01-0404-002 Ll
O
Ln
L0
O
�[/1 0- dN
ABBREVIATIONS INDEX OF DRAWINGS
0
rq 0 4 u � o
� o
SHEET NO. DESCRIPTION r Q
COVER SHEET `'-
0
A/C AIR CONDITIONING NGVD NATIONAL GEOTECHNICAL VERTICAL DATUM ARCHITECTURAL E c:
ABV ABOVE N NORTH o
AC ACOUSTICAL NIC NOT IN CONTRACT A-1 ABBREVIATIONS, INDEX OF DRAWINGS, SCOPE OF WORK AND GENERAL NOTES E
ACC ACCESS NTS NOT TO SCALE A-2 EXISTING / DEMOLITION FLOOR PLAN
AFF ABOVE FINISHED FLOOR OA OVERALL v .)
AHU AIR HANDLING UNIT OC ON CENTER A-3 OVERALL FLOOR PLAN °
ALT ALTERNATE OD OUTSIDE DIAMETER Q) `
ALUM ALUMINUM OH OVERHEAD A-4 PARTIAL WINDOW ELEVATIONS AND DETAILS 41
ANOD ANODIZED OPH OPPOSITE HAND A-5 ENLARGED TOILET PLANS : DEMOLITION PLAN — PROPOSED FLOOR PLAN C14
AP ACCESS PANEL OPNG OPENING PROPOSED REFLECTED CEILING PLAN AND INTERIOR ELEVATION ( ' )
ARCH ARCHITECTURAL) OPP OPPOSITE Q?
BLDG BUILDING PL PROPERTY LINE
BLK BLOCK PLAS PLASTER
BM BEAM PLT PLATE MECHANICAL u N
CB CATCH BASIN PMT PAVEMENT
CEM CEMENT PNL PANEL M-1 PARTIAL EXISTING/DEMOLITION HVAC PLAN
CHBD CHALKBOARD PNT PAINT NEW HAVC FLOOR PLAN, NOTES AND LEGEND
CHT CEILING HEIGHT PNTD PAINTED
CLG CEILING PVG PAVING
CMU CONCRETE MASONRY UNIT PVMT PAVEMENT
W
COL COLUMN PWD PLYWOOD PLUMBING - z O
CONC CONCRETE QT QUARRY TILE z
CONST CONSTRUCTION RA RETURN AIR P-1 PARTIAL EXISTING/DEMOLITION PLUMBING PLAN
CONT CONTINUOUS RAD RADIUS
NEW ELECTRICAL POWER/LIGHTING PLAN, NOTES AND LEGEND Q —J
O�
CPT CARPET RAG RETURN AIR GRILLE p Q
0�
CT CERAMIC TILE RAI RETURN AIR INTAKE
DEM DEMOLISH, DEMOLITION RB RUBBER BASE ELECTRICAL W z
DEP DEPRESSED RD ROOF DRAIN O W
DIET DETAIL REF REFERENCE E-1 PARTIAL EXISTING/DEMOLITION ELCTRICAL PLAN X 0
DIM DIMENSION REG REGISTER NEW ELECTRICAL POWER/LIGHTING PLAN, NOTES AND LEGEND W
DIV DIVISION REM REMOVE Ld C)
DN DOWN REQD REQUIRED Z Z
DTR DOWN THRU ROOF REQS REQUIREMENTS — Q
DWG DRAWING RES RESILIENT
DWR DRAWER RET RETURN SCOPE OF WORK z
E EAST RETG RETAINING O
EA EACH REV REVISION O 3:EB EXPANSION BOLT RFG ROOFING l .— CARPET REPLACEMENT THROUGHOUT. Q
EL ELEVATION RFH ROOF HATCH L-
ELEC ELECTRICAL) RFL REFLECT(ED)(IVE)(OR) 2.— INTERIOR PAINT. REPAIR ALL SURFACES AND PREPARE PRIOR TO PAINT. W O
EQ EQUAL RH RIGHT HAND W
EWC ELECTRIC WATER COOLER RM ROOM 3.— EXISTING CHILDREN'S TOILET DEMOLITION. m O_EXG EXISTING RO ROUGH OPENING m
�XH EXHAUST ROW RIGHT OF WAY AREA HAS BEEN RE—DESIGNED TO ACCOMMODATED NEW ADULT UNISEX Q O
EXP EXPOSED RT FIRE RETARDANT TREATED HANDICAPPED TOILET AND STORAGE SPACE. V)
EXT EXTERIOR RTC RATING
FA FIRE ALARM RV ROOF VENT 4.— STRIP EXISTING WINDOWS (3) TYPES, AS EQUIRED. RE—FINISH, RE—CAULK
FD FLOOR DRAIN RWL RAINWATER LEADER TO AVOID WATER INTRUSION. PATCH EXISTING ADJACENT SURFACES
FE FIRE EXTINGUISHER S SOUTH WHICH MAY HAVE BEEN IMPACTED BY NEW WORK OR DAMAGED BY WATER z
FEC FIRE EXTINGUISHER CABINET SC SOLID CORE NEW INTRUSION. PAINT OVER EXISTING WALL PAPER. O
FG FIXED GLASS SCH SCHEDULE
FIN FINISH ED SCN SCREEN
( ) 5.— MODIFY STORAGE ADJACENT TO MULTI—PURPOSE ROOM.
