Loading...
01-0098-014 • s PECIFICAT IONS GENERAL NOTES jMOLITION NOTES MECHANICAL GENERAL PROVISIONS ELECTRICAL NOTES: f 1 Provide all items, articles, equipment, materials, labor, PART 1 - GENERAL tv) fl operations, services and all incidentals as required, as WORK INCLUDED ;/ 1. Existing electrical devices have not been shown. n 1 v indicated, specified or both, by the Contract Documents for the WORK INCLUDED Contractor is required to visit site and become Vf satisfactory completion of the work. All materials, labor, equipment and related services required to / complete all demolition operations as indicated and/or Mechanical work as indicated, inferred on drawings includes but familiar with the existing conditions prior to — Provide all required coordination with other related and specified. is not limited to: determining the work that needs to be accomplished. — applicable trades to execute the work without delays. Demolition includes certain interior demolition and the removal Heating, Ventilating, Air conditioning Systems 2. Routing of raceways, interconnecting outlets and home- Take all necessary precautions to execute work during inclement and disposal of demolished materials, as shown on the drawings Plumbing System runs is up to the electrical contractor, but after r 1 VJ weather and temperature ranges which are detrimental to the and herein specified. Fire Protection Systems completion of drawings of his work for future record. performance of said work or products, all in strict accordance Mechanical Identification +vlf' with manufacturer's printed recommendations, specific standards PROJECT CONDITIONS Testing, Adjusting, Balancing and applicable industry standards. Systems Starting, Demonstrations 3. All conductors shall be copper. Acceptable insulation Condition of Structure: the Owner assumes no responsibility for Maintenance Instructions types are TW, THW, THHN, THWN, and XHHN, with uses as The complete preparation, installation and workmanship of all the actual condition of construction to be demolished. Mechanical Testing, Adjusting, Balancing restricted by the N.E.C. Ampacities of conductors is to the work and/or systems as called for and detailed on the be based on article 310 of the N.E.C. with UL drawings shall be provided in strict accordance with the Existing Structure: the Contractor shall thoroughly review all QUALITY ASSURANCE drawings, manufacturer's standard printed specifications, drawings and shall visit the site to acquaint himself with all limitations: 60 deg. rating for sizes #14 through #1; U g , P instructions, recommendations and in full accordance with all conditions relevant to the demolition work, including the National, local building, utility codes, rules, regulations, 75 deg. for #1/0 and larger. Cables 3/0 and larger L_ 0 applicable building codes, rules and regulations of all other general conditions of the features that are to remain and of requirements, other public agencies having jurisdiction upon shall be terminated with pressure crimp connectors. C '- public agencies having jurisdiction upon the work. those to be demolished. work, applicable recognized industry standards. O co I Repair to Architect's satisfaction all minor defective and/or Partial Removal: remove only the construction, finishes or items PERMITS. INSPECTIONS 4. Device boxes shall be installed flush, conduit shall be rrnn � � 0 a damaged work and finished surfaces. indicated or specified. Materials removed shall become the: concealed. All conductors shall be conduit. All v! U m O^^ property of the Contractor and shall be transported from the Obtain permits, inspections for execution of Mechanical Work, pay sections of metallic conduit system shall be grounded � � N � � 3 [E Q O Replace with same quality, type, finish and color all defective, site as they are removed. Storage or sale of removed items will charges incidental thereto. Deliver to Architect copies of and electronically continuous. Use electrical metallic C broken and/or damaged work and finished surfaces. not be permitted on the site. permits, certificates of inspections issued by authorities having jurisdiction. tubing (EMT) for interior concealed wiring and © QQU elsewhere as permitted by the N.E.C. Install a nylon Q S d ��� �a Make all necessary fitting and adjustments to all operating PREPARATION. INSTALLATION. WORKMANSHIP pull-cord in all empty raceways for future use. components and/or systems as may be required. DELIVERY. STORAGE, HANDLING Utility services: Repair, replace, adjust, clean and protect all work to maintain existing utilities not indicated to be removed, Store materials, equipment off ground, under cover, protected 5. Route raceways to avoid conflicts with the work of Architect's full satisfaction until final completion and keep in service, and protect against damage during from damages. Store packed products in manufacturer's unopened other trades. acceptance. demolition operations. Do not interrupt existing containers fully identified with manufacturer's name, trade name, utilities serving occupied or used facilities except when type, class, grade, size, color. 