Loading...
01-0102-010 NUM DATE REMARKS GENERAL NOTES 18. CLEAN UP: FINISH HARDWARE NOTES: ELECTRICAL NOTES: THE CONTRACTOR SHALL BE RESPONStBLE -FOR THE REMOVAL OF ALL TRASH AND DEBRIS 1 e-29-01 13M. DEr. 114MIREl EM 1. EXAMINATION OF THE CONTRACT DOCUMENTS AND SITE: FROM THE JOB SITE. J-" _ =-- 1. INSTALLATION: 1• GENERAL EACH CONTRACTOR FOR THIS PROJECT SHALL STUDY AND FAMILIARIZE HIMSELF WITH THE 19. GUARANTEE: DO NOT SCALE ELECTRICAL DRAWINGS. REFER TO THE ARCHITECTURAL PLANS AND ELEVATIONS SITE AND WITH ALL OF THE DRAWINGS FOR ALL TRADES AND PARTS OF THE WORK. SHOULD __ THE CONTRACTOR SHALL RECEIVE, STORE, BE RESPONSIBLE FOR AND INSTALL ALL SPECIFIED FOR THE EXACT LOCATION OF ALL EQUIPMENT AND CONFIRM WITH THE OWNER'S REPRESENTATIVE. ANY CONTRACTOR HAVE THE OPINION THAT THERE EXIST IN THE ARCHITECTURAL DRAWINGS THE CONTRACTOR SHALL BE REar�iMSIBIE _ FOR :THE SA'1SFA^TORY OPERATION OF ALL HARDWARE. HARDWARE SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S ANY ERRORS OR DISCREPANCIES OR THAT CONDITIONS OF THE WORK OF ANY OTHER INSTRUCTIONS, ACCURATELY FATED, SECURELY APPLIED AND PROPERLY ADJUSTED. LOST, IT IS NOT THE INTENT OF THESE PLANS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. THE CONTRACTOR IS SUCH THAT WILL PREVENT HIM FROM COMPLETING HIS WORK IN A COMPETENT CORRELATED PARTS OF THE BUILDING, FOR A_ PERI09. OF CNE-YEAR AFTER THE DATE OF STOLEN OR DAMAGED HARDWARE MUST BE REPLACED. HARDWARE SHALL BE INSTALLED SO CONTRACTOR IS EXPECTED TO FURNISH AND INSTALL ALL ITEMS NECESSARY FOR EQUIPMENT TO MANNER, HE SHALL NOTIFY THE OWNER OF SUCH BEFORE PROCEEDING WITH THE WORK. ACCEPTANCE OF THE OWNER, AND- SHALL MAKE ALTERATIONS, REPAIRS, OR ADJUSTMENTS, AS TO AVOID DAMAGE TO EXISTING WORK. ALL FINISHES SHALL BE PROTECTED DURING AND NECESSARY CORRECT PROBLEMS CAUSED BY THE USE OF FAULTY MATERIALS OR AFTER INSTALLATION. TO BE PLACED IN PROPER WORKING ORDER. FURNISH AND INSTALL ALL FIXTURES AS CALLED FOR ON THE CONTRACTOR SHALL HAVE AT THE BUILDING SITE, FROM START TO FINISH OF CONSTRUCTION WORKMANSHIP P BY HIM OR ANY OF HIS SUB-CONTRACTORS. THE PLANS OR AS SELECTED BY OTHERS. A RESPONSIBLE FOREMAN. IN ADDITION, THE CONTRACTOR SHALL GIVE HIS PERSONAL SUPER- 2. PROTECTION: VISION TO THE WORK. THE FOREMAN SHALL BE ON DUTY DURING ALL WORK HOURS. ANY SITE NOTES: LOAD DATA IS BASED ON INFORMATION GIVEN TO THE ENGINEER AT THE TIME OF THE DESIGN. ALL ' INSTRUCTIONS OR NOTICES GIVEN TO HIM SHALL HAVE THE SAME IMPORTANCE AS IF GIVEN ALL ITEMS