Loading...
01-0057-013 1 . 4 1 Revisions: 0 0 0 I z 0_ CD ® Wqrm PLUMBING SYMBOLS ® � M GENERAL NOTES PLUMBING FIXTURE SCHEDULE W co I SYMBOLS ABBREVIATION DESCRIPTION ® co 0 FIXTURE ITEM WASTE TRAP VENT CW HW REMARKS 1- ALL WORK UNDER THIS CONTRACT SHALL COMPLY WITH THE �— W WASTE OR SOIL ABOVE GRADE 0. LATEST EDITION OF THE S.F.B.C.- 1994 ALL APPLICABLE LOCAL STAINLESS STEEL - ' 59A-3-JULY 1997 - 11/" 11 1 2" 1 2" SINGLE COMPARTMENT ---- — ORDINANCES NFPA 99 1993 AND FAC 59 JU SINK P 1 2 /1 / / W DOMESTIC AND WATER RETURN O � J f � � � V � LL -- -- - V VENT 2- CONTRACTOR SHALL VISIT THE JOB SITE AND THOROUGHLY STAINLESS STEEL FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS. SINK P-2 11/2 11� 1/ 1/2" 1/2" DOUBLE COMPARTMENT — - CW DOMESTIC COLD WATER O N 3- ALL MATERIALS SHALL BE NEW AND OF AMERICAN --- — HW DOMESTIC HOT WATER (0 . MANUFACTURE. CLINICAL SINK O CLINICAL SINK P-3 4" INT. 3" 1 1 FLOOR MOUNTED. —CD CD CONDENSATE DRAIN 4- ALL WORK SHALL BE PERFORMED IN A FIRST CLASS WORKMANLIKE �— FCO FLOOR CLEANOUT O J MANNER. THE COMPLETE SYSTEM SHALL BE FULLY OPERATIVE. ♦� LL - LAB AND WALLS SHALL BE A D4 SOV SHUT OFF VALVE �♦ 5 ALL CORING AND PATCHING OF THE S PART OF THIS CONTRACT. FD FLOOR DRAIN 6- VERIFY LOCATION, SIZE AND ELEVATION OF ALL EXISTING UTILITIES PRIOR TO ORDERING MATERIALS. ADVISE ENGINEER OF P.O.C. POINT OF CONNECTION ANY DISCREPANCIES. I J 6 7- ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID I VTR VENT THRU ROOF INTERFERENCE WITH THE PROGRESS OF CONSTRUCTION. �{ WCO WALL CLEAN OUT 4: I 8- DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE DRAWINGS FOR THE EXACT LOCATION OF FIXTURES AND PIPING. a 9- ALL PERMITS, FEES, INSPECTIONS AND TESTS SHALL BE THE ALL SYMBOLS ARE NOT NECESSARILY USED IN THIS PROJECT. , v, RESPONSIBILITY OF PLUMBING CONTRACTOR. _ 10- STOPS SHALL BE PROVIDED AT ALL PLUMBING FIXTURES. 11- PROVIDE AIR CHAMBER 18" HIGH, NEXT SIZE LARGER AT ALL y as FIXTURES. 4. 0 12- PROVIDE DIELECTRIC UNIONS WHEREVER DISSIMILAR METALS ARE JOINED. Q C 13- SOIL, WASTE AND VENT PIPING SHALL BE CAST IRON "NO-HUB". WASTE ARM PIPING TO BE COPPER TYPE DWV. 14- ESCUTCHEONS SHALL BE CHROME PLATED BRASS WITH LOCKING SCREWS WHERE PIPES PASS THROUGH FINISHED WALLS. 15- . PIPE SLEEVES SHALL BE PROVIDED FOR ALL PIPES-THROUGH WALLS AND FLOOR SLABS. SLEEVES SHALL BE GALVANIZED SHEET METAL, GALVANIZED STEEL PIPE OR CAST IRON PIPE. 16- DOMESTIC WATER PIPING SHALL BE TYPE "L" COPPER. O (n m CIA 17- SANITARY DRAIN PIPINGSMOLLER THAN 2" SHALL BE SLOPED A SHALL BE SLOPED'A MIN OF SANITARY 8��IN LINES 3" AND LARGER �+ MINIMUM d o � 18- COMPLETE WATER PIPING SYSTEM SHALL BE PRESSURE TESTED BY a CAPPING OR PLUGGING, FILLING SYSTEM WITH WATER AND a APPLYING HYDROSTATIC PRESSURE OF 125 PSI FOR 2 HOURS. s SOIL WASTE VENT PIPING SHALL BE TESTED WITH A MINIMUM ° OF 20 TDH OF WATER. a 19- HOT WATER TEMPERATURE SHALL BE 120 DEGREES MAXIMUM. r�. q ■® 0 Y 20- THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING d v FIXTURES HAVE BEEN PROVIDED, INCLUDING THE FOLLOWING: 'j a: SINKS SHALL BE AT LEAST 4" FROM ANY SIDE a � WALL. r � o LL 21- SUBMIT SHOP DRAWINGS OF ALL MATERIALS AND EQUIPMENT FOR APPROVAL PRIOR TO ORDERING MATERIALS. 3 � z 22- THESE DRAWINGS SHALL BE REVIEWED AND APPROVED BY AHCA, ANY CHANGES OR AHCA RECOMMENDATIONS SHALL BE INCLUDED ON THESE DRAWINGS OR ISSUED AS AN ADDENDUM TO THIS O g CONTRACT. 23- PROVIDE MED-GAS CERTIFICATION ACCEPTABLE BY ENGINEER OF RECORD AT THE FINAL AHCA SURVEY. i - _ W J D In W 0 cl) v/ z .. O Q � I W 0 W W j OC m J � O CD . m i CC U C ) O O N m m M O 0 DRAWN: J.G / Y.G i m I a CHECKED: J.0 / R.R CD ID C DATE: 6/30/2000 Q, I SCALE: AS SHOWN I o THE RC GROUP M cu Consulting Engineers CD Sheet No. cn 'rt •e r Suite x215ndail Drive cr)cn •�`. �'••``� 3 Miami, 275-8083 ELECT. g a' '•v ELECT. ENG.: JORGE L CRUZ REG. 51901 = = .� _ �U 5•; _ H. ENG.: ROBERT W. ROSNER REG. 38005 L • v R 'wz RC# 9932 E JOB #1: 9902&