01-0412-002 4dO
no r
-
_
3
� DcN
M O
co
In ^'
wwx
J
� Uoco
mI
trJr-
< CNI
MIAM F ORIDA
i
® Q
LICENSE •:
PRINTED NAME: ;
AR %o
^ HITECTURAL
ARCHITECTURAL SYMBOLS PROJECT TEAM
T1.01 COVER SHEET
SP1.01 ARCHITECTURAL SITE PLAN DOOR SYMBOL!INDIVIDUALDOOR) ® FINISHLUIZER DENNIS OWEEFE - PROJ. MANAGER
12.01 FIRST FLOOR AND THIRD FLOOR LIFE SAFETY PLAN ® MICHAEL ARRIGO "
DOOR SYMBOL!TYPICAL DOOR GROUP) ROUGH LUMBER
12.02 SECOND AND FOURTH FLOOR BED COUNT PLAN
OWINDOW SYMBOL. METAL
12.03 EXISTING FIFTH FLOOR PLAN
131.01 PARTIAL THIRD FLOOR DEMOLITION PLAN TOILET ROd1 ACCESSORIES o POURED CONCRETE 131.01
A1.01 PARTIAL THIRD FLOOR PLAN, SCHEDULES AND DETAILS DETAIL BOOK VATION zm NON RIGID INSULATION
A3.01 PARTIAL THIRD FLOOR REFLECTED CEILING PLAN 65
AND DETAILS — ° RIGID INSULATION
I DETAIL SECTION NUMBER
9-It DETAIL BOCK PAGE NUMBER
n
GYPSUM BOARD
D
MECHANICAL DETAIL� PLAN NUMBER
g-g DETAIL BOCK PAGE NUMBER
—� WALL TYPES A3 C=CATED � O
CN FLOOR FLANS
M-1 PARTIAL THIRD FLOOR MECHANICAL DEMOLITION PLAN 0-� DETAIL NUMBER LL
A-h PLAN SET SWEET NUMBER
M-2 PARTIAL THIRD FLOOR MECHANICAL RENOVATION PLAN - EELLEVVAI COMPONENT
TION
M-3 MECHANICAL EQUIPMENT SCHEDULES AND DETAILS d
WlALL SECTION NUMBER
-IS FLAN SECTION SHEET NUMBER
2 BUILDING SECTION NId'IBER
PLUMBING a PLAN SET SWEET NUMBER
OWNER LARKIN COMMUNITY HOSPITAL �
P°1 PARTIAL THIRD
OUTH�WMIAMI, FL 331143
RD FLOOR PLUMBING DEMOLITION PLAN ARCHITECTURAL ABBREVIATIONS � _
P-2 PARTIAL THIRD FLOOR PLUMBING RENOVATION PLAN ANCHOR BOLT FC FIRE CODED PL PLATE
P-3 PLUMBING FIXTURE SCHEDULE AND DETAILS Arza ABOVE IN18W Tl P.E. FIRE EXTMCsU,SHER PR. POLISHED FATE GLASS z
AGG. ABOVE FMISHED FLOOR FIN. FINISH PR PAIR
AG. ABOVE GROUND FLR FLOOR P.VL. POLYVINYL CHLORIDE PIPE
ARCHITECT AL
UM AL UI'flNUJN FWD. FOUNDATION R RADIU9 O'K E E F E ARCHITECTS INC.
ANGLE . FOUND. FOUNDATION R:CP. REItIFORGED CONCRETE PIPE
A.T APARTMENT PT ' REFERENCE
U TILE Fo w_s 2424 CURLEW RD.
AW, AUTCMAT1c WLaeHER Ga GA RGW ROUGH F I R E P R O T E C T I O N
ROA
W. BOARROOM PALM HARBOR FLORIDA 34683
GAL GALVINI�D RM.