OF HARDWARE SHALL BE INDIVIDUALLY WRAPPED WITH PROTECTIVE PAPER AND EQUIPMENT AND PANEL SIZES SHALL BE VERIFIED PRIOR TO ORDERING. TO THE CONTRACTOR IN PERSON. STORED BY THE GENERAL CONTRACTOR ON THE JOB UNTIL THE TIME OF INSTALLATION. AFTER 1. VERIFY EXISTING CONDITIONS: LLATION, CHECH ADJUST OR REPLACE DEFECTIVE HARDWARE. PROTECT ALL CIRCUITS SHOWN ON THE PLANS ARE TO DETERMINE THE LOAD DATA AND PANEL SIZE. THE CONTRACTOR FINAL INSTALLATION. ' THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TEMPORARY FINISHES A REQUIRED. SHALL PROVIDE CIRCUIT ROUTING TO SUITE THE JOB CONDITIONS. FI PROVISIONS SUCH AS TOILETS, WATER SUPPLY, LIGHT AND POWER AS WELL AS ANY OTHER THE CONTRACTOR PRIOR TO COMMENCEMENT OF WORK SHALL VISIT THE SITE AND VERIFY FI PAINTING IS TO BE DONE AFTER INSTALLATION OF HARDWARE, REMOVE AND REINSTALL DEEMED NECESSARY FOR THE COMPLETING OF THE BUILDING. THE LOCATION OF ALL UTILITIES AND DETERMINE THEIR CAPACITIES. HARDWARE WHEN THE SURFACES ARE COMPLETELY DRY. 2' CODES Copywrlte 2001 Gene Farmer and Associates ANY ITEM OF WORK NECESSARY TO THE PROPER COMPLETION OF CONSTRUCTION WHICH IS PROTECT AND MAINTAIN CONDUITS, DRAINS, PIPES, SEWERS, AND WIRES WHICH ARE TO 3. KEYS All drawings and ideas shown on this drawing NOT SPECIFICALLY COVERED IN THESES DOCUMENTS SHALL BE PERFORMED IN A MATTER REMAIN ON PROPERTY OR WHICH WILL REMAIN UNTIL NEW INSTALLATIONS ARE COMPLETE. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE N.E.C. AND SHALL COMPLY WITH ALL LOCAL are the property of Gene Farmer. They may DEEMED GOOD PRACTICE IN THE TRADE INVOLVED. PROVIDE 2 MASTER KEYS FOR EACH LOCKSET. THE TWO MASTER KEYS ARE TO BE GIVEN RULES AND ORDINANCES. not be used in whole or in part without the COORDINATE ALL TIE IN AND SERVICE TO UTILITIES WITH THE UTILITY COMPANIES. TO THE OWNER AT THE COMPLETION OF THE WORK. ALL LOCKS AND DEADBOLTS SHALL BE ELECTRICAL INSTALLATION SHALL MEET ALL STANDARDS AND REQUIREMENTS OF THE LOCAL ELECTRICITY written permission of Gene Farmer. 2. VERIFICATIONS OF EXISTING CONDITIONS: 2. PROTECTION OF ADJACENT PROPERTIES: KEYED ALIKE UNLESS SPECIFIED OTHERWISE. UTILITY AND TELEPHONE COMPANIES. EACH CONTRACTOR SHALL DETERMINE AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE 4, ACCEPTAN(`.F• THE ELECTRICAL SYSTEM SHALL BE COMPLETELY AND EFFECTIVELY GROUNDED AS REQUIRED BY THE BUILDING SITE AND BE RESPONSIBLE FOR SAME BEFORE COMMENCING THE WORK. DISCRE- TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ADJOINING