Loading...
00-0176-007 A EXISTING PANEL #D Section 1 Revisions: Phase: 3 -Y Voltage: 120/208v Panel amps: 400 amps. Make: Existing CEILING BRACING & SUPPORT BACK-UP BREAKER 80AMP 30 ` _ 4#!� THWN + _��>i 'iHWN IN "_-;1/4°'C. 14" ABOVE CEILING AS PER SFBC Art 4904.6 IN NEMA 3 ENCLOSURE Spaces: 42 No of ckts: 42 Main Break: Type: ML PROVIDE WIND LOAD COMPLIANCE. - ELECTRICAL SPECIRCATIONS SPEC:GF=Ground Fault Interrupter NC=Non-concurrent load Rec.=Receptacle Ckt Lts=Lighting Ckt ST=Breaker with shunt trip IS=Isolated ground T=Via Timer LV=Via low voltage transformer C--Via Contactor - - -- -- - SW="On-Off"Switching Du Rated Breaker,as er NEC 240-83(d), * =Existin Circuits NFMA 3 PART 1- GENERAL NEMA 3 - _ _ - _ A.- Overall Installation: The installation shall comply with the National CT USE SPEC V BKR WIR CND VA No USE SPEC v BKR wm CND VA WP u_` WP -�t——___ YO FUTURE PORTABLE GENERATOR HOOK-UP. Electrical Code (NEC), the South Florida Building Code (SFBC), and No AMP AWG SIZE No AMP AWG slzE 12"X12" Box an other applicable Federal, State and Local codes. (inch) A B C (inch) A 13 C ROOF Y PP 1 *Existing Ckt Suite 400 120 20 12 12 720 ° ° 2 ExlstingCkt3uite400 120 20 12 12 720 B.- Conductor Calculations: Conductor calculations are based on 75 'C. 3 *Existing Ckt Suite 400 120 20 12 12 X, ° 720 ° - 4 Existing Ckt Suite 400 120 20 12 12 77T7' 720 ° _ 5 *Existing Ckt Suite 400 120 20 12 12 `, 720 6 'Existing Ckt Suite 400 120 20 12 12 720 1. General: The General and Special Conditions and Requirements of U 7 *Existing Ckt Suite 400 120 20 12 12 720 °. `` 8 'Existing CM Suite 400 120 20 12 12 1 720 the Contract and Specifications as well as plans and specifications Q 9 *Existing Ckt Suite 400 120 20 12 12 ° .. 800 °:,' 10 *Existing 1zo 20 rz 12 a 600 °, of other disciplines and trades shall be a part of the work hereby m 11 *Existing Ckt Suite 400 120 20 12 12 °. ° 600 12 ExislingCkt 120 20 12 12 ° 900 specified. These specifications and accompanying plans are intended „ 13 *Existing Ckt Suite 400 120 20 12 12 soo ° 1a *Existing 120 20 1z 12 200 ° to provide for the complete furnishing and installation of the elec- — LO 15 *Existing Ckt 120 20 12 12 °: 700 ° . 16 Existing Ckt F2_0 20 12 12 ° 400 17 *Existing Ckt 120 20 12 12 °; 550 1s *Existing 120 20 12 12 600 triCal systems. To provide means to furnish and install. Q 4#4 THWN + 1#8 THWN(GND) IN 1-1/4"C. Q 19 -Existing Ckt suite 400 120 20 12 12 sso ° °' 20 Existing Hall Light 120 20 12 12 600 .. :4 ° 2. Compliance: Workmanship, materials and installation shall be in strict 21 ExistingCkt Suite 400 120 20 12 12 °' 500 °: r 22 *Existing 120 20 12 12 400 °` accordance with the applicable edition of the NEC,NFPA,NEMA,ASTM, 23 Existing Ckt Suite 400 120 20 12 12 °' ° aoo 24 Existing Ckt Suite 400 120 20 12 12 ° ° soo OSHA, HRS health agencies, and other applicable national, state, and _ Ln 25 *Existing 120 20 12 12 soo °',.' 