Loading...
01-0033-013 __ MDF,PANT TO - ASeE EXISTING ROOF DECK 107'-0" MATCH WALL - Architecture TOP OF WALL I I p ,--- - = _ __- -Civil Engineering o Structural Engineering 16 a.METAL 1pJdIJEL __ Mechanical Engineering CI. g Electrical Engineering N D1-07 O 1/2" GYPSUM BOARD Construction Management' OVER 1/2' PLYWOOD CEILING AS SCHEDULED Food Service Design 18 ga.3 5/8"METAL SHEATHING.. FNSIH GYPSUM BOARD 6" I 9 Project Management CONTINUOUS 6" -14GA. 1121-0— " __ STUDS o 24" O.C. 16 a.METAL CHANNEL ABOVE CEILING 1x6 PAINT _P771 Planning and Zoning SLIP TRACK WITH 31/2" CEILING O w/NON-COMBUSTIBLE MDF �' P LAGS (DIETRICH TOG, 1/2" GYPSUM BOARD WOOD BLOCKING o EACH *ga.METAL CHANNEL OR EQUAL) OVER V2" PLYWOOD POINT OF CONNECTION TO WALL AS SCHEDULED. REFER OPEN GRID SYSTEM SHEATHING. SLAB TO FLAK 2x4 METAL STUD PLATE TRACK O 1/2"GYP BOARD OVER t/2" PLYWOOD SWEAT14NG FINISH FLOOR REFER TO PAINT P-1 FINISHED FLOOR _ „ DIA.EXPANSION V8" 1201 Dublin Road SECTION Columbus,Ohio 43215-1026 D1==0%3 SCALE: 3/4" = 1'-0" o Tel: 614.221.0840 J-BOX. REFER TO o Fax: 614.221.2484 FIRE STOPPING , „ ELEC.POWER PLAN p p email: Inbox@wdoe.com 107 TRIM DETAIL www.wdae.com TOP OF WALL MDF,PANT TO MATCH WALL STRIP FLOURESCENT REFER TO 1®�6 SCALE: 1 1/2" = 1'-0" to I& ga.METAL. CHANNEL V8' ELECTRICAL DRAWINGS f •- Y- 110,-0" A.F.F. LAY-IN ACOUSTICAL D1-06 0 TOP OF SOFFIT o CEILING TILE. 6" METAL STUDS o 24" OTC i o` exlb" OJC. SETCUREnTIO WALLS 0 < 2X4 2 a.METAL STUD FRAMING I/2' GYPSUM BOARD �`�, o I6"O.C. SECURE TO WALLS USING p'1 TEK SCREWS o METAL STUDS AND V4"MASONRY SCREWS OVER 1/2' PLYWOOD USING +12 TEK SCREWS o METAL o MASONRY WALLS w/MIN.3" 5/8 TYPE X GYP. SHEATHING STUDS AND V4" MASONRY SCREWS r o MASONRY WALLS w/MIN.3° PENETRATION. SPACE 6" OTC. BOARD.FINISH TO O PENETRATION. SPACE o 6" OTC. w/(2)ADDITIONAL SCREWS o THE BO'T'TOM OF ROOF DECK w/(2)ADDITIONAL. SCREWS o THE TOP AND BOTTOM. 't BOTH SIDE REFER TOP AND BOTTOM. Ix MDF BOARD PAINT TO ELEVATIONS FOR _ IS ga.3 5/8' METAL 0 UL FNISHES. STUDS o 24r O.C. 2 V2"METAL STUD BRACNG lbga METAL CHAM�EL O 2 In"METAL STUD BRACING p TYPICAL. FASTEN USING (2) _ V4"A V2"MDF,PAINT P-1 Cn TYPICAL. FASTEN USING (2) o q0-16 SCREWS OR V8 WF�D _ 2x4 METAL STUD o X10-16 SCREWS OR 1/8" WELD I/2' GYP.BOARD OVER M toga.METAL CHANNEL °' VARIES � I/2" PLYWOOD SHEATHING �i■■ PAINT P-1 1/2 GYPSUM BOARD � w/NON-COMBUBTI o�4CH VARIES VARIES REFER TO ELEVS. O WOOD BLOCKING E �� OVER t/2" PLYWOOD POINT OF CONNECTION TO VARIES REFER TO ELEVS. REFER TO REFLECTED CILNG PLAN V2" GYPSUM BOARD 6 18ga.STEEL TRACK SHEATHING. SLAB REFER TO REFLECTED CILING PLAN 1/2" GYPSUM BOARD DEFER TO FINISH SCHEDULE TOP t 1301. 1/2" DIA.EXP.ANCHORS O FINISH FLOOR REFER TO REFER t0 FINISH SCHEDULE 0 24" OTC.TOP t SOT. FLOOR FINISH PLAN D WALL AS SCHEDULED. REFER 1 O - FINISHED FLOOR 1/2" DIA.EXPANSION TO PLAN. ANCHORS o 24' O.C. U 1.01 SECTION SECTION m SOFFIT SECTION ,� SOFFIT ,SECTION TRIM DETAIL " V-00) ° " _ '- " D U ALE: 3 4 = 1 -0 U S ALE: 3 4 - 1 -0 SCALE: 1 1 2 - 1 0 Lim CALE: 3 4 D IJ � ALE. 3 4 1 0 / / / Ll a � c - UNISTRIT DIAGONAL UNISTR T DIAGONAL BRACING. TACK WELD BRACING. TACK WELD BRACING TO TOP CHORD BRACING TO TOP CHORD 1 EXISTING STRUCTURE EXISTING S� t. - c3 15/8" UNISTFUT. ATTACH E , TO STRUCt w/IMISTRIJt CLIP 15/8' UNISTRUT N 2UDU 1/2'0 THREADED ROD. V2"0 THREADED ROD REVISIONS m CONAECTION TO DUCT CONNECTION TO DUCT PER MFR.SPECS PER NPR.SPECS #1 11/16/00 CEILING AS SCHEDULED CEILING AS SCHEDULED 26"xiS" DUCT COVER 26'xB" DUCT COVER BY HOOD MANUFACTURER BY HOOD MANUFACTURER w ISSN FOR PST& 11/16/00 189 FOR W& 11/16/00 z N FRONT !VIEW SIDE VIEW � r "'$T � #1 11/16/00 WDME PROJWT NM V 0.462 W %EET NM D1 ��-jj HOOD DETAIL © Uo®� / SCALE: 3 4' = 1'-0 " ,C . --- __ y