PROPERTY FROM EXCESSIVE THE CONTRACTOR IS RESPONSIBLE FOR THE CONDITION AND OPERATION OF ALL HARDAWARE LATEST EDITION OF THE NATIONAL ELECTRIC CODE. DRAINAGE DEBRIS AND ASSUME FULL RESPONSIBILITY FOR DAMAGES RESULTING FROM PENCIES SHALL BE REPORTED TO THE ARCHITECT AND/OR ENGINEER AND SHALL BE RESOLVED � � UNTIL THE COMPLETION OF THE WORK AND ACCEPTANCE BY THE OWNER. BEFORE RESUMING THE WORK. DIMENSIONS SHALL BE READ AND NEVER SCALED OR ESTIMATED NEGLIGENCE. ALL WORK SHALL PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR AND IN A FIRST CLASS FROM THE ARCHITECTURAL DRAWINGS. WORKMAN LIKE MANNER. THE COMPLETED SYSTEM SHALL BE FULLY OPERATIVE. 3. F1 LL. SOIL BEARING CAPACITIES HAVE BEEN ASSUMED AT 2,000 P.S.I. UNLESS OTHERWISE CERTIFIED INTRUSION AND BURGLARY SECURITY NOTES: ALL REQUIRED INSURANCE SHALL BE PROVIDED FOR PROTECTION AGAINST PUBLIC LIABILITY AND HEREIN. SHOULD CONDITIONS OR MATERIALS BE ENCOUNTERED THAT REDUCE THE BEARING PROVIDE AND PLACE ANY ADDITIONAL FILL NEEDED TO BRING EXISTING GRADES TO NEW PROPERTY DAMAGE FOR THE DURATION OF THE WORK. CAPACITIES OF THE SOIL THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF THESE GRADES INDICATED ON THE DRAWINGS. DISPOSE OF ANY EXCESS EARTH ON PROPERTY AS 1. DOOR LOCKS ON ALL EXTERIOR DOORS SHALL BE CAPABLE OF RESISTING A FORCE OF 300 THE CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES, INSPECTIONS, AND TESTING. CONDITIONS PRIOR TO THE EXECUTION OF THE WORK. NECESSARY. LBS. APPLIED IN ANY MOVABLE DIRECTION AND IN ACCORDANCE WITH RESISTANCE STAND- ARDS SET FORTH IN METRO CODE 8C. ALL SINGLE EXTERIOR SWING DOORS SHALL HAVE A ALL WORK SHALL BE COORDINATED WITH THE OTHER TRADES TO AVOID INTERFERENCE WITH THE 3. CODE COMPLIANCE 4. LANDSCAPING: LOCK TO BE KEY OPERATED FROM THE EXTERIOR WITH A MINIMUM OF 6000 POSSIBLE KEY PROGRESS OF THE WORK. COMPLETELY REMOVE ALL TREES, SHRUBS, STUMPS, SOD, AND ALL OTHER ORGANIC DEBRIS CHANGES OR AN AUXILI_IARY LOCKING SINGLE DEADBOLT WITH HARDENED BOLT INSERTS. FROM AREAS TO BE COVERED BY THE BUILDING AND PAVED AREAS. 2. THE ACTIVE LEAF OF PAIRS OF EXTERIOR SWING DOOR SHALL HAVE THE SAME LOCKS AS 3. MATERIALS EACH CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION REQUIRED FOR SINGLE EXTERIOR SWING DOORS. THE INACTIVE LEAF OF THESE DOORS SHALL MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES, AND FOR SAFETY PRECAUTIONS HAVE MULTIPLE POINT LOCKS WITH 5/8" MINIMUM THROW BOLTS WITH HARDENED INSERTS. ALL MATERIALS SHALL BE NEW AND