26 ExistingCktSuite400 120 20 12 12 600 '° local codes and pertaining regulations established by the ruling 27 *Existing Ckt Suite 410 120 20 12 12 ° 450 ° " 28 ExistingaktSuite400 120 20 12 12 ° 500 ° NEW EXISTING EXISTING 29 *Existing Ckt Suite 410 120 20 12 12 °.: 350 30 •ExistingCkt 120 20 12 12 ° aoo NEW authority having jurisdiction. SUBPANEL PANEL D PANEL D Contractors shall also meet the requirements of other standards O ° °. ,.° . , °, r , 31 'ExistingCktSuite400 120 20 12 12 500 32 ExistingCkt 120 20 12 12 400 BACK-UP D3 SECTION 2 SECTION 1 q ° ° a; NOTE: where such requirements are more strict than those standards z 33 *Existing Ckt 120 20 12 12 60 34 *Existing 120 20 12 12 200 SUBPANEL 35 *Existing Ckt 120 20 12 12 °. 200 36 *Existing 120 20 12 12 ° 200 cited above. 1-,MANUAL TRANSFER SWITCH TO BE OF THE THREE 120/240v 120/240v 120/240v 37 *Existing Ckt 120 20 12 12 200 ° '' 38 *ExistingCktSuite400 120 20 12 12 sso " 120/240v 3. Workmanship: All work shall be performed by contractors licensed — 39 *Existing cktSuite 400 120 20 12 12 °'': 600 °.:°: 40 *Existing Ckt Suite 400 120 20 12 12 600 °. POLES TYPE. GENERATOR INSTALLATION IS NOT A SE- ZOOA 400 A 400 A 200 A MANUAL in their respective discipline. Work shall be done in a first class 41 ExistingCkt Suite 400 120 20 12 12 °. ° 600 42 "ExistingCkt Suite 400 120 20 12 12 a °.: 450 PARATELY DERIVED SYSTEM. GENERATOR NEUTRAL TRANSFER 125 80 manner, fully operative, and to the acceptance of the Architect and sub total toad 3690 3830 3420 sub-total Load 3790 3420 3770 CONDUCTOR SHALL BE CONNECTED SOLIDLY TO NORMAL SWITCH the Engineers. Contractor shall provide for all necessary labor and Total 0Load 10940 Total 0Load 10980 NEUTRAL CONDUCTOR AT ATS. 125A 30 material required for the completion of the work including but not limited to related work such as connection of existing systems, exca- Panel Va= 10940+ 10980=21920 va 120/208V vations and back filling. Panel D2 va=73031 va WITH SOLID GROUND ELECTRICAL ROOM 25%continous lighting load in panels`D1' and`D2'= 2745 va SEE NOTE:1 4 TH FLOOR 4. Materials: Contractor shall provide all new materials of American ma- 25%larger motor= 1440 va nufacture, bearing the Underwriters Laboratory (UL) label as oppli- U� Total VA= (99136)/(208 x 43)= 275 Amps cable. Materials shall be new, suitable for the application and above standard quality normally used for the purpose as called for on plans, 4#4 THHN + 1#8 THHN(GND) IN 1-1/4"C. EXISTING Supplemental the n al ma e i the products drawings neat or specifications,o comply CV 4#1 THHN + 1#6 THHN(GND) IN 1-1/2"C. 4#350 THHN + 1#4 THHN IN 2-1/2 C. 9 / but EXISTING PANEL #D (Section 2) not noted or specified on these sections, shall be provided by the [� Contractor as required for the completion of the work at no additio- Phase: 3 -Y Voltage: 120/208v Panel amps: 400 amps. Make: Existing EXISTING nal cost to the Owner. Contractor shall be responsible for provisions and coordination of delivery of materials, W Q Spaces: 36 No of ckts: 36 Main Break: Type: ML 4#350 THHN + 1#4 THHN IN 2-1/2"C. Equipment marred during shipment or installation shall be touched up Z � and refinished to factory finish, replaced where not acceptable. SPEC:GF=Ground Fault Interrupter NO=Non-concurrent load Rec.Receptacle Ckt Lts=Lighting Ckt ST=Breaker with shunt trip IS=Isolated ground T=Via Timer LV=Via low voltage transformer C=Via Contactor 5.- Permits and Insurance: Contractor shall secure and pay for all 0 SW="On-Off"Switching Du Rated Breaker,as per NEC 240-83(d), * =E)dstin Circuits permits, fees, taxes, inspections, tests, fines and other items as J CT USE SPEC V BKR WIR CND VA CT USE SPEC V BKR WIR CND VA required for the installation of the complete electrical systems as L� No AMP AWG SIZE No AMP AWG SIZE EXISTING outlined herein and shown on plans. ( ch) A C (inch) A C 'MDP° Contractor shall provide all required insurance for protection against GROUND FLOOR 1 'Existing Ckt Suite 410 120 20 12 12 450 2 Refrigerator 120 20 12 12 800 ° public liability and property damage for the duration of the work, LOAD CALCULATION MAIN ELECTRICAL ROOM 3 ExistingCkt Suite 410 120 20 12 12 ° 500 ° .: 4 GenRec.Suite 420 120 20 12 12 ° 1116 °:. 6.- Existing conditions: Before bidding, the contractor shall visit the job 5 'Existing Ckt Suite 410 120 20 12 12 ;"< n 650 6 Vacum Pump 120 20 12 12 ° 696 30 site and ascertain all existing conditions which will affect his work, 7 'ExistingCktsurre410 120 20 12 12 600 8 Gen Light Suite 405 120 20 12 12 1250 EXISTING LOAD 37398 VA Failure to do so will not be accepted as a reason for requesting (7) 9 *Existing Ckt Suite 410 120 20 12 12 ° 600 a 10 'Existing Heater 208 20 12 12 ° 1200 11 *ExistingCktSuite410 120 20 12 12 ° 600 12 U U °. 1200 NEW LOAD 61738 VA extra pay where the existing conditions result in extra materials or Any existing conditions found by the Contractor which will adversely 13 •Existing Ckt Suite 410 120 20 12 12 550 ° °"r 14 Gen Light Suite 405 120 20 12 12 1300 ° ° r� 15 'Existing Ckt Suite 410 120 20 12 12 ° Soo °.. 16 Exit Lights Suite405r420 120 20 12 12 ° 6o affect the work shall be immediately be brought to the attention of M TOTAL LOAD 99136 VA the Architect/Engineer. Correction of any defects shall be completely O 17 'Existing Ckt Suite 410 120 20 12 12 °< ° 400 18 Gen Rec.Suite 405 120 20 12 12 720 without additional charge and shall include replacements Or repair Of O 19 'Existing CM Suite 410 120 20 12 12 450 ° °'- 20 Gen Rec.Suite 405 I S 120 20 12 12 180 ° °-- 21 -Existing 120 20 12 12 ° 750 ° 22 Gen Rec. GFI 120 20 12 12 ° 360 ai. any other phase of the installation which may have been damaged thereby, 3 23 •ExistirgCktSuite410 120 20 12 12 °y °, „ 400 24 Gen Rec.Suite 420 GFI 120 20 12 12 ° ° 540 TOTAL CURRENT : 275 AMP 7.