6. All electrical equipment shall be removed from Coordinate as required and be totally responsible for the full authorized in writing by' authorities having jurisdiction. structure to be removed. Accessible raceways wires and satisfactory compatibility and performance between all Provide temporary services during interruptions to PROJECT CONDITIONS y > materials and systems with all other applicable and related existing utilities, as acceptable to the governing boxes, switches, and other electrical items associated trades providing work which may be in direct contact with or authorities. Drawings indicate general design, equipment, systems. Data shown with this work shall be removed if not required for new adjacent to each other. is diagrammatic in character, does not necessarily indicate every equipment to continue in service. General Demolition: required offset, fitting. Do not scale drawings for dimensions. Take all required steps and precautions to properly isolate and Interior construction and finishes: remove interior Install piping, ductwork in such manner as to conform to prevent any degree of incompatibility between said materials and partitions, ceilings, doors, frames, and other structure, to avoid obstructions. 7. When electrical devices are installed in partitions or systems all in strict accordance with manufacturer's construction and finishes only where indicated or ceilings to be removed, the electrical contractor shall specifications, recommendations and instructions.. required. Refer to architectural drawings for dimensions, finish, levels, disconnect them up to the next outlet to remain or back locations. Ceiling mounted items as diffusers, sprinkler heads, to the panelboard. If existing to remain outlets are Intent of Contract Documents: ultimate performance achieved by Remove portions of the building in a systematic manner. access panels: located as indicated on reflected ceiling drawings fed through demolished partitions or ceilings, the completed project. Therefore, P rovide, without exception, all where such items are indicated thereon. circuit shall be rearranged to maintain circuit costs relative to final, exact locations, routing, quantities, Neatly cut materials to be removed from areas to remain. termination points, sizes, thicknesses, ratings, spacing, other Electrical connections to motors, starters, resistance heaters continuity. Wire shall be removed back to source from applicable, required features, components for completed systems All demolition work shall be done under the superv3.sion shall match wiring indicated, specified by manufacturer. inaccessible raceways not reused. fully as per applicable building codes, rules, regulations, of a competent foreman. Examine related specification divisions, drawings covering work a pp licable quality standards, other public a g encies havin g f� !�1 jurisdiction upon completed work. Do not remove any load bearing wall or columns. Do not other than mechanical. If any discrepancies are observed between 8. All building construction affected by the removal, disturb the structural integrity of'any part of the: work of this division, work of other divisions, report such relocation, installation of any piece of equipment I� Contractor shall check computed dimensions, follow same in building to remain. discrepancies to Architect for clarification. shall be repaired and finished as required to match Rr preference to scaled dimensions. Computed dimensions shall have existing conditions. M smalldescale drawings. All idiscrepancies: reported inawritin over y g y Department y gle and RECORD DOCUMENTS Flame cutting devices: strictly follow N.F.P.A. Coc - ---- - e notify the city Fire when flame cutting Architect, verify all field measurements. P g devices are to be used. Label each document "Record Document". Mark information with contrasting color using ink. Keep each record current. Do not E-e � W In event that there is ambiguity, conflict or disagreement REPAIR REPLACE ADJUST CLEAN PROTECTION permanently conceal any work until required information is relating to items or arrangements to be furnished under Contract recorded. General Notes n Ono Documents, Architect will determine which takes precedence, it Pollution Controls: is understood that Contractor shall furnish items or Use temporary enclosures and other suitable methods: to Record following information on drawings as.minimum requirement: r•y �. Q; arrangements of greater quantity, better quality, or higher cost limit the amount of dust and dirt rising and scattering The following items are to be furnished by the as conclusively determined by Architect. in the air to the lowest practical level. Horizontal, vertical location of underground utilities. .owner and installed by the contractor. Location of internal utilities, appurtenances concealed in W � M Comply with governing regulations pertaining to construction. Architect reserves right of a reasonable amount of shifting of P Y g P g �i environmental protection. Field changes of dimension, detail. 1. Plumbing Fixtures � r� systems components locations that may affect ultimate aesthetic P g e appearance, at no additional costs until time of roughing-in Changes by change order or field order. 2 . Plumbing Fitt.in s work. Clean adjacent structures and improvements of dust, dirt, Details not on original contract drawings. g g Q and debris caused by demolition operations, as directed Manufacturer, trade name, catalog number, supplier •)f each 3 . Finish Hardware (exist. & new doors) Applicable standards of construction industry such as- ASTM - by the Architect or governing authorities. Return product, item of equipment actually installed. 