SHALL BEAR UNDERWRITERS LABELS WHERE APPLICABLE. MINIMUM CONNECTIONS WITH HIS PORTION OF THE WORK. 5• PAVING: WIRE SIZE SHALL BE #12 AWG UNLESS OTHERWISE NOTED. ALL CONDUCTORS SHALL BE COPPER WITH ALL ASPHALT PAVING SHALL BE 1" HOT PLANT MIX OVER 6" UNIFORMLY GRADED AND 3. SLIDING GLASS DOORS SHALL BE PROVIDED WITH SLIDING DOOR DEADBOLTS OR A BOLT OR TW INSULATION FOR #8 AND SMALLER. CONDUCTORS LARGER THAN #8 SHALL HAVE TYPE THW INSUL- 4. PERMITS_ FEES- AND TAXES: COMPACTED CRUSHED STONE BASE. AFTER PROPER CURING ENTIRE SURFACE SHALL BE PIN NOT REMOVABLE OR OPERABLE FORM THE EXTERIOR AT THE JAMB, HEAD, SILL OR AT ATION. ALL CONDUCTORS #10 AND SMALLER MAY BE SOLID AND THOSE #8 AND LARGER SHALL BE FULLY SEALED. MEETING MULLIONS. THESE DOORS SHALL BE REINFORCED IN THE STRIKE AND LOCK AREA STRANDED. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, LICENSES, AND DEPOSITS TO MAINTAIN BOLT STRENGTH EFFECTIVENESS, IF NECESSARY, AND SUCH DOORS SHALL HAVE SWITCHES SHALL BE HORSEPOWER RATED, HEAVY-DUTY QUICK-MATE, QUICK-BREAK AND DISCONNECT AND BE LIABLE FOR ALL STATE AND FEDERAL TAXES, AND ALL OBLIGATIONS UNDER THE 6. UNDERGROUND UTILITIES: NO SCREWS REMOVABLE FROM THE EXTERIOR WHICH WOULD FACILITATE READY ENTRY FROM DI DI A N.E.CT ENCLOSURE. ® t� FEDERAL SECURITY ACT. UPON COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL THE OUTSIDE. ALL RACEWAY OR PIPES PLACED IN OR THRU ANY CONCRETE SLAB SHALL BE SPACED A MINIMUM OF OBTAIN CERTIFICATES OF COMPLIANCE, APPROVAL OF ACCEPTANCE, FROM ALL AUTHORITIES THE CONTRACTOR SHALL CONTACT U.N.C.L.E. TO ASCERTAIN THE EXACT LOCATION OF ALL THREE DIAMETERS OF THE LARGEST CONDUIT OR PIPE FROM ANY OTHER SERVICE. HAVING JURISDICTION OVER THE WORK AND DELIVER THESE CERTIFICATES TO THE OWNER UNDERGROUND UTILITIES BEFORE EXCAVATING. DO NOT GO BY ORIGINAL CONSTRUCTION 4. HINGES ON ALL OUT-SWINGING EXTERIOR DOORS SHALL HAVE NON REMOVABLE PINS. ALONG WITH OFFICIAL RECEIPTS FOR THE SAME. DRAWINGS OR AS BUILT. THE CONTRACTOR SHALL COORDINATE WORK OF ALL TRADES IN 5. JAMBS OF ALL EXTERIOR OFFSET TYPE IN-SWINGING DOORS SHALL BE RABBETTED OR OF 0 C;d THIS AREA AND INFORM ALL SUB CONTRACTORS OF UNDERGROUND UTILITY LOCATIONS. SIMILAR FABRICATION, TO PREVENT DEFEATING THE PURPOSE OF THE STRIKE AND THE INTE- 4. GUARANTEE 5. PERFORMANCE OF THE WORK: GRITY OF LOCKS AND LATCHES. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP TO BE FREE FROM DEFECTS NO SUB CONTRACTOR SHALL BEGIN HIS WORK UNLESS THE PREVIOUS TRADE, UPON WHOM FINISH NOTES: 6. SINGLE SWINGING EXTERIOR WOOD DOORS SHALL BE SOLID CORE IF LESS THAN 1-3/8" FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER. V1 HE IS DEPENDENT, HAS PERFORMED THEIR WORK SATISFACTORILY ACCORDING TO THE PLANS THICK. CORRECTION OF DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND INCLUDE ANY 1�1 AND SPECIFICATIONS. ONCE THE CONTRACTOR HAS STARTED HIS WORK, ASSUMES FULL 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL FINISHES AS REPLACEMENT OR REPAIR OF ANY ADDITIONAL CHARGE AND INCLUDE REPLACEMENT OR REPAIR OF ANY RESPONSIBILITY FOR THAT WORK, BOTH THE MATERIALS AND LABOR PERFORMED. ALL INSTALLING CALLED FOR IN THE DRAWINGS AND SPECIFICATIONS. 7. GLASS AND EXTERIOR DOORS SHALL COMPLY WITH THE AMERICAN NATIONAL STANDARDS OTHER PHASE OF INSTALLATION WHICH MAY HAVE BEEN DAMAGED. CONTRACTORS ARE RESPONSIBLE FOR REMOVING DEBRIS, RESULTING FROM THEIR WORK INSTITUTE STANDARD 297.1. FRONT MAIN ENTRANCE DOORS SHALL BE PROVIDED WITH A FROM THE PREMISES. 2. CERAMIC TILE: DOOR SCOPE OF VISION PANELS. 6. CLEANUP: ALL CERAMIC TILE GROUT MORTAR AND ACCESSORIES, 8. VISION PANELS IN EXTERIOR DOORS OTHER THAN GLAZING WITHIN 40" OF THE INSIDE LOCK- , A CESS RIES, SHALL BE SUPPLIED AND INSTALLED ING ACTIVATING DEVICE OF LOOSE AND SWINGING DOORS SHALL COMPLY WITH AMERICAN IN ADDITION TO THE REMOVAL OF ALL CONSTRUCTION DEBRIS FROM THE PREMISES, IT IS THE BY THE CONTRACTOR UNLESS NOTED OTHERWISE. NATIONAL STANDARDS INSTITUTE'S - STANDARD 297.1. FINAL RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ALL SMUDGES, SPOTS OF PLASTER, THE TILE CONTRACTOR MUST INSPECT ALL SURFACES CAREFULLY PRIOR TO THE INSTALLATION PUTTY, CAULKING COMPOUND, ADHESIVE, PAINT AND PENCIL DRAWINGS, TAGS AND DESTINATION 9. SLIDING GLASS DOORS AND WINDOWS SHALL BE INSTALLED AND CONSTRUCTED SO THAT NO OF MATERIALS. HE SHALL REPORT TO THE ARCHITECT AND GENERAL CONTRACTOR ANY LABELS NOT CALLED FOR AS BEING PERMANENT. THE CONTRACTOR SHALL ALSO CLEAN EACH PANEL CAN BE LIFTED FORM THE TRACKS WHEN IN THE LOCKED POSITION AND SO AS TO SURFACE NOT SUITABLE FOR THE INSTALLATION OF HIS WORK. IT IS THE RESPONSIBILITY AREA SEPARATELY, INCLUDING THE WASHING OF ALL WINDOWS AND VACUUMING OR WAXING COMPLY WITH THE ARCHITECTURAL ALUMINUM MFGS. ASSOC. STANDARDS FOR FORCED ENTRY OF THE GENERAL CONTRACTO TO CORRECT ALL SURFACES. ALL SURFACES MUST BE OF ALL FLOORS, PRIOR TO HANDING THE COMPLETED PROJECT OVER TO THE OWNER. THROUGHLY CLEANED PRIOR TO THE INSTALLATION OF THE TILE SETTING BED. INSTALLATION RESISTANCE, AAMA 1303.3. OF MATERIALS CONSTITUTES ACCEPTANCE OF THE SURFACES. 