Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
01-0071-030
-- - - - - --- ----- I I LEGEND �'i R I I !� II I' II II Q JUNCTION BOX. -------------_=___ ! ------------------ ------ OCH J. BOX. W/ SPECIAL SUPPORT j -- ———- - - -——-- --- —————-- --- - ------ - ————— ——----- --——--- —----- - I FOR CHANDELLIER I. — ELEVATOR CALCULATIONS it 8- DEDICATED RECEPTACLE II DUPLEX RECEPTACLE ® 12" AFF, U.O.N. MARICE CHAEL, A.I.A. AR0014885 QUAD RECEPTACLE rD 12" AFF, U.O.N. GUTTER II ! THOMAS T. COOPER, A.I.A. AR4486 GFI DUPLEX RECEPTACLE 208V RECEPTACLE, 10 Brkr#1 DATA & PHONE OUTLET. PROVIDE 1/2"C STUBBED ABOVE CEILING. PHONE OUTLET. PROVIDE MUD RING AND 1/2"C STUBBED ABOVE CEILING. Elev1 -- -------- ------- ------- ------ --------- -- -- ----- --- Q I LIGHTING SWITCH ® 48" AFF. 30 HP --------- ------------------- $3 3-WAY LIGHTING SWITCH @ 48" AFF. Feeder Brkr 88a j l QD LIGHTING SWITCH W/DIMMER @ 48" AFF. j 208v/3� � I Mm"I ELECTRIC PANEL I j DISCONNECT SWITCH 1.- FINAL BRANCH SUB-FEEDER FOR ELEVATOR 1 F.A.P. FIRE ALARM PANEL ! From table 430-22(b)for continous rated motor on Passenger Elevator: I u, R.A. REMOTE ANUNCIATOR Elevator Ampacity=(F.L.)x 140% =88 x 1.4= 123 amps Controller Ampacity: 5 amps x 1.25%continous=6 amps ! I; rVj s DOWNLIGHTING Total load = 123+6= 129 amps WALL MOUNTED FIXTURE Select: 3-# 1 THHN(A�,B�,C�)+ 1 #6 THHN(gnd) in 1-1/2" C. 0 FLUORESCENT FIXTURE ! I' I O li -ice 2.- FINAL BRANCH BREAKER# 1 IN ELEVATOR MACHINERY ROOM FOR ELEVATOR#1 �a g EMERGENCY LIGHT LI� From table 430-152 for continous rated motor on Passenger Elevator TIME DELAY BREAKER Maximum Rating =(F.L)x 250% = 88 x 2.5=220 amps ! --- -- -- 4 ----- f® EXIT SIGN Contoller amps: 5 amps x 1.25% continous=6 amps Total amps: 220+ 6=226 amps CEILING FAN & LIGHT As per 430-52 (c)(1)(c), select 250 amp breaker. Model FXD63B250 W/Shunt trip e `� ' 3.- UNDEMANDED SUB-FEEDER CALCULATION TO FOR 1 ELEVATORS TO MACHINERY RM ` d I I I I � �; r jT Lil e� From table 430-24 Exception 1 for the feeder ampacity for one motor. According to 430-24 Exception 1 the"amprere rating"for each elevator shall be calculated < 0 as follows: FL x 1.4 z Undemanded Ampacity=FL(larger elevator)X 1.4)+E(ampere rating of other elevators x 1.4) -- ---- _~ i °,� w U ndemanded Ampacity=(88 x 1.4)= 123 amps -------- --- �w. s 4.- FEEDER DEMAND FACTOR-PER TABLE 620-14 One elevator= 1 demand factor 123 amp x 1 = 123 amp Controller Elevator= 5 amp `I; U ELECTRICAL SPECFICATION8 PNL EP (Elevator Lts.)= 17 amp PART 1- GENERAL Total Load= 145 amp A.- Overall Installation: The installation shall comply with the National Select: 4-# 1/0 THHN (A�,B�,C�,N)+ 1 #6 THHN(gnd)in 1-1/2" C. 826,28,30 820,22,24 H3 Electrical Code (NEC), the South Florida Building Code (SFBC), and WP any other applicable Federal, State and Local codes. (3�}� 14 i \ I u4 B.- Conductor Calculations: Conductor calculations are based on 75 'C. / 821,23,25 CU #2A j I° 1. General: The General and Special Conditions and Requirements of 5•- FEEDER VOLTAGE DROP CALCULATION Cu #3 C5,7 EXHAUST SUPPLY the Contract and Specifications as well as plans and specifications Verifying the voltage drop at: Elevator room: distance L= 60 FAN FAN U ` of other disciplines and trades shall be a part of the work hereby o it A) Full load max voltage drop = 3 /o specified. These specifications and accompanying plans are intended u H3 B) Max acceleration drop as per manufacturer= 10/o ❑ to provide for the complete furnishing and installation of the elec- � trical systems. To provide means to furnish and install. Resistance Table# 8 Chapter 9. CU 2B !I ----- i WP B27,29,31 # l 2. Compliance: Workmanship, materials and installation shall be in strict CU #1 A26,28 VDFL = 1.73 x L x R x I = 1.73 x 60 x 0.0766 x 145 = 1.15 v I; _ ___ _____ __ accordance with the applicable edition of the NEC,NFPA,NEMA,ASTM, I 1 OSHA, HRS health agencies, and other applicable national, state, and 1000 1000 ;I l i local codes and pertaining regulations established by the ruling VDFL% = 1.15v-208v— 0.6 % j 12 it j authority having jurisdiction. l Contractors shall also meet the requirements of other standards II I where such requirements are more strict than those standards ! I I cited above. i l 3. Workmanship: All work shall be performed by contractors licensed l in their respective discipline. Work shall be done in a first class �I manner, fully operative, and to the acceptance of the Architect and the Engineers. Contractor shall provide for all necessary labor and II material required for the completion of the work including but not l limited to related work such as connection of existing systems, exca- vations and back filling. 