Loading...
00-0002-029 3 2 1 A-5 A-5 4' O" A-5 10" x 16" CONCRETE OVERHANG FOOTING W/ (2) #5 - - - - - -- f --- --- 1 6, TOP AND BOTTOM 24" X 26" X 12" DEEP (� 4'-2" - 12'-3" -- -- 13'-8'" - - I6 0 5/E " l+' 8' 8 CONCRETE FOOTING z 8" --- --- ----- -- NEW BENCH W/ (3) 415 EACH WAY I 0" X 18" CONCRETE -- - - \ M I _ FOOTING W/ (2) #5 L (1) ROWS 2 X 6-� z'-v 1 TOP AND BOTTOM '_- Jt W W u� t - w � BLOCKING A \ I SPAN ' "I I 1 III_' VIII ��� ❑ - - z _ Q 12" X 10 P.T. WOOD NEW 4" CONCRETE SLAB N o l l o0 \ I 1 w/ 6 x 6 wl. +/wl. + - co ROW SOLD 2 6 EDGE OF O 2"' X 10 P.T. W II 'R FTER, @ 16 o.C. 4 - ! � z O o — — — — NEW 5" CONCRETE �� - U L B � J #� - - EXISTING S A A-4 II Lo BLOCKING AT MI I PAN RAFTERS � ! � �_ Q (� �- — SLAB w/ #5 @ 12" o N J O.C. BOTTOM & #4' _ LOPE 2 I/4"" PER FOOT NEW 6 -0" WALL _ "' � ° ILL SLOP /16 'ER FOOT ! @ 15" O.C. TEMP. = �, ® h; o n D X 30" PIP CONCRETE FOOTING �� -- EDGE OF EXISTING SLAB-�� - T W/ l #5 REINFORCEMENT EMENT 11 �❑ EXISTING SLAB #5 SHORT BARS 12" o.c. EXISTING POOL 0 i � - -- 21," -- - l l 2" x 10" P.T. wooD �, 2 + x 2 + x 12" - 2, X 10 P.T. WOOD - EXISTING - -. - - - CONCRETE FOOTING EXISTING 'RAFTERS @ 16" O.C. I CO POOL DE K C 2 X 10 P.T. WOOD � � � A-4 I W/ (3) #5 EACH 10 X 18 CONC. i' FOOTING - TO - 10" X 18" CONCRETE � WAY I — 11 ❑ RAFTERS @ 16 O.C. I ROW SOLID 2 X 6 a REMAIN FOOTING W/ O 5 O I Row SOLID i O i SLOPE 3/16" PER FOOT I II II J BLOCKING AT BEAM BLOCKING AT MIDSPAN 2" X 10" P.T. WOOD A A O.C.SLOP 2 /4" PER FOOT % I -- - 2 - SLOPE 31I PER FOOT ] I A-4 Cn 10" X 16" PIP CONCRETE �-- j FOOTING W/ (2) #5 U TOP AND BOTTOM W NEW POOL EQUIPMENT PAD - SEE DETAIL I SHEET A-8 I 1 �- 5 112" x 9 1/4" BUILT-UP ' - - - - q-4 — U WOOD BEAM 2" X 10° P.T. WOOD RAFTERS @ 6" O.C. NEW CONCRETE A/C PAD W SLOPE 2 I14" PER FOOT - W - w � U / � /ti' I ' I < 2' 2 0 — --- 0 C) LL U 10 --- O O U a -- — FOUNDATION PLAN — 5 1/2' x 9 1/4' BUILT-UP cv n WOOD BEAM IiJ SCALE: 1/8" = 1'-0" U co 0 0 _ In (n I� J I ; 1 i 'a I I W U a \_ a FRAMING PLAN Q ui SCALE: -0" 0 - c Q W n 0 U) C� z 0 -- --- ENGLERT 24GA. GALVALUME I-SEAM FLAT Imo. PANEL ON (2) LAYERS 415 FELT APPLIED W/ APPROVED RING-SHANK, TIN- RAFTER' CAPPED NAILS 9" O.C. @ LAP 8 12" IN TWO 525# 1,789# 1 931# 1,/89# ' ROWS STAGGERED ALONG CENTER OF SHEET /+O6# 2296# ON 3/4" PLYWOOD NAILED W/ 8D NAILS @ LJQ_ 7 1/4" X 7 112" - 6" O.C. ALONG EDGES AND RAFTERS NEW DBL. 2" X 6" TAPERED RADIANT