10. DOORS AND WINDOWS: ALL EXTERIOR SLIDING GLASS DOORS AND WINDOW MUST BE APPROVED 7' BY DADE COUNTY PRODUCT APPROVAL INSTALLATION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CERAMIC TILE ALL MATERIALS SHALL BE NEW, AS CALLED FOR IN THE DRAWINGS, AND THE BEST OF THEIR INSTITUTE'S MOST RECENT INSTALLATION MANUAL THE FINISHED TILE SURFACE SHALL BE rT, RESPECTIVE KINDS. NO SUBSTITUTIONS SHALL BE MADE BY THE CONTRACTOR WITHOUT PRIOR LEVEL WITH NO BUMPS OR RIDGES. GROUTED JOINTS SHALL BE STRAIGHT AND OF CONSIS- ® v==, p WRITTEN APPROVAL BY THE OWNER, UNLESS SPECIFIED OTHERWISE IN THE DRAWINGS. FOR TENT WIDTH. INSTALLATIONS NOT IN ACCORDANCE WITH THESE SPECIFICATIONS WILL BE PORTIONS OF THE WORK NOT SHOWN IN DETAIL, BUT WHICH ARE SHOWN GENERALLY, OR REJECTED AND THE CONTRACTOR WILL BE RESPONSIBLE FOR REDOING THE WORK AT HIS fi 1L ARE REASONABLY INFERRIBLE AS BEING REQUIRED FOR A COMPETENT AND COMPLETE OWN EXPENSE. b�L INSTALLATION, THE MATERIAL, METHODS AND WORKMANSHIP SHALL CONFORM AS A MINIMUM ® TO THE TYPICAL OR REPRESENTATIVE DETAIL THROUGHOUT CORRESPONDING PARTS OF THE ALL CERAMIC TILE SHALL BE CLEANED, POLISHED AND LEFT IN PERFECT CONDITION AT THE F� BUILDING. COMPLETION OF THE WORK. PROVIDE PROTECTION FOR ALL FINISHED SURFACES BEFORE PERMITTING ACCESS TO THE AREAS BY OTHERS. ® d 8. FIRE RESISTIVITY. 3. VINYL TILE AND RESILIENT FLOORING: WHERE ASSEMBLIES OF THEIR VARIOUS COMPONENTS, MATERIALS, OR CONSTRUCTION SYSTEMS ALL VYNIL TILE, RESILIENT FLOORING, ADHESIVES AND ACCESSORIES SHALL BE SUPPLIED AND ARE INDICATED TO HAVE FIRE RESISTIVITY RATINGS, UNDERWRITERS LABORATORY RATINGS, ETC., ALL SUCH SHALL COMPOSED OF MATERIALS AND BE ASSEMBLED SO AS CONFORM INSTALLED BY THE CONTRACTOR UNLESS NOTED OTHERWISE. INSTALLATIONS SHALL BE IN ARCHITECTURE THE STANDARDS ESTABLISHED IN THE GOVERNING CODES IN ORDER TO ACHIEVE ACCORDANCE WITH INDUSTRY'S STANDARDS. WHEN NECCSSSARY FLOORING SHALL BE CARE- RATING IN THE COMPLETED WORK. E THE REQUIRED FULLY JOINED TO CONTINUE PATTERNS WITHOUT INTERRUPTIONS. 4. CARPETING AND PADDING: 9. CUTTING AND PATCHING: EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING, FITTING, PATCHING, AND ALL CARPETING AND PADDING SHALL BE SUPPLIED AND INSTALLED BY THE CONTRACTOR UNLESS NOTED OTHERWISE. INSTALLATION SHALL BE IN ACCORDANCE WITH ALL INSUSTRY MATCHING OF HIS NEW WORK TO EXISTING WORK., WHERE APPLICABLE AND INDICATED IN STANDARDS. THE DRAWINGS. NO CONTRACTOR SHALL ENDANGER ANY WORK OF ANY OTHER CONTRACTOR BY EXCAVATING, CUTTING OR OTHERWISE ALTERING ANY WORK OF ANY OTHER CONTRACTORS. 