Loading...
00-0168-008 - - - = NO. REVISIONS DATE PLUMBING SYMBOL LEGEND - _ _ _- BID/PERMIT 01/25/ PLUMBING GENERAL NOTES + GENERAL CONDITIONS ____ ____ ABBREV. SYMBOL DESCRIPTION 1. THE ENGINEER SHALL BE IMMEDIATELY BE NOTIFIED OF ANY AND ALL EXISTING FIELD CONDITIONS WHICH DEVIATE FROM WHAT IS SHOWIN'ON THE PLANS. CONTRACTOR IS RESPONSIBLE TO PROVIDE PRICING FOR A COMPLETE INSTALLATION INCLUDING ANY LIGHT LINE DENOTES EXISTING PIPING; HEAVY LINE DENOTES-NEW-PIPING COSTS ASSOCIATED WITH FIELD CONDITIONS AT THE TIME OF BIDDING. 2 IT SWILL BE THE RESPONStIlUTY OF THE PLUMBING CONTRACTOR FOR THE ADVANCED ORDERING OF LONG LEAD ITEMS SO — - - -- DEUVERY WILL NOT INTERFERE WITH THE PRODUCTION OF OTHER TRADES RESULTING IN ANY DOWN OR LAG TIME: DOMESTIC OR POTABLE COLD WATER CW 3. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS.. AND SUPERVISION - DOMESTIC HOT WATER ( 110' f ) HW NECESSARY TO ACCOMPLISH THE WORK SHOWN AND/OR NOTED ON.THE DRAWINGS. THE PLUMBING CONTRACTOR SHALL INSTALL ALL _ NECESSARY OFFSETS. BENDS. AND TRANSITIONS AS REWIRED TO PROVIDE A COMPLETE AND FULLY OPERATIVE SYSTEM. -- DOMESTIC HOT WATER RETURN 1 HWR 4. CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES, INSPECTIONS, TESTS, AND ALL REQUIRED INSURANCE FOR PROTECTION 140 HOT WATER ( 140' f ) 140 AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. — F FIRE PROTECTION WATER LINE F 5. AFTER BID SELECTION AND PRIOR TO COMMENCEMENT OF WORK, THE PLUMBING CONTRACTOR SHALL SUBMIT SIX (B) COPIES OF MANUFACTURERS SPECIFICATIONS, PRESENTED IN NOTEBOOK OR A SIMILARLY BOUND FASHION, FOR ALL FIXTURES, PIPING. RWL RAIN WATER LEADER R - EQUIPMENT AND MATERIALS. AS STATED ON THE SCHEDULES AND/OR THE DRAWINGS. THE RESPONSIBILITY TO ACCEPT OR CONSULTANT: REJECT ANY PROPOSED SUBSTITUTION REMAINS WITH THE PROJECT ARCHITECT/ENGINEER. THE CONTRACTOR MAY AT HIS — SD RAINWATER OR STORM DRAIN SD JUDGMENT USE ANY ARTICLE, DEVICE, PRODUCT OR MATERIALS. WHICH IN THE JUDGMENT OF THE PROJECT ENGINEER AS SPECIFICALLY EXPRESSED IN WRITING, IS EQUAL TO THE ARTICLE, DEVICE, PRODUCT OR MATERIAL SPECIFIED. —CO CONDENSATE DRAIN LINE CD 6. IT SHALL NOT BE THE INTENT OF THESE DRAWINGS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION OR RENOVATION. PIPING —RW RECLAIMED OR GRAY WATER RW RUNS HEREIN ARE SHOWN DIAGRAMMATICALY; DO NOT SCALE DRAWINGS FOR LOCATIONS. EXACT ROUTING SHALL BE DETERMINED CO EN t4N�. • IN THE FIELD, UNLESS 01HERMISE NOTED, LOCATION OF PLUMBING FIXTURES MAY CHANGE. VERIFY EXACT LOCATION WITH ---- AW-- ACID WASTE AW COIASIJ<.TtNifi EN1i�tlRs ARCHITECT/ENGINEER PRIOR TO INSTALLATION. GW GREASE WASTE GW Certificate SW 47th Ave. Suite 402 Certificate No. ®0005720 + WORKMANSHIP IW ---- INDIRECT OR SAFE WASTE SW