Loading...
01-0340-008 " -- " ' . ' ' ' rF MR. NAT KLEINMAN < FOOTING SCHEDULE F40 F40 G-70 I : -% 2 ac, MARK BOTTOM TOP SIZE REMARKS 0 SHORT BAR LONG BAR SHORT BAR LONG BAR 'cr-01 L - - -- - --- -- - TE 8" CONT. X 12" 1 #5 SLAB THICKENED EDGE L —_j L J CONT_ SIF SLAB ALTERNATE IS CHOSEN) (3 6' MN. REINFORCED CONCRETE- ROOF SLAB z) CONC. MAM R13-1 (TYPICAL) =3 ROOF DRAIN WITH PVC ',�ROOP DRAW WITH PVC RAINWATER LEADER co tp 0 RAINWATER LEADER /"'�c INSVe COLUMN BOX-OUT INSIDE COLUMN BOX-OUT VS-2 (see AL (SEE MTAL SHEET A-6) P40 F-40 I Lipq"_onEwuLE ......................... T-, EMERGENCY OVERFLOW P,[3-1 SCUPPER L I (SEE DETAIL SHEET A-6) Lo CONC. COLUMINIS go REINFORCEMENT (BELOW) x MARK SIZE VERTICAL OR TIES OR REMARKS BASE PLATE CAP PLATE 0-z SLOPE Z co 0 TO DRAINS cn (TYPICAL) ILL REPAIR EXISTING ASPHALT PAVING %u U at ON 6 M. VISQUEEN VAPOR BARRIER IN WELL xe-07 COMPACTED FILL W/180- HOOK PROVIDE SAW CUT JOINTS AT E-AC14 COLUMN LINe (TYPICAL) V) (BOTH DIRECTIONS) AND INTERMEDIATE e0UAL SPACED SLIP-RESISTANT FINISH SLOPE TO DRAIN TOWARDS DRIVEWAY to to 0 QOOF PLAN NOTES (USE: THICKENED EDGE 'TE- ALONG t-: tu I" EXPANSION JOINT PEIZIMETER (SEE LEGEND) I- EXPANSION JOINT\ QD to Lu co eb c -7) F-40 F-40 FOUNDATION PLAN NOTES r i r- -I CONCRETE CONCRETE COLUMNS NEW PARKING COL~ SOILS STATEMENT CANOPY ROOF (TO MATCH EX15TING) SOIL AT THIS SITE IS SAND & ROCK, ADEQUATE TO SUPPORT THE DESIGN LOAD OF 2,000 PSF vo AFTER EXCAVATION. A SIGEDN & SEALED LETTER WILL BE SUBMITTED BY EXISTING THE ARCHITECT OR ENGINEER ATTESTING THAT THE SITE HAS BEEN OBSERVED CONC. CURB U-N AND THE FOUNDATION CONDITIONS ARE SIMILAR TO THOSE UPON WHICH co THE DESIGN IS BASED ON- F40 F-40 I D 1. TOP OF FOOTINGS SHALL Be FLUSH AT THE JUNCTION OF A WALL FOOTING J4 0 12" T. z 44 AND COLUMN FOOTWC, WALL FOOTING RersFORCEMENT TO RUN CONTINUOUS X47-O'* TEMP. (TYPICAL—) 0 THROUGH COLUMN FOOTINGS. ALL SIDES OF FOOTINGS TO Be FORMED- W/1 80 HOOK E- > 2- TOP OF ALL FOOTINGS @ r-4" BELOW FINISHED GRADE. 3. PLACE- ALL CONCRETE SLABS OVER 6 ML. VAPOR BARRIER. OVER TER11TE TREATED 6 CLEAN & WELL COMPACTED FLL_ -1 0 P113-1 z PIMS. TO ca 0 ROOF OVERHANG 51-01 :100-0 CD z qh=40 le- IWO 48 HOURS (y BEFORE DIGGING 0 oftt QOOF PLAN CALL SUNSHINE FOUNDATION PLANAF Nes, PA " �'`"^"^' � ` ' .