BARRIER 1,552# BUILT-UP WOOD COLUMN -_---- �� BEAM WOOD COL. @ 24" O.C. I - - - - -- - - 2" X 10" P.T. WOOD RAFTERS @ 16" O.C. REVISIONS BUILT-UP WOOD COLUMN W/ 3/4" 0 ANCHOR BOLTS @ 24" O.C. � -,_, 7 1/4" X 7 112" 2" X 4 NAII FR B01 1FD INTO TIF ;- -,-. _ - -__RAKE TIE BEAM SIMPSUN ABU 44 POST BASE - #5 REINFORCING DRIILLED AND __ c NEW RADIANT BARRIER HUGHES C088 W/ (2) 3/4° THROUGH � -` � W/ (2) I12 (l� TIiROUGH BOLTS '-- 0 BOLTS IN 2" X 1/4" STEEL STRAPS AND � � '' ! _ SOLID 2' X 6" P.T. WOOD BLOCKING \ \\ �1 a R-26 BAT INSULATION _ , _ I , zn� EMBEDDED 8 MIN. INTO CONCRETE -_ EPDXY EXIS GROUTED 5" @ MIN. 6" O.C.O.CO � � � � _ �T 1. _ NEW R-26 BAT INSULATION SIMPSON RFB#5X8 BOLT 5/8" G Y N'j - - MIN. INTO EXISTING SLAB/ FOOTING --- - - 4 2" X 10" P.T. WOOD RAFTER @ 16" O.C. DRILLED AND EPDXY GROUTED 5" - -- HUGHES C088 W/ (2) 3/4'" THROUGH -- � 3/4 PLYWOOD CEILING NEW 5" CONCRETE SLAB W/ - - - \ BOLTS IN 2° X I/l," STEEL STRAPS AND --� � -_ `;� __ - HUGHES HC520 HURRICANE CLIPS � 6" X 6" #5 REINFORCING NI EMBEDDED 8" MIN. INTO CONCRETE -- , - --- - - 8'" W/ (8) 6GA. X 2 112" WOOD SCREWS HUGHES HC520 HURRICANE CLIPS W/ EXISTING 4" CONCRETE SLAB - - A (8) 6GA x 2 112" WOOD SCREWS IN ON 6MM VAPOR BARRIER -- - IN BEAM AND (6) 8D NAILS IN JOIST T.0.C. Q _ -- 1�� BEAM AND (6) 8D NAILS IN JOIST EXISTING 10" X IS REINF. _ 4 Q ® e ® HUGHES UPLIFT CONNECTORS \Q � - - -' z NEW 24° X 24° X I2° DEEP d Q Q 4 Q - CONCRETE FOOTING --NEW 5"' CONCRETE SLAB W/ d �" � -- '� "� SHA-6T W/ (2) 3//+" THROUGH CONCRETE FOOTING W/ d d (3) #5 REBAR EACH WAY Q ONX6M'M#VAPOR BARRIER - Q Q X081 J IBULTSMNACUNCRETE2EACH (4) 1//+" PLATE STEEL W/ (4) 314" \\ �- SIDE OF BEAM BOLTS THROUGH GLUE LAM. AND NEW 24° X 24'" X 2" DEEP � � �-- (4) 5/8'" l� BOLTS THROUGH COLUMN Q .r.SL - `. (2) #4 REBAR d d CONCRETE FOOTING W/ d d Q - - o SEE DETAIL 0 SHEET A-7 \ Q Q DATE: 01.28.00 d Q Q d N (3) #5 REBAR EACH WAY - -- 3 1/8° X 15" LAMINATED WOOD BEAM r \ N Q - _ 3 i/8" X I� GLUE LAMINATED WOOD BEAM • � • ■ O � ■1 ® O ®� O � e v ■ ■ � ® I■ ® � I■ ® r ■ - 6F VI, DF/WW 16F - V , DF/WW Q • • • • • • Q - NEW 8" X 16" CONCRE T E STARTER COLUMN 1 1/4" X 7 112'" BUILT-UP I --- ___ ---,�- --- � WOOD COLUMN 3,578# 6,259# II' 1'-4" 1 DETAIL 2 DETAIL 3 DETAIL 4 DETAIL 5 DETAIL /\ - 2 q—2 SCALE: 1 112" = 1'-0" q—2 SCALE: 1 112" = I'-O" A-2 SCALE: 3/4'" _ -0" q—2 SCALE: 1 112" = I' 0" q—2 SCALE: 1 112" = 1'-0" LF17 1_4 SHEET 5 OF 10