BLIC BLOCK G.C. GENERAL CONTRACTOR R.O. ROUC-04 OPENING PHONE! (7271 781-5885
an BEAM GYP.W. GYPSUM BOARD ROia RIGHT OF WAY
BM BENCH MARK H.C. WOLL°W CORE S.G SOLID CORE FAX! 17271 781-0265
FP=l PARTIAL THIRD FLOOR FIRE PROTECTION DEMOLITION PLAN BOt. BOTTOM wm HARDWARE SAD. SCHEDULE
- B1JR BUILT UP ROOF WM HOLLOW METAL SECT. SECTION
GAEL CABINET H.M.F. HOLLOW METAL FRAME SEW. SERVICE
FP-2 PARTIAL THIRD FLOOR FIRE PROTECTION RENOVATION PLAN `EI GEILING HR HOUR S�ML S ECIFI CIVIL N/A
- CELL CEILING HTR HEATER SPEC SPECIFICATIONS
G!. CAST IRON will. WOT WATER SQ SGUARE
4 CENTER LINE W111 H. HOT WATER HEATER Sh. STAINLESS STEEL z , ,
C.G. CEILWj IE INVERT ELEVATION STND. STANDARD mO
MO. CLOSET IN. INCH STL STEEL
ELECTRICAL Cm CONCRETE MASONRY WIT INT. INSULATION SUSP. STRUCTURAL
COL COLUMN MT. INTERIOR SUSP. SUSPENDED
CONC. CONCRETE JAN. JANITOR SY?lt SYMBOL
CCNT. CCNTIWCUS JST. JOIST SYST. SYSTEM a:
CONTR. CONTRACTOR JT. JOINT TELE. TELEPHONE
CORM CORRIDOR KIT. KITCHEN TEMP. tE`R'ERATUf
C.T. CERAMIC TILE LAB. LABORATORY TYP. TYPICAL
E1.0 PARTIAL EXISTING RISER DIAGRAM Cu LAM, LAMINATED Urk Way STRUCTURAL N/A
GILL COLD WATER LAV. LAVATORY WFINISH. UNFINISHED
E2.0 THIRD FLOOR OVERALL PLAN D. DRYER MAX MAXIMUM YE VAPOR BARRJER
DIR. DIRECTOR MrG: MECHANICAL CONTRACTOR VEST. VESTIBULE �l
R MCH ME NICAL VOL VOLUME
E 3.O PARTIAL THIRD F L O O R L I G H T I N G PLAN DOOR A MINIMUM WITH
DILL DISHWASHER M.O. MASONRY OPENW3 WG WHEEL CHAIR
E4.0 PARTIAL THIRD FLOOR POWER PLAN EA EACH LB. OUND WG WATERCLOSET
E.C. ELECTRICAL CONTRACTOR (N) NEW UD. Ilk=
ELEC. ELECTRICAL NJG„ NOT IN CONTRACT W.I. Wes. sIHT IRON
E5.0 PARTIAL THIRD FLOOR COMMUNICATIONS PLAN EQUIP. ELECT IC NO. NUMBER WUO WITHOUT
Ex ELECTRICAL WATER COOLER N.T.B. NOT TO ER SCALE W.P. W HEATHER PROOF MECHi4 N/CA L
EX EXISTING O� ON CENTER W.S. WF CII-IT STRIP S T E P ANE K ENGINEERING INC.
E6.0 PARTIAL THIRD FLOOR DEMOLITION PLAN
EXIST. EXPANSI O.H.P OVERHEAD WT. WIRE IT
EXPANS. EXPANSION OFTKz OPENING W.WF. WIRE LLELDED FABRIC �J �
EXT. EXTERIOR P.G. PLUMBING CONTRACTOR W1Ufs WELDED WIRE GLASS
PLUMBING�1 G 1971 W. LUMSDEN RD. 0317
_ YARD
BRANDON, FL 33611
FIRE PROTECTION
18131 657-
9392
SCOPE OF WORKM
� I
CONVERSION OF THE EXISTING THIRD FLOOR SOUTH WING PATIENT ROOMS TO PSYCHIATRIC ROOMS ELECTRICAL M.P. SPYCHALA ASSOCIATES, INC.TO ACCOMMODATE THE VERFL W OF EXISTING FIF TH FLOOR PSYCHIATRIC FACILITIES. COMMUNICATIONS �
1
305 MEARS BLVD. I�
OLDSMAR, FL 34677
ADDITION OF NURSE STATION, CLEAN! UTILITY, SOILED UTILITY, MED. ROOM AND SECLUSION ROOM 18131 855-2721
FOR THE PSYCHIATRIC PATIENTS.
BED CUNT 1EXISTING1113BE COUNT IEXISTIN to BED CC N�' Q EWIo
FIRST FLOOR 0 BEDS FIRST FLOOR 0 BEDS
90 PATIENT REDS
SECOND FLOOR ' 42 BEDS SECOND FLOOR 64 BEDS ® N
22 PSYCHIATRIC PATIENT BEDS THIRD FLOOR 38 BEDS
THIRD FLOOR 141 BEDS ° N
112 TOTAL PATIENT BEDS FOURTH FLOOR 10 BEDS FOURTH FLOOR 15 BEDS 2 W 0
FIFTH FLOOR 22 . BEDS IPSYC.) FIFTH FLOOR 22 BEDS 2 W o N
BED COUNT [NEWh . ® o
112 BEDS 122 BEDS
0o ® o
12 PATIENT BEDS WILL BE RELOCATED THROUGHOUT THE BUILDING TO MAKE UP FOR
112 PATIENT/PSYCHIATRIC REDS
FOR THE 2 DEMOLISHED BEDS AND 10 PSYCHIATRIC BEDS _ °,;
10 NEW PSYCHIATRIC BEDS ,�; oo s
HOSPITAL TO LOCATE BEDS IN ROOMS ORIGINALLY DESIGNATED PATIENT BEDS ,-� = T1 0 1
n SI�rE F '` \
I kRKIN C 0 M- MUNI r ir
HO. S 1311FAT
PARTIAL THIRD FLOOR CONVERSION
PAA d ki Ad ki id ki
122 TOTAL PATIENT' BEDS THAT ARE CURRENTLY USED AS OFFICES. -F� .•, SHEET 1 of y
RiMA VT
_
n