Davie. Florldo 33314 7, ALL, WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST CLASS WORKMANSHIP LIKE MANNER. SAID SANITARY, SOIL OR WASTE SAN Ph 954-791-2020 Fx 583-2345 CONTRACTOR SHALL MEET ALL REQUIREMENTS SET FORTH A BCCORDMNt�'E TH pA P CABLE NATTIIONAL.. STATE, LOCAL CODES AND QED Job 99089 CAD K:\99x9 PERFORMED AND MATERIALS USED SHALL BE IN STRICT TPL--- TRAP PRIMER LINE TPL ORDINANCES. —— — p --- COMPRESSED AIR Al 8. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR TO ORIGINAL CONDITION ANY AND ALL DAMAGES TO BUILDING ——-- 0 ——— OXYGEN OX SURFACES, BUILDING SLABS, EQUIPMENT, UTILITIES. AND FURNISHINGS CAUSED BY THE.CONTRACTOR DURING THE PERFORMANCE OF WOW. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT —Hµ— MEDICAL VACUUM HV OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY. ---LV--- LABORATORY VACUUM LINE LV • PIPING LP LIQUID PROPANE LP 9. UNLESS 07HERVASE NOTED. ALL POTABLE. WATER. RELIEF. DRIP. AND CONDENSATE RISER PIPING SHALL BE TYPE *L" OR THE TYPE 'K" COPPER MATH WROUGHT AIR COPPER CONDITIONING BR S FIT THGE-MECHANICNC PLUMBING CONTRACTOR S RESPONSIBLE BUI N14G CONNECT HDENSATE G NATURAL GAS LOW PRESSURE G RISER WITH STUB OUTS EQUIPMENT TO THOSE BUILDING SSATE DRAINS. ---FOS FUEL OIL SUPPLY FOS MATERIALS FOR COMPRESSED GAS AND/OR COMBUSTABLE GAS PIPING AND SLEEVING WILL APPEAR ON PROJECT DRAWINGS. . FOR---- FUEL OIL RETURN FOR 10. THE COLD WATER PIPE FOR THE PURPOSE OF GROUNDING ELECTRICAL EQUIPMENT SHALL NOT BE A DEAD END CAP BUT SHALL HAVE A LOOP FORMED WITH A TEE FITTING. THEM SHALL BE NO VALVE INSTALLED ALONG THAT LINE BETWEEN. THE MAIN -AV--- ACID VENT HV SERVICE SHUTOFF VALVE AND THE END LOOP. ---f0µ--- FUEL OIL VENT FOV 11. ANY BUILDING HOT WATER SERVICE HAVING MORE THAN 30 LINEAR FEET OF PIPING AS MEASURED FROM THE OUTLET OF THE WATER HEATER AND ANY HOT WATER RECIRCULATION RETURN LINE SHALL BE INSULATED WITH MINIMUM 1' NOMINAL WALL ----•V ---- VENT LINE - SANITARY/WASTE V THICKNESS CLOSED CELL 'IMCOA" INSULATION WITH A MINIMUM DENSITY OF 1.5 LB�CU.FT.. INTERIOR CONDENSATE DRAIN W PIPING RUNNING HORIZONTALLY SHALL BE INSULATED WITH MINIMUM 5/8" THICK IMCOA" INSULATION. ALL EXPOSED -^ RISER DOWN (ELBOW) Co PIPING OF ALL HANDICAPPED ACCESSIBLE LAVATORIES SHALL BE INSULATED WITH TRUEBRO" FASTENING SYSTEM INSULATION; z INSTALLATION USING TAPE AND/OR MARE IS NOT ACCEPTABLE. - ^ RISER UP (ELBOW) Z� LL,,, 12. UNLESS OTHERWISE NOTED, ALL BUILDING DRAINS, DRAINS. WASTE. VENT, DISCHARGE, RAINWATER AND/OR STORM DRAIN �---- RISE OR DROP LEADERS AND/OR CONDUCTORS SHALL BE NO-HUB SERVICE WEIGHT CAST IRON. —^ J 13, COMBUSTIBLE PIPING WILL NOT BE PERMITTED IN EXPOSED AREAS, IN RETURN AIR PLENUMS OR CEILING SPACES GATE OR BALL SHUT-OFF VALVE AS REQ'D GV m Q ;