4. Materials: Contractor shall provide all new materials of American ma- it nufacture, bearing the Underwriter's Laboratory (UL) label as appli- < cable. Materials shall be new, suitable for the application and above I _ standard quality normally used for the purpose as called for on plans. Supplemental materials, products and components necessary to comply with the intent of the Contract drawings and/or specifications, but not noted or specified on these sections, shall be provided by the ------------------------------------------------------------------------------------------------------------- �� Contractor arequired f completion s nov ' nalcosttotheOw er. Contractor be responsible for provisions and coordination of delive of materials. --- — — — --- ---- —I' I ( rl Equipment marred during shipment or installation shall be touched up N and refinished to factory finish, replaced where not acceptable. I ry o Q 5.- Permits and Insurance: Contractor shall secure and a for all — ! �` i _� "^� �� 1 i �. f . I J ( t permits, fees, taxes, inspections, tests, fines and other items as 1—= �—r ! I\� '' '= `= _ t =� ` - ° w required for the installation of the complete electrical systems as �� W outlined herein and shown on plans. Contractor shall provide all required insurance for protection against _.ca le: —i-0 < r public liability and property damage for the duration of the work. 6.- Existing conditions: Before bidding, the contractor shall visit the job �/ W site and ascertain all existing conditions which will affect his work, Failure to do so will not be accepted as a reason for requesting W extra pay where the existing conditions result in extra materials or Any existing conditions found by the Contractor which will adversely affect the work shall be immediately be brought to the attention of the Architect/Engineer. Correction of any defects shall be completely PNL ELECT, without additional charge and shall include replacements or repair of EP GUTTER _ c� any other phase of the installation which may have been damaged thereby. --- :-� ------- ;i U,� 7.- Plans: Drawings r basically diagrams ELEVATOR BREAKER] MAIN 2 OF 4 •i — -- -- •I a s, D a gs a e bas co Iy d ag ams intended to depict approximately 250A, SEE 1© IN EP 1 '•I equipment locations and arrangements, not to show every minor detail. SEE ELCT. RISER �- Plans shall not be scaled to determine exact location and dimensions. SHEET E-5 ! EP2 EP2 I 8.- Interference: The Contractor shall coordinate his work with other ELEVATOR WP trades so that interference with existing conditions, conduits, piping, CONTROLLER equipment, architectural and structural members be avoided. --_7 EP4 r� EP2 YJ 9.- Substitutions: Products and materials called out by trade name and/or ! j = ; EP5 catalog numbers establish a standard of quality, appearance, perfor- T_�� 1 ----- mance and dimension. Contractors shall base his proposal on those --- EP2 items as they shall be considered as a standard basis of bidding. !----_— ----I WP —_— I Requests for substitution shall be submitted in writing to the Archi- I,-'- � L- --._------._.-- .—._.-- -J I tect/Engineer, demonstrating that product is of comparable and basic -- design, construction, standards and warranties, dimensions to fit wi- thout change, and does not cause extra work to other trades. j Contractor shall be responsible for providing equality of substitution: —-- — —-- — — — ------------- Architect/Engineer will, under no circumstances, be required to prove such item is or is not of equal quality to the specified item. Archi- i D_ A_T_E__ 10_/03/00—_—_- tect/Engineer expenses incurred due to Contractor's requested revi- sions or substitutions shall be aid b the Contractor. ; 001032 L LE 10.-Record Drawings: Maintain a complete set of prints for indicating all changes. Use colored pens to mark changes at the time of exe- D W N B Y:AW,Ics cution and delver the set to the Architect/Engineer upon completion. - -------- Contractor shall stamp "As Built" on prints and plans, date and sign C H K BY: ------- i n ink, _ ----- <J''dl'�' li-� I /gin •�•�� . ,,,,,,, ;����,`d� 0. ',to. •�'�," REVISION__ TOMAS C. ARMSTRONG, A tI y AV ENGINEERING CONSULTANTS.- J51Q 7. Fi J 5600 S.W. 135th Ave., S-2A, Wza 1B •I 4 of 5 Ts(X3)396-7132 Fe,(JOS)333-71 ., TONAS C. ARAI E.E. PE-f 4 a �tQ/0�200 Sheet 1 ,. Rfp �fN ,•� n,.J