4 . Lighting Fixtures. i ACI - AWI - ANSI - NEMA - TCA - UL - etc. have same force, adjacent areas to conditions existing prior to the start effect, are a full part of Contract Documents by reference as if of the work. Maintain shop drawings as record documents recording changes made bound into Contract Documents. after review as specified for drawings above. Disposal of demolished materials: Referenced standards have precedence over non-referenced General: remove from the project site debris, rubbish, PART 2 - PRODUCTS standards recognized in said industry. and other materials resulting from demolition operations and dispose of same legally. MATERIALS. EQUIPMENT. SYSTEMS {� Recognized non-referenced standards will be so enforced for Trash: remove all trash, supplies and loose Specific types, design, quality, sizes, gauges, finishes, performance of applicable work. non-salvagable items. capacities, speeds, performance, identification: as indicated on Comply with standards in effect as of date of Contract Documents drawings. notwithstanding existence of safety standards in specifications, Dumping site: contractor shall arrange for a legal Architect shall not be responsible for compliance with said dumping site and shall assume any costs or fees for use Materials, devices used in fabrication, construction of various safety standards. of the dumping site. ofrASTM, ASME, UL, included AMCAnwhereasuchlstandards per pplstandards r � r ► apply. Provide trades persons that are skilled in applicable Clean-Up: craftsmanship to. produce quality workmanship. Remove, replace Vacuum or sweep clean all floors. Where equipment is specified by catalogue number, such numbers at no additional costs, work not complying with required are used for descriptive purposes, equipment shall comply with standards recognized in industry for specific applications. Protection: additional requirements of specifications or with referenced Remove, replace at no additional costs, otherwise damaged work. Ensure the safe passage of persons around the area of regulations, standards. demolition. Conduct operations to prevent injury Submit any proposed structural cutting, patching not indicated discomfort caused by dust to adjacent buildings, Similar equipment, apparatus, valves: of same manufacturer, type on drawings to Architect for review before execution. Do not structures, other facilities, and persons. whenever possible. cut, patch exposed interior, exterior work which will reduce provide public protection as required by the local Valves, gauges, thermometers, switches, control devices: aesthetic qualities, or reduce performance, safety. Visually unsatisfactory patching: replaced to Architect's full building inspection authorities. furnished as standard part of any piece of equipment that may satisfaction. conform to that equipment manufacturer's standard. Demolition shall be performed in a manner which will Submit samples of materials, units of work as selected for create an absolute minimum amount of vibration and If any product requires a special tool, key, or device for visual inspection or where required for evaluation. eccentric loads to the structures to remain. assembly, adjustment setting, or maintenance it:. furnished with product. Provide necessary procedures for noise, dust control during Exercise all precautions to protect and prevent from entire construction period. damage to all features and portions of the buildinc; to Products shall conform to applicable governmental or utility remain. codes, regulations, or requirements. Initiate, maintain a program to prevent accumulation of debris Protect existing finished surfaces. PART 3 - EXECUTION at construction site. Damages: PREPARATION. INSTALLATION. WORKMANSHIP Provide required type containers for deposit of debris. Promptly repair damages caused to adjacent facilities or D mr71� Bra Schedule periodic removal of waste, debris, rubbish from site the building to remain by demolition operations at no Close ends of pipe 'Protect luring construction to prevent entry cost to the Owner. of foreign material. Protect insulation against dirt, water, periodically. Dispose of legally away from site. chemical or mechanical damage before, during, after During construction provide weekly cleaning to keep work, site, ApprOr. By: J K installation. Protect fixtures, equipment against damage during, after installation. adjacent properties free from waste, rubbish, windblown debris, resulting from construction work. Installation: as per applicable governmental or utility codes, _ Date regulations or requirements. Coordinate timing of inspections by Provide cleaning materials which will not create hazards to health or property, will not damage finished surfaces. authorities having jurisdiction, if applicable. Be responsible for modification in space requirements, RevW®n. Provide cleaning materials, methods recommended by manufacturer configurations, performance, changes in bases, supports, of surface material to be cleaned. structural members, openings in structure, other apparatus or work under another division of work that may be affected by Prior to final acceptance, Contractor shall inspect site, exposed interior, exterior surfaces to verify that entire work approved substitutions. is clean to full satisfaction of Architect. . When in operation, systems: free from noise, vibration: Loose items secured, .items such as duct dampers locked into position to prevent "rattling". Install piping, ductwork, equipment so as to maintain maximum headroom, clearances. Piping, ductwork shall not interfere with operation of or accessibility of doors; shall not encroach on aisles, passageways, or access area to equipment, shall not---- _ -__ interfere with servicing or removal of equipment. Project N0: r . (?�`' �`kp It a. :o �• .t Sheet Na ' Total Ffle: ---- ----- -- -----