5, PAINTING AND STAINING: ROOFING SHALL BE INSPECTED BY A CERTIFIED ROOFING CONTRACTOR TO DETERMINE WATER TIGHTNESS AT EXISTING ROOFING THAT IS PENETRATED OR OTHERWISE ALTERED BY NEW WORK. ALL SUFACES WALLS, CEILINGS, DOORS, WOODWORK AND TRIM, ETC. SHALL BE SANDED ROOFING CONTRACTOR SHALL REPAIR AND PATCH SUCH AREAS AS REQUIRED OR AS SMOOTH AND FULLY PREPATED TO RECEIVE FINISHES AS SPECIFIED HEREIN. INDICATED IN THE DRAWINGS, TO THE EXTENT THAT THE ROOF SHALL BE BONDABLE. ALL NEW BUILT UP ROOFING TO BE 3-PLY WITH HOT ASPHALT MOPPING OF EACH 30 LB. PATCHED WALLS SHALL BE PAINTED FLOOR TO CEILING, CONER TO CORNER, TO MATCH EXIST- ROOFING FELT. ING. IF COLOR MATCH IS NOT POSSIBLE, THE ARCHITECT SHALL BE NOTIFIED AND THE ENTIRE ROOM SHALL BE REPAINTED. 10. DEMOLITION: ALL PATCHED CEILINGS SHALL BE PAINTED CORNER TO CORNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF DEBRIS FITTING. OF ALL SPECIFIED N NTHEDRAW NGS. DQST INGAUNUSED REQUIRED TO OAND PLUMB CONSTRUCTION AS WOOD JOINTS TO BE EO REMOVED WOOD JOINTS TO BE STAINED SHALL BE TIGHT FIT ING AND SANDED SMOOTH.THD SANDED SMOOTH. G E N E F A R M E R AND ADEQUATELY CAPPED AS ALLOWED BY CODE. & ALL WOOD AND METALS SHALL BE SANDED SMOOTH BETWEEN EACH COAT OF PAINT MATERIAL A S S O C I ATE S 11. PROTECTION OF PROPERTY, APPLIED. THE TERM SMOOTH MUST BE INTERRUPTED TO MEAN FREE FROM ALL ROUGHNESS, RIDGES, RUNS, SAGS AND PROJECTIONS ON THE SURFACE. ARCHITECTS - PLANNERS THE CONTRACTOR SHALL PROTECT ALL ADJACENT PROPERTY, ROADS, AND WALKS FROM ALL MATERIALS SHALL BE APPLIED AS PER THE MANUFACTURER'S RECOMMENDATIONS. ALLOW EX DAMAGE DURING THE COURSE OF CONSTRUCTION. ALL DAMAGE TO SAID X PROPERTY, ROADS, 24 HOURS DRYING TIME BETWEEN COATS. 13321 SOUTHWEST 124 STREET AND WALKS SHALL BE REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE. 10AMI,FL./F000088/305-235-7400 ALL PAINT AND STAIN SHALL BE APPLIED BY BRUSH OR ROLLER UNLESS SPECIFIED OTHERWISE. 12. UTILITIES: ALL MATERIALS TO BE APPLIED SMOOTHLY AND EVENLY AND TO BE FREE FROM HOLIDAYS ARCHITECT THE CONTRACTOR SHALL PROVIDE AND PAY ALL CONSTRUCTION WATER AND ELECTRICITY AND VARIATIONS IN SHEEN AND COLOR. IN THE EVENT OF "HOT SPOTS' OR "SUCTION SPOTS" INCLUDING ALL TEMPORARY WASTE AND ELECTRICAL INSTALLATIONS , AND FOR DISPOSAL OF AFTER SUCH APPLICATION, THESE SPOTS ARE TO BE TOUCHED UP TO GIVE AN EVEN SHEEN ALL SPILLED BUILDING WATER. �.