cm CONCRETE MASONRY WIT INT. INSULATION SUSP. STRUCTURAL COL COLUMN MT. INTERIOR SUSP. SUSPENDED CONC. CONCRETE JAN. JANITOR SY?lt SYMBOL CCNT. CCNTIWCUS JST. JOIST SYST. SYSTEM a: CONTR. CONTRACTOR JT. JOINT TELE. TELEPHONE CORM CORRIDOR KIT. KITCHEN TEMP. tE`R'ERATUf C.T. CERAMIC TILE LAB. LABORATORY TYP. TYPICAL E1.0 PARTIAL EXISTING RISER DIAGRAM Cu LAM, LAMINATED Urk Way STRUCTURAL N/A GILL COLD WATER LAV. LAVATORY WFINISH. UNFINISHED E2.0 THIRD FLOOR OVERALL PLAN D. DRYER MAX MAXIMUM YE VAPOR BARRJER DIR. DIRECTOR MrG: MECHANICAL CONTRACTOR VEST. VESTIBULE �l R MCH ME NICAL VOL VOLUME E 3.O PARTIAL THIRD F L O O R L I G H T I N G PLAN DOOR A MINIMUM WITH DILL DISHWASHER M.O. MASONRY OPENW3 WG WHEEL CHAIR E4.0 PARTIAL THIRD FLOOR POWER PLAN EA EACH LB. OUND WG WATERCLOSET E.C. ELECTRICAL CONTRACTOR (N) NEW UD. Ilk= ELEC. ELECTRICAL NJG„ NOT IN CONTRACT W.I. Wes. sIHT IRON E5.0 PARTIAL THIRD FLOOR COMMUNICATIONS PLAN EQUIP. ELECT IC NO. NUMBER WUO WITHOUT Ex ELECTRICAL WATER COOLER N.T.B. NOT TO ER SCALE W.P. W HEATHER PROOF MECHi4 N/CA L EX EXISTING O� ON CENTER W.S. WF CII-IT STRIP S T E P ANE K ENGINEERING INC. E6.0 PARTIAL THIRD FLOOR DEMOLITION PLAN EXIST. EXPANSI O.H.P OVERHEAD WT. WIRE IT EXPANS. EXPANSION OFTKz OPENING W.WF. WIRE LLELDED FABRIC �J � EXT. EXTERIOR P.G. PLUMBING CONTRACTOR W1Ufs WELDED WIRE GLASS PLUMBING�1 G 1971 W. LUMSDEN RD. 0317 _ YARD BRANDON, FL 33611 FIRE PROTECTION 18131 657- 9392 SCOPE OF WORKM � I CONVERSION OF THE EXISTING THIRD FLOOR SOUTH WING PATIENT ROOMS TO PSYCHIATRIC ROOMS ELECTRICAL M.P. SPYCHALA ASSOCIATES, INC.TO ACCOMMODATE THE VERFL W OF EXISTING FIF TH FLOOR PSYCHIATRIC FACILITIES. COMMUNICATIONS � 1 305 MEARS BLVD. I� OLDSMAR, FL 34677 ADDITION OF NURSE STATION, CLEAN! UTILITY, SOILED UTILITY, MED. ROOM AND SECLUSION ROOM 18131 855-2721 FOR THE PSYCHIATRIC PATIENTS. BED CUNT 1EXISTING1113BE COUNT IEXISTIN to BED CC N�' Q EWIo FIRST FLOOR 0 BEDS FIRST FLOOR 0 BEDS 90 PATIENT REDS SECOND FLOOR ' 42 BEDS SECOND FLOOR 64 BEDS ® N 22 PSYCHIATRIC PATIENT BEDS THIRD FLOOR 38 BEDS THIRD FLOOR 141 BEDS ° N 112 TOTAL PATIENT BEDS FOURTH FLOOR 10 BEDS FOURTH FLOOR 15 BEDS 2 W 0 FIFTH FLOOR 22 . BEDS IPSYC.) FIFTH FLOOR 22 BEDS 2 W o N BED COUNT [NEWh . ® o 112 BEDS 122 BEDS 0o ® o 12 PATIENT BEDS WILL BE RELOCATED THROUGHOUT THE BUILDING TO MAKE UP FOR 112 PATIENT/PSYCHIATRIC REDS FOR THE 2 DEMOLISHED BEDS AND 10 PSYCHIATRIC BEDS _ °,; 10 NEW PSYCHIATRIC BEDS ,�; oo s HOSPITAL TO LOCATE BEDS IN ROOMS ORIGINALLY DESIGNATED PATIENT BEDS ,-� = T1 0 1 n SI�rE F '` \ I kRKIN C 0 M- MUNI r ir HO. S 1311FAT PARTIAL THIRD FLOOR CONVERSION PAA d ki Ad ki id ki 122 TOTAL PATIENT' BEDS THAT ARE CURRENTLY USED AS OFFICES. -F� .•, SHEET 1 of y RiMA VT _ n