PLG FLASHING SECT SECTION STORAGE SHALL EXPAND INTO THE EXISTING STAFF BREAK ROOM.
FLR FLOOR SF SQUARE FOOT Q
fG FOOTING SHT SHEET
F-
FURR FURRED, FURRING SL SOLID CORE SLNT SEALANT z
GALV GALVANIZED >_ W
SOR STORAGE
GB GRAB BAR SQ SQUARE GENERAL NOTES : a �
GC GENERAL CONTRACTOR SSTL STAINLESS STEEL
GWB GYPSUM WALLBOARD STA STATION a.— CONSTRUCTION TIME FOR THIS CONTRACT IS CALENDAR DAYS, (FROM THE p OJ
GYP GYPSUM STD STANDARD NOTICE TO PROCEED) .H/C HANDICAP(PED) STG SEATING m W
HB HOSE BIBB STL STEEL Z W
HC HOLLOW CORE STOR STORAGE b.— CONTRACTOR SHALL BE RESPONSIBLE FOR ASCERTAINING EXISTING FIELD Q
HM HOLLOW METAL STR STRUCTURAL CONDITIONS PRIOR TO SUBMITTAL OF BID. SUBMITTAL OF BID SHALL BE AN T
HORZ HORIZONTAL SUS SUSPEND(ED) INDICATION THAT THE INTENT OF THE CONTRACT DOCUMENTS WILL BE MET
HR HOUR HT HEIGHT SYM SYMETRICAL WITHIN THE BID AMOUNT. W U z
T TREAD z
HVAC HEATING, VENTILATING, AND AIR CONDITIONING TB TOWEL BAR > Z Q
HWH HOT WATER HEATER TEMP TEMPORARY O
ID INSIDE DIAMETER THK THICKNESS) c.— CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS, TOOLS (�
ILK INTERLOCK THR THRESHOLD AND EQUIPMENT TO PERFORM THE WORK AS SHOWN ON THE CONTRACT i a: z
TKB TACKBOARD DOCUMENTS. L^L �
INT INTERIOR 0 —
LL z
INTM INTERMEDIATE TMPD TEMPERED Z
JT JOINT TPD TOILET PAPER DISPENSER — z
KIT KITCHEN TR TRANSOM d.— CONTRACTOR SHALL NOT DISCONNECT, CUT OR OTHER WISE INTERRUPT J
L LENGTH TR TREAD EXISTING UTILITY SERVICES ,UNLESS NOTED.
LAB LABORATORY TV TELEVISION
LAM LAMINATE(D) TW TOP OF WALL Z
LAV LAVATORY TYP TYPICAL e.— CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER PATCHING AND Q W
LBL LABEL UC UNDERCUT RESTORATION OF ALL WORK AS REQUIRED FOR THE INSTALLATION OF NEW
LH LEFT HAND UGD UNDERGROUND
_ LVR LOUVER UR URINAL ELECTRICAL ,TELEPHONE AND MECHANICAL WORK. CONTRACTOR SHALL � L
M METER(S) VTR VENT THRU ROOF
PATCH TO MATCH ALL ADJACENT SURFACES AFFECTED BY DEMOLITION J
1—
MAS MASONRY VCT VYNIL COMPOSITION TILE Im 0 Q 0 MAX MAXIMUM VERT VERTICAL
MECH MECHANICAL VNB VINYL BASE f.- ALL WORK SHALL BE IN ACCORDANCE TO SOUTH FLORIDA BUILDING CODE '^ LL
MET METAL VWC VINYL WALL COVERING uJ
MFR MANUFACTURER W WEST
MH MAN HOLE W/ WITH g.— CONTRACTOR SHALL FIELD VERIFY EXISTING DIMENSIONS PRIOR TO
MIN MINIMUM W/O WITHOUT COMMENCING THE WORK. Q
MIR MIRROR WC WATER CLOSET W
MISC MISCELLANEOUS WD
MLDG MOLDING WG WIRE WOOD
GLASS h.— CONTRACTOR SHALL EXCERCISE CAUTION DURING DEMOLITION. 0
MO MASONRY OPENING WM WIRE MESH
MRB MARBLE WP WATERPROFFING I.— CONTRACTOR TO COODINATE WORK SCHEDULE AND ACCESS TO THE FACILITY DRAWN
MT MOUNT WPT WORKING POINT
MTD MOUNTED WR WASTE RECEPTACLE UNDER THIS CONTRACT, WITH PROJECT MANAGER AND FACILITY SUPERVISOR. DATE 11-29-00
MTHR METAL THRESHOLD WSCT WAINSCOT FACILITY WILL REMAIN OPERATIONAL DURING CONSTRUCTION. APPROVED A.H./J.c
MTL MATERIAL WWF WELDED WIRE FABRIC
MULL MULLION WWM WELDED WIRE MESH J.— CONTRACTOR TO NOTIFY A/E OF ANY INCONSISTENCIES, AS REQUIRED. REVISIONS
12-15-00
ANID, o!i» A-1
BY
DATE 2dh a-/o 00 OF 00
s