Loading...
00-0002-003 I i ' s • ` I • 3 2 1 j�-r- - -- - - � A-5 A-5 4'-�" A-5 I0" x 16" CONCRETE OVERHANG •^ FO')TING W/ (2) #5 • --- -�� *'w • TO" AND BOTTOM 2L+" X 26" X 12" DEEP (, 8.. 13' 8„ - ----- - - 16--0 5/ ---- $ - -4 8 - - $� - /;;� �� CONCRETE FOOTING -- ---- ---- -- --------- ---- -- --- ---- ---- -- - - - - �j/ NEW BENCH LJ W/ (3) #5 EACH WAY co -- _ - _ - _ -- - - 77 1 � � � �� - 10" X 18' CONCRETE �i I % 1 1 FOOTING W/ (2) #5 (1) ROW 6-Id 21�x 6 1 « � /,�/ � � TOP AND BOTTOM t� �jj� � � � w i BLOCKING AT IDSPAN -nom!— U --- -- > 2° X IO° P.T. WOOD %%/ '� NEW 4" CONCRETE SLAB (� Q a 00 � N p I_ 1� (1) ROW SOLID 2 6 �2° X 10" P.T. W EDGE OF � W/ 6 X 6 W1.4/W1.4 00 co co R FTE_R @ 16 O.C. 4 / /1 0 0 LNEW 5" CONCRETE 0 rn # - - BLOCKING AT MI PAN / I i "- '-' �- - - �/� I � i �I j EXISTING SLAB-� � ;� � � � � RAFTERS @ 16" uj % A-4 SLAB W/ #5 @ 12' / I C/ � U SLOPE 2 1/4" PER FOOT 0.C. BOTTOM #4' �� _�I I N a o NEW 6'-0" WALL @ I5" O.C. TEMP. - SLOP /I6� ER FOOT �H IL EDGE OF III - / 1 l c � � C ❑ EXISTING SLAB � I 12" X 30" PIP CONCRETE FOOTING 1- -1 EDGE OF EXISTING SLAB W/ (4) #5 REINFORCEMENT � �� EX ST G o / III I EXISTING POOL #5 SHORT BARS @ 12 O.C. �� _ I 2" x 10" P.T. WOOD � � / I j � � V � � � 24" x 2.4" x 12" s� 2" X 10° P.T. FOOD 3 -EXISTING o �1 XISTING \ CONCRETE FOOTING E RAFTERS @ 16" O.C. - - - -r- - - - = -- - - POOL DECK AFTE W/ (3) #5 EACH 10" X 18' CONC. 2_' X 10' P.T. WOOD A—4 10" X 18" CONCRETE ' (1) ROW SOLID 2 X 6 / RAFTERS @ 16 O.C. �� -- � „ X ❑ WAY FOOTING - TO V (1) ROW SOLID 2 X 6 REMAIN FOOTING W/ (2) #� {y� SLOPE 3/16" PER FOOT I TOP AND BOTTOM I� o BLOCKING AT BEAM I / \ BLOCKING AT MIDSPAN ` 2" X 10" P.T. SLOP 2 I/4 PER FOOT " It I SLOPE 3/10" PER FOOT 2 v I A-4 10" X 16" PIP CONCRETE FOOTING „ TOP AND BOTTOM NEW POOL EQUIPMENT PAD W --- i - 5 1/2" X 9 I/4° BUILT-UP WOOD BEAM 2„ X 10" P.T. WOOD - -- - - -- - - - -- - - - - - - - - - J NEW CONCRETE A/C PAD W RAFTERS @ 16° O.C. SLOPE 2_ I/4 PER FOOT --- - — �- w n o 2" X 10" T. WOOD r w o Lo 31 W '`. RAFTERS 16° U � 10 = 0 Q o 0 (, Q 51/2" 91/4" BUILT-UP ��� FOUNDATION PLAN Q o 0 2" X 10" P.T. WOOD RAFTERS @ 16" O.C. SCALE: 1/8" = I'-0" I 4" CONC. SEAT W/ % 0. i (4) # HOOK BARS BOT. l � • � - AND #4 @ 6° O.C. TOP 77 AND I #3 AT END. 1 �r 2 r �r 3„ d ' .I 2'_82 �, 64w 1'-24" A-5 �. a L W Q FRAMING PLAN 1� �' a k r 1 LL (vn/ co LL 6 DETAIL - SECTION @ BENCH �J _ 0 q-2 SCALE: 112" = 1'-0" ' h v z 0 ENGLERT 24GA. GALVALUME I-SEAM FLAT PANEL ON (2) LAYERS #15 FELT F- APPLIED W/ APPROVED RING-SHANK, TIN- RAFTER CAPPED NAILS 9" O.C. @ LAP 8� 12" IN TWO 525# 1,931#� 1,789# ROWS STAGGERED ALONG CENTER OF SHEET 4016# 2296# ON 3/4" PLYWOOD NAIL-ED W/ 80 NAILS @ 7 I/4" X 7 112" 6" O.C. ALONG EDGES AND RAFTERS Q _ BUILT-UP WOOD COLUMN - RADIANT BARRIER NEWWOOD COL. @ 24P0 CD 1,552# 7 1/4" X 7 112" 2" X 4" NAIL FR BOI.TFD INTO TIF BEAM _` BUILT-UP WOOD COLUMN EXISTING CONCRETE SLAB W/ 3/L+" ANCHOR BOLTS @ 24" O.C. �' _" 2" X 10" P.T. WOOD RAFTERS @ 16" O.C. REVISIONS �i `i' I , �, j SIMPSON ABU 44 POST BASE #5 REINFORCING DRILLED AND �V NEW RADIANT BARRIER W/ (2) 112 0 THROUGH BOLTS HUGHES C088 W/ (2) 3/4" THROUGH h� n � - e- RAKE TIE BEAM _ EPDXY GROUTED 5" MIN. INTO i I' I -__ _ I I ' j �� SOLID Z" X 6' P.T. WOOD BLOCKING 07.22.00 BOLTS IN 2" X 1/4" STEEL STRAPS AND Q ���j I II ill �1II - __R-26 BAT INSULATION I� t" �'I - _ 1 _ _