° BEFORE APPLYING THE SECOND COAT. 13. BASE WATERPROOFING: THE CONTRACTOR SHALL APPLY THREE FOOT SQUARE COLOR SAMPLES OF ALL PAINT COLORS AND OBTAIN THE ARCHITECTS APPROVAL PRIOR TO CONTINUING THE APPLICATION. IN ANY AREA WHERE THE FINISHED GRADE IS TO BE HIGHER THAN THE FINISHED FLOOR S LEVEL, THAT PORTION OF THE WALL IS TO BE COATED WITH ONE HEAVY COAT OF BITUMASTIC ACCEPTABLE PRODUCTS INCLUDE: BENJAMIN MOORE, DUPONT. PPG, SHERWIN-WILLIAMS DEVOE, "� w ' 1 �? ;• WATERPROOFING, TO PREVENT WATER INFILTRATION. THE INSIDE WALL SURFACE OF ALL RAISED PRATT AND LAMBERT. SUBSTITUTIONS MUST HAVE THE ARCHITECTS APPROVAL PRIOR TO PLANTERS SHALL ALSO BE COATED WITH BITUMASTIC WATERPROOFING. PURCHASE OR APPLICATION. ,Yom,• . 14. TERMITE TREATMENT: EXTERIOR SURFACES: GENE% ARMEi IIA THE CONTRACTOR SHALL PROVIDE AN APPROVED METHOD OF TERMITE TREATMENT TO SOILS A. STUCCO: 2 COATS BENJAMIN MOORE MOOREGARD EXTERIOR LATEX HOUSE PAINT. AROUND ALL FOOTINGS AND UNDER CONCRETE SLABS. B. UNPRIMED METAL 1 COAT OF PRIMER AND 2 COATS OF ENAMEL C. FACTORY PRIMED METAL 1 COAT OF PRIMER AND 1 COAT OF ENAMEL 15. DISSIMILAR METALS: D. STAIN FINISH WOOD: 1 COAT OF "WOODLIFE' AND 2 COATS OF "OLYMPIC" SEMI CONSULTANT THE CONTRACTOR SHALL PROTECT AGAINST ELECTROLYTIC ACTION BETWEEN DISSIMILAR METALS TRANSPARENT STAIN. BY WRAPPING POINTS OF CONTACT WITH INDUSTRIAL FABRIC TAPE AND COAT WITH HEAVY INTERIOR SURFACES: BODY BITMINOUS PAINT OR OTHER ELECTRICAL INSULATION. A. PLASTER AND DRYWALL WALLS: 2 COATS OF SATIN OR SEMI FLAT LATEX PAINT. 16. SUBSTTTU110NS: B. BATHROOM, KITCHEN, UTILITY WALLS: 2 COATS OF ENAMEL C. DOORS, WOODWORK AND TRIM PAINT FINISH : 1 COAT PRIMER AND 2 COATS OF ENAMEL WHERE THE PRODUCT OF A CERTAIN MANUFACTURER IS SPECIFIED, NO SUBSTITUTION WILL D. DOORS, WOODWORK AND TRIM STAIN FINISH): 2 COATS OF STAIN AND 2 COATS OF BE ACCEPTED DURING THE BIDDING PHASE. AFTER A CONTRACTOR HAS BEEN SELECTED, VARNISH. SUBSTITUTIONS MAY BE PRESENTED TO THE ARCHITECT FOR APPROVAL IF SAID SUBSTITUTION IS EQUAL IN QUALITY AND PERFORMANCE TO THOSE SPECIFIED IN THE WORKING DRAWINGS AND SPECIFICATIONS, AND IS IN STRICT ACCORDANCE WITH ALL GOVERNING BUILDING CODES. 17. JOB SUPERVISOR: THE GENERAL CONTRACTOR SHALL HAVE A QUALIFIED SUPERVISORY REPRESENTATIVE ON THE PROJ JOB SITE AT ALL TIMES WORK IS BEING DONE, BY ANY SUB-CONTRACTOR TO OVERSEE AND COORDINATE THE VARIOUS ELEMENTS OF THE JOB. DATE 5-07-01 95 BY EDF OF 5