- Plans: Drawings are basically diagrams intended to depict approximately _J LiJ 25 'Existing Ckt 120 20 12 12 400 ° " 26 Space 0 o a,, 27 Gen Light Suite 420 120 20 12 12 °` 526 °" 28 Space ° 0 ° -` equipment locations and arrangements, not to show every minor detail. Z z Plans shall not be scaled to determine exact location and dimensions. 29 Gen Light Suite 420 120 20 12 12 °; 1030 30 ° ° 0 Y 31 Sub Panel'D3' 208 125 1 1-12 10928 °'. °.' 32 Sub Panel'BU' 208 80 4 1-1/4 7473 ° °i 8.- Interference: The Contractor shall coordinate his work with other U 33 U U 10928 °, 34 u u �a73 °- ELECTRICAL RISER. trades so that interference with existing conditions, conduits, piping, � N 35 U U °` 777 10928 36 U U ° ° ; 7473 equipment, architectural and structural members be avoided. Sub-total 0 Load 13378 13804 14008 Sub-total 0 Load 11003 10209 10629 � N m Total 0Load 41190 Total 0Load 31841 9.- Substitutions: Products and materials called out by trade name and/or � � Panel Va= 41190+31841=73031 va catalog numbers establish a standard of quality, appearance, perfor- i--i w Total VA= (73031)/(208 x 43)= 203 Amps mance and dimension. Contractors shall base his proposal on those items as they shall be considered as a standard basis of bidding. LOAD SURVEY OFFICE#400 Requests for substitution shall be submitted in writing to the Archi- tect/Engineer, demonstrating that product is of comparable and basic AT TT design, construction, standards and warranties, dimensions to fit wi- NEW PANEL #B V thout change, and does not cause extra work to other trades. Contractor shall be responsible for providing equality of substitution: Phase: 30-Y Voltage: 120/208v Panel amps: 200 amps. Make:ITE-G4242ML3200CU IR EQUIPMENTS QTY VA : '` " Architect/Engineer will, under no circumstances, be required to prove Q such item is or is not of equal quality to the specified item. Archi- 0 Spaces: 42 No of ckts: 42 Main Break: none Type: ML 1 General Receptacle 31 5580 tect/Engineer expenses incurred due to Contractors requested revi- _ SPEC:GF=Ground Fault Interrupter NO--Non-concurrent load Rec.=Receptacle Ckt Lts=Lighting Ckt ST=Breaker with shunt trip 2 General Light Fluorescent 31 2970 sions or substitutions shall be paid by the Contractor. � IS=Isolated ground T=Via Timer LV=Via low voltage transformer C=Via Contactor 3 General Light Hi-Hat 14 1050 10.-Record Drawings: Maintain a complete set of prints for indicating SW="On-off"Switching Duty Rated Breaker,as per NEC 240-83 d 4 Computers 3 1500 all changes. Use colored pens to mark changes at the time of exe- J CT USE SPEC V BKR WrR CND VA CT USE SPEC v Blot WIR CND VA 5 Co Machine 2 1400 cution and deliver the set to the Architect/Engineer upon completion, No AMP AWG SIZE No AMP AWG SIZE 6 Fax Machine 2 400 " (inch) A B C (inch) A B C Contractor shall stamp As Built" on prints and plans, date and sign ^ 7 Refrigerator 1 800 in ink. _ 1 Gen.Lighting 4051420 120 20 12 12 495 ° ° " 2 Block Heater 120 20 12 12 250 ° ° 8 Microwave - 0 3 BiockHeater 120 20 12 12 ° 250 '? 