01-0057-013 1
. 4
1
Revisions:
0
0
0
I
z
0_
CD ® Wqrm
PLUMBING SYMBOLS ® � M
GENERAL NOTES PLUMBING FIXTURE SCHEDULE W co
I
SYMBOLS ABBREVIATION DESCRIPTION
® co 0
FIXTURE ITEM WASTE TRAP VENT CW HW REMARKS
1- ALL WORK UNDER THIS CONTRACT SHALL COMPLY WITH THE �— W WASTE OR SOIL ABOVE GRADE 0.
LATEST EDITION OF THE S.F.B.C.- 1994 ALL APPLICABLE LOCAL STAINLESS STEEL
- ' 59A-3-JULY 1997 - 11/" 11 1 2" 1 2" SINGLE COMPARTMENT ---- —
ORDINANCES NFPA 99 1993 AND FAC 59 JU SINK P 1 2 /1 / / W DOMESTIC AND WATER RETURN O � J
f � � � V � LL
-- -- - V VENT
2- CONTRACTOR SHALL VISIT THE JOB SITE AND THOROUGHLY STAINLESS STEEL
FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS. SINK P-2 11/2 11� 1/ 1/2" 1/2" DOUBLE COMPARTMENT — - CW DOMESTIC COLD WATER O N
3- ALL MATERIALS SHALL BE NEW AND OF AMERICAN
--- — HW DOMESTIC HOT WATER (0 .
MANUFACTURE. CLINICAL SINK O
CLINICAL SINK P-3 4" INT. 3" 1 1 FLOOR MOUNTED. —CD CD CONDENSATE DRAIN
4- ALL WORK SHALL BE PERFORMED IN A FIRST CLASS WORKMANLIKE �— FCO FLOOR CLEANOUT O J
MANNER. THE COMPLETE SYSTEM SHALL BE FULLY OPERATIVE. ♦� LL
- LAB AND WALLS SHALL BE A D4 SOV SHUT OFF VALVE �♦
5 ALL CORING AND PATCHING OF THE S
PART OF THIS CONTRACT.
FD FLOOR DRAIN
6- VERIFY LOCATION, SIZE AND ELEVATION OF ALL EXISTING
UTILITIES PRIOR TO ORDERING MATERIALS. ADVISE ENGINEER OF P.O.C. POINT OF CONNECTION
ANY DISCREPANCIES. I
J 6
7- ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID I VTR VENT THRU ROOF
INTERFERENCE WITH THE PROGRESS OF CONSTRUCTION.
�{ WCO WALL CLEAN OUT
4:
I 8- DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE DRAWINGS FOR THE
EXACT LOCATION OF FIXTURES AND PIPING.
a
9- ALL PERMITS, FEES, INSPECTIONS AND TESTS SHALL BE THE ALL SYMBOLS ARE NOT NECESSARILY USED IN THIS PROJECT. , v,
RESPONSIBILITY OF PLUMBING CONTRACTOR. _
10- STOPS SHALL BE PROVIDED AT ALL PLUMBING FIXTURES.
11- PROVIDE AIR CHAMBER 18" HIGH, NEXT SIZE LARGER AT ALL
y
as
FIXTURES. 4.
0
12- PROVIDE DIELECTRIC UNIONS WHEREVER DISSIMILAR METALS ARE
JOINED. Q
C
13- SOIL, WASTE AND VENT PIPING SHALL BE CAST IRON "NO-HUB".
WASTE ARM PIPING TO BE COPPER TYPE DWV.
14- ESCUTCHEONS SHALL BE CHROME PLATED BRASS WITH LOCKING
SCREWS WHERE PIPES PASS THROUGH FINISHED WALLS.
15- . PIPE SLEEVES SHALL BE PROVIDED FOR ALL PIPES-THROUGH
WALLS AND FLOOR SLABS. SLEEVES SHALL BE GALVANIZED SHEET
METAL, GALVANIZED STEEL PIPE OR CAST IRON PIPE.
16- DOMESTIC WATER PIPING SHALL BE TYPE "L" COPPER. O (n m CIA
17- SANITARY DRAIN PIPINGSMOLLER THAN 2" SHALL BE SLOPED A
SHALL BE SLOPED'A MIN OF SANITARY 8��IN LINES 3" AND LARGER �+
MINIMUM
d o �
18- COMPLETE WATER PIPING SYSTEM SHALL BE PRESSURE TESTED BY a
CAPPING OR PLUGGING, FILLING SYSTEM WITH WATER AND a
APPLYING HYDROSTATIC PRESSURE OF 125 PSI FOR 2 HOURS. s
SOIL WASTE VENT PIPING SHALL BE TESTED WITH A MINIMUM °
OF 20 TDH OF WATER.
a
19- HOT WATER TEMPERATURE SHALL BE 120 DEGREES MAXIMUM.
r�. q
■® 0 Y
20- THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING d v
FIXTURES HAVE BEEN PROVIDED, INCLUDING THE FOLLOWING: 'j
a: SINKS SHALL BE AT LEAST 4" FROM ANY SIDE a
�
WALL. r � o LL
21- SUBMIT SHOP DRAWINGS OF ALL MATERIALS AND EQUIPMENT FOR
APPROVAL PRIOR TO ORDERING MATERIALS. 3
� z
22- THESE DRAWINGS SHALL BE REVIEWED AND APPROVED BY AHCA,
ANY CHANGES OR AHCA RECOMMENDATIONS SHALL BE INCLUDED
ON THESE DRAWINGS OR ISSUED AS AN ADDENDUM TO THIS O g
CONTRACT.
23- PROVIDE MED-GAS CERTIFICATION ACCEPTABLE BY ENGINEER OF
RECORD AT THE FINAL AHCA SURVEY.
i
- _ W
J
D
In
W
0 cl)
v/ z
.. O
Q �
I
W
0
W W
j OC
m
J �
O
CD
. m
i
CC
U
C )
O
O
N
m
m
M
O
0
DRAWN: J.G / Y.G
i m
I
a CHECKED: J.0 / R.R
CD
ID C
DATE: 6/30/2000
Q,
I
SCALE: AS SHOWN
I o
THE RC GROUP
M cu
Consulting Engineers
CD Sheet No.
cn
'rt •e r Suite x215ndail Drive
cr)cn
•�`. �'••``� 3 Miami, 275-8083
ELECT. g
a' '•v ELECT. ENG.: JORGE L CRUZ REG. 51901
= =
.� _ �U 5•; _
H. ENG.: ROBERT W. ROSNER REG. 38005
L • v
R
'wz RC# 9932
E JOB #1: 9902&