Loading...
01-0275-002 Calculation Procedures A,B,C,D I I Procedure A Winter Infiltration HTM ----------- 1. Winter Infiltration CFM Envelope Evaluation #1 (Substandard/Poor - 289.3 CFM I 2.2 Air Changes per hour x 7875 Cubic ft. x .0167 I I 2. Winter Infiltration Btuh = 7001.7 BTUH I 1.1 x 289.3 CFM x 22 Degrees Winter TD I I 13. Winter Infiltration HTM = 41.9 HTM I 7001.7 Btuh / 167 Sq.Ft of total Glass & Door areas I I Procedure B Summer Infiltration HTM -------------------------- - -----------------I ----------------------- ---- 11. Summer Infiltration CFM Envelope Evaluation #1 (Substandard/Poor)_ 105.2 CFM I .8 Air Changes per hour x 7875 Cubic ft. x .0167 I I 12. Summer Infiltration Btuh = 1620.2 BTUH I 1.1 x 105.2 CFM x 14 Degrees Summer TD I I 13. Summer Infiltration HTM = 9.7 HTM I 1620.2 Btuh / 167 Sq.Ft of total Glass & Door areas I I Procedure C Latent Infiltration -� ------------------------------------ --------- -- 4006.4 BTUH 0.68 x 56 grains difference @ 50 RH x 105.2 CFM _ - -� - I Procedure D Equipment Sizing ' ---------------I 1. Sensible Sizing Load Sensible Ventilation Load = ,'rO.J BTbh- l _ 1.1 x 50 VENT CFM x 14 Degrees Summer TD + 14352.6 BTYH I Sensible Load for Structure = 15112.6 BThh- 1 - Sum of Ventilation & Structure Loads x 1.0 RSN I Rating & Temperature Swing Multiplier (3.0°@ 95°) = 15322 ,6 BTbh i Equipment Sizing Load - Sensible 2. Latent Sizing Load I i I Latent Ventilation Load = 1904.0 BTUH I 0.68 x 50 VENT CFM x 56 differance + 920.0 BTUH I Internal Loads = 230 Btuh x 4 people + 4006.0 BTUH I Infiltration Load from Procedure C = 6830.4 BTUH I Equipment Sizing Load - Latent I