4 Exaust Hood 120 20 12 12 ° 300 9 Coffee Maker 1 600 5 Microscope 120 20 12 12 ° ° 120 6 Aspirator 120 20 12 12 ° . ° 600 10 Water Cooler 1 800 _ 7 Block Heater 120 20 12 12 250 ° 8 Aspirator 120 20 12 12 600 ° ° 11 Ophthalmologic E ui ment(Type#1 2 70 W 9 Ultrasound#1,2 120 20 12 12 ° soo °. - 10 1VFHood f2o 20 1z 12 700 °.: 12 Ophthalmologic E ui ment(Type#1 2 720 11 Refrigerator 120 20 12 12 850 12 Honz.Lam.FlowHood 120 20 12 12 1440 13 Ophthalmologic;Li ht 2 100 13 Planar Biomed freezer 120 20 12 12 400 °.. '_ ° 14 Water Jacket Incubator 120 20 12 12 960 ° -- 15 Water Jacket Incubator 120 20 12 12 960 ° :< 16 Gas Guard 1zo 20 12 112 ° 24 Ophthalmologic Laser 1 1200 17 Block Heater 120 20 12 12 0, : 0 800 18 Aspirator 120 20 12 12 600 --�_---- L( 19 Warming Oven Isolated 120 20 12 12 240 °" ° 20 Microscope 120 20 12 12 120 °.`' Total VA 17190 W 21 Bench Centrifuge 120 20 12 12 ° 396 ° 22 Refrigerator 120 20 12 12 ° 850 O 23 Biohazard Hood 120 20 12 12 ° °:. i 1800 24 Side Warmer 120 20 f2 12 ° B'- 240 v L V) 25 Plug mould(S-405) GFI 120 20 12 12 423 °-- ° "- 26 Plug mold(S-405) GFI 120 20 12 12 727 °: LOAD SURVEY OFFICE#410 a a ° .......................................................... EXISTING EXISTING rT, 27 Plug mould(S-420) GFI 120 20 12 12 736 28 Plug mold(S-420) GFI 120 20 12 12 324 29 Gen Rec.(S-420) IS 120 20 12 12 °,: ° 860 30 Plug mold(S-420) GFI 120 20 12 12 ° 540 NEW NEW PANEL V PANEL V 31 GenRec.(S-420) is 120 20 12 12 1220 °.. . 32 Plug mold(S-420) GFI 120 20 12 12 630 °: 'D3� BACK-UP SECTION 2 SECTION 1 33 Flow HoodAsothermOven IS 120 20 12 12 ° 1440 ° 34 GenRec.(S-405) IS 120 20 12 12 ° 900 °° EQUIPMENT$, QTY VA 35 ° 0 0 36 °: o '• SUBPANEL SUBPANEL MANUAL W 37 0 38 39 o .r 40 0 1 General Receptacle 36 6480 TRANSFER c) ' SWITCH a--� 41 0 42 0 2 General Light Fluorescent 38 3658 ~ Q Sub-total 0Load 3028 4582 4430 Sub-total 0Load 3287 3098 3420 3 General Light Hi-Hat 14 1050 O J Total 0Load 12040 Total 0Load 9805 4 Computers 9 4500 O CL Panel Va= 12040+9805=21845 va 5 Co Machine 1 1000 25%continuous lighting load= 124 va 6 Fax Machine 2 720 25%larger motor= 450 va 7 Refrigerator 1 800 Total VA= (22419)/(208 x 43)= 62 Amps 8 Microwave 2 1400 � W N 9 Coffee Maker 1 600 Note: 10 Water Cooler - 0 The Load calculation shown above refers to the load under backup generator power. For load calculation under normal power,the continuous light load and larger motor are included in panel'D1'calculation Total VA 20208 ELECTRICAL/MECHANICAL ROOM O 4 TH FLOOR 0 U� NEW PANEL # D3 Note: vi A physical electrical survey was conducted on 11612000 to obtain the electrical load data for suite 400 Phase: 30-Y Voltage: 120/208v Panel amps: 200 amps. Make:ITE-G4242ML3200CU and suite 410. 