Loading...
01-0144-018 .SAMUEL C. MATMEWS '.ARCHITECT GENERAL DEMOLITION NOTES : AR 0009733 1. TH15 PLAN IS INTENDED TO SHOW THE OVERALL SCOPE OF DEMOLITION WORK TO BE DONE, 5546 S.W. 115 PLACE IT DOES NOT SHOW ALL OF THE SPECIFIC MINOR ITEMS EXISTING IN THE SPACE THAT WILL MIAMI, FLORIDA (305) 595.3149 BE REQUIRED TO BE REMOVED TO COMPLETE THE WORK 2. THE CONTRACTOR SHALL VISIT THE JOB SITE AND'PERFORM A WALKTHRU WITH THE OWNER TO IDENTIFY THE SPECIFIC ITEMS NOT SHOWN ON THIS PLAN THAT WILL BE REMOVED AND COORDINATE WHICH ITEMS WILL BE DISPOSED OF AND WHICH WILL BE GIVEN TO THE OWNER FOR HIS STORAGE. 3. THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, TRASH REMOVAL, STORAGE, ETC. WITH THE BUILDING OUTER / MANAGEMENT CO. DATE: 4. THE OWNER SHALL SUPPLY THE CONTRACTOR WITH AN ASBESTOS SURVEY IDENTIFYING 01-20-01 ANY ITEMS THAT MAY HAVE ASBESTOS. THE CONTRACTOR SHALL FOLLOW THE SURVEY AND ANY ITEMS HAVING ASBESTOS SHALL BE REMOVED OR CONTAINED AS REQUIRED REVISIONS: BY A CERTIFIED ASBESTOS ABATEMENT CONTRACTOR STAIR FLE TO 5. ALL WORK SHALL BE CUT, PATCHED OR MODIFIED AS REQUIRED AND REFINISHED AS WELL AS REFINISHING EX15TING ITEMS REMAINING TO ACHIEVE A CONS15TANT FIN15H AND A SATISFACTORY COMPLETED CONDITION. ro. THE CONTRACTOR SHALL PROVIDE ANY SAFETY FEATURES OR METHODS DURING DEMOLITION AS REQUIRED BY APPLICABLE CODES, O.S.HA. OR SPECIFICATIONS. -I. CONTRACTOR SHALL VERIFY ALL PLUMBING, MECHANICAL AND ELECTRICAL ITEMS ❑ TO BE REMOVED OR RELOCATED./ 6. THE CONTRACTOR SHALL VERIFY ALL CEILING AND CHASES TO ASSURE PROPER IDENTIFICATION OF EXISTING ITEMS TO REMAIN OR BE REUSED. REPORT ANY DISCREPANCIES FOUND TO ARCHITECT AND OWNER IN WRITING. LEVATOR ACHINE S. ALL SURFACES DAMAGED BY DEMOLITION SHALL BE REPAIRED AND.REFINISHED OM TO MATCH ADJACENT SURFACES AND AS PER FINISH SCHEDULE. 10. EXISTING CONCRETE SLAB SHALL BE PREPARED BY GRINDING AND LEVELING WAITING ROOM WITH GYPCRETE 2,000, AS PER MANUFACTURES SPECIFICATIONS. (WHERE REQUIRED) FINISHED WORK SHALL BE SMOOTH AND LEVEL WITH EXISTING SLAB. 11, ALL EXISTING ITEMS IN THE CEILING SPACE NOT BEING USED OR NOT TO BE REUSED SHALL BE REMOVED. (COORDINATE WITH 4PCHITECT/ENGINEER/OUNER). 12. REMOVE ALL EXISTING CABINETS, FURNITURE AND FIXTURES. COORDINATE WITH OWNER THE DISPOSAL OR STORAGE OF THESE ITEMS. ENTRY 13. REMOVE ALL EXISTING FLOOR CARPET, TILE, ETC. WHERE REQUIRED AND PREPARE SURFACE TO RECEIVE NEW FINISHES PER FIN15H SCHEDULE AND/OR INTERIOR DESIGNERS SPECIFICATIONS. OBSERVE ANY ITEMS ADDRESSED BY THE ASBESTOS SURVEY AS NOTED ABOVE. RECEPTION 14. PROVIDE CONTINUOUS DUST CONTROL DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION. WAITING LOCATION 4 COMPLY WITH THE PROPER METHOD OF ABATEMENT . OF AREA TO BE 18. CONTRACTOR 15 TO VERIFY WITH OWNER AND INDENTIFY ALL EXISTING PIPES, ) ISCHARGE REMODELED LOCATION LOCATION CONDUITS, ETC. FROM OTHER 5UITE5 PRIOR TO DEMOLITION. OF AREA OF AREA BE MARK ALL PIPES, CONDUITS, ETC, NOT TO BE DEMOLISHED RE REMOO DELED r REMODELED p W WITH RED PAINT. INFORM ALL SUB CONTRACTORS. II z a loo. REFER TO MECHANICAL / ELECTRICAL / PLUMBING 4 FIRE.'PROTECTION 01.1,135. CD —— STAIR 0 � l W FOR ADDITIONAL DEMOLITION NOTES 4 REQUIREMENT . OFFICE ( a ❑ j � V d II UJORK Li 11. CAREFULLY REMOVE AND STORE EXISTING DOORS TO BE REUSED. COORDINATE W/ OWNER ! ii FILES ii ' ' NURSE TOILE TOILE ❑ I ©� �i �� ni�u ��� 0 it tt u CONTROL EXAM STAFF/ AND ROLOGY I —-'I I l u_. I I I Z 18. CAREFULLY REMOVE EXISTING CEILINGS SUCH THAT EXISTING CEILING MOUNTED ITEMS, —_J n�q ❑ VESTIBULE 11 w O m -- EDUCATION LAB 11 II Ir- SMOKE DETECTORS, FIRE HORNS, STROBES, EXIT LIGHT, ETC. THAT ARE TO BE REUSED ARE ——— 1r---__--_---i I, II I 1 (7-+' a NOT DAMAMGED. ANY ITEMS DAMAGED SHALL BE REPLACED WITH A NEW ITEM EQUAL TO R��\ , r it STORAGE 11 M' ROOMII 5T0 �� F EXAM i 11 I I I o THE EXISTING AT NO ADDITIONAL COSTS TO THE OWNER CONTRACTOR SHALL COORDINATE ( tl L --- IL________________J� _��_ ____ - ( O L ) o 19. CONTRACTOR SHALL NOTIFY AND COORDINATE WITH BLDG. OWNER MANAGEMENT CO. AND L—————— ADJACENT TENANTS ALL DEMOLITION THAT WILL HAVE AN EFFECT ON OTHER SPACES, %�/�f ❑ Q — �i ( 'T � �L L T J —J 7r ,1111 ELECTRICAL OFFIt OFFICE EXAM OFFICE J- -� I.vF. MEDICAL ❑ EXAM fEXAM NUR SE PHD PROCEDAE '� ROOM ) PREPARATIO. COORDINATO ROOM ROOM ' L 'y MECHANICAL rM DEMOLITION PLAN NOTES CD REMOVE EXISTING NON-BEARING PARTITION (OR FURRED OUT WALL)FROM FLOOR TO SLAB ABOVE, INCLUDING ALL ITEMS ATTACHED TO SUBJECT WALLS. COORDINATE WITH OWNER.DISPOSAL OR STORAGE OF ANY ITEMS BEING REMOVED FROM EXISTING WALLS. REPAIR AND FINISH ALL SURFACE5 FLUSH AND SMOOTH. RELOCATE OR CAP ANY ELECTRICAL OR PLUMBING FOUND IN WALL AS REQUIRED . CZ) CUT OPENING FOR DOOR, WINDOW, PASS-THRU OR FINISHED OPENING. (AS SCHEDULED) r t FLAN (SEE ALSO NOTE 01 FOR UTILITIES 4 FINISHING NOTES) DEMOLITION p EXISTING PARTITIONS OR STRUCTURE ELEMENTS SCHEDULED TO REMAIN SHALL BE REPAIRED AS REQUIRED DEMOLITION PLAN LEGEND AND FINIS RR H SMOOTH AND FLUSH. ALL SURFACES PREPARED AS REQUIRED TO ACCEPT NEW FINISHES. 1 EXISTING PARTITIONS, DOORS, ETC. 0 0 Q REMOVE EXISTING DOORS 4 FRAMES. (ALSO SEE NOTE Of REGARDING UTILITIES 4 PATCHING 4 FINISHING) � a TO REMAIN PARTITIONS, DOOR5, ETC.TO BE REMOvED +� A CD REMOVE EXISTING FLOOR FINISH 4 PREPARE SLAB SMOOTH 4 LEVELED TO RECEIVE NEW CARPET OR TILE . REMOVE EXISTING PIPING STUBS. CAP FLUSH WITH FLOOR ENSUR EADEQUATE FIRESAFING OF ALL FLOOR EXISTING EXTERIOR WALLS a WINDOWS ' PENETRATIONS IN THE AREA OF THE WORK . PATCH ALL CRACKS, HOLES, AND BLEMISHES. REFER TO W DEMOLITION GEN. NOTES AND SPECIFICATIONS. EXISTING STRUCTURE TO REMAIN . ® RELOCATE OR CAP ANY ELECTRICAL OR PLUMBING FOUND IN WALL AS REQUIRED (REFER TO ELECT, MECH. 4 PLUMB. DRAWINGS FOR ADDITIONAL REQUIREMENTS.) EXISTING PARTITIONS SCHEDULED TO REMAIN SHALL BE REPAIRED AS REQUIRED AND FINISHED SMOOTH AND FLUSH. ALL SURFACES PREPARED AS REQUIRED TO ACCEPT NEW FINISHES. r� p REMOVE ACOUSTICAL TILE CEILING,GRID/HANGERS, AIR CONDITION S/A 4 R/A DIFFUSERS, DUCTS, VA.V. BOXES 4 ASSOCIATED ELECTRICALWIRING4 CONDUIT, TELEPHONE 4 DATA WIRING, COORDINATE WITH MECHANICAL, ELECTRICAL, 4 FIRE PROTECTION DRAWINGS. ® REMOVE EXISTING WALL MOUNTED LAVATORY 4 PREPARE EXISTING PLUMBING TO ACCEPT NEW CABINET MOUNTED LAVATORY IN NEW POSITION AS SHOWN ON FLOOR PLANS. (COORDINATE RELOCATION, DISPOSAL OR STORAGE WITH OWNER) RELOCATE OR CAP ANY ELECTRICAL OR PLUMING FOUND IN WALL AS REQUIRED . PROJECT NO. (REFER TO ELECT, MECH. 4 PLUMB. DRAWINGS FOR ADDITIONAL REQUIREMENTS.) 205048 EXISTING PARTITIONS SCHEDULED TO REMAIN SHALL BE REPAIRED AS REQUIRED AND FINISHED SMOOTH AND FLUSH. ALL SURFACES PREPARED AS REQUIRED TO ACCEPT NEW FINISHES. SHEET A- 2 OF