0 The Survey load was 17,190 va for Suite 400 and 20,208 va for Suite 410.The load was distributed in Spaces: 42 No of ckts: 42 Main Break: none Type: ML panel D1 &D2 in order to calculate the electrical load of the floor with the addition of the new remodeling �' o M SPEC: GF=Ground Fault Interrupter NC=Non-concurrent load Rec.=Receptacle Ckt Lts=Lighting Ckt ST=Breaker with shunt trip EL IS=Isolated ground T=Via Timer LV=Via low voltage transformer C=Via Contactor REMOVE EXISTING WALL SHELVES TO THE SW="On-Off"Switching Duty Rated Breaker,as r NEC 240 83(d) TO THE LEFT OF PANELS D1 & D2 TO CT USE SPEC V BKR WHt CND VA CT USE SPEC v Blot WIR CND VA INSTALL PANEL BU AND TRANFER SWITCH. No AMP AWG SIZE No AMP AWG SIZE (inch) A713$ C (�h) A B C 1 Return Air Fan(405) 208 20 12 12 1080 ° ° 2 Return Air Fan(420) 208 20 12 12 1080 .0 n 3 U U ' 1080 °- 4 U U 1080 ° 5 U U 1080 6 U U ° ` 1080 C .�Y 7 AHU(405) 208 20 12 12 900 %°=` ° 8 AHU(420) 208 20 12 12 900 9 U U ' 900 °. 10 U U ° -- 900 '° LIGHTING FIXTURE SCHEDULE r 11 U U a ' 900 12 U u °' 900 Hanging fixtures&fans must be supported as per NEC 410-161422-18. U o 13 Condenset Unit(405) 208 30 10 12 2484 ° ° . 14 Condenset Unit(420) 208 30 10 12 2484 s ° °" 15 u u z48a 16 u u ° 2484 ° Fixtures with direct contact with Insulation must be rated IC as per NEC 410-65(C). 17 u u '.: °. 24aa 1g U u °. ° 2484 All fluorescent fixtures must be energy efcient. All ceiling fixtures must have an In-line fuse(thermal protector). 19 Water Heater 208 40 8 12 2750 °.' °" ! 20 Water Pump(405) 120 20 12 12 soo ° ° All li htln fixtures must be listed b a national recognized testing laboratory UL as per SFBC Chapter 45, Section 4503.2 o 21 U U s: 2750 °. 22 ° 0 °. Q C 23 ° 0 24 ° ° DESCRIPTION FIXTURE LAMP VOLT MOUNT COMMENT rn o 0 0 27 " o ° 28 ° o ° A 2'X 2'Fluorescent Uthonia 4 Lamps 120 Recessed lMth Emergency Battery Pack N \ o- "- 29 0 30 e 0 2SP-F-4-17-Al2-120-GEB-GLR-EL 17W T8 .a1 m 31 0 ° 32 0 ° °, B Down Light Select b Owner/Architect 1 Lam 100 w 120 Hi-Hat Select b Owner/Architect v \ (3 ° 3 33 0 <, 34 a 0 ° _0 (V -0 C V 35 ° ° 0 36 ° ° o C Emergency Lights Lithonia Built-in 120 Top, end or With Battery Pack 37 0 38 0 6ELM2P-N back mounting 39 o ° ao 0 ° D Exit light with Lithonia Built-in 120 Top, end or With Battery Pack at ° o a2 o batteries LQM-SW-1R-120-ELN back mounting ® TOMAS C. ARMSTRONG,.' P.A._ - Sheet no. Sub-total 0 Load 7214 7214 4464 Sub-total 0 Load 4964 4464 4464 E 2'X 4'Fluorescent Lithonia 4 Lamps 120 Recessed ENGINEERING CONSULTANTS. EB#{ r ° Total Load 18892 Total Load 13892 2GT-4-32-Al2-120-GEB-BLR F32TB 5600 S.W. 135th Ave., S-211,;` Miornl FI 31 3 Panel Va= 18892+13892= 32784 va ® Tsi (305)386-7152 Fox 386-7153 TCAPA®oo E - 2 TOMAS C. ARMSTRONG, P, . . , •'•, cF E.E. PE-17974 e: 2 of, 2 Total VA= (32784)/(208 x 43)= 91 Amp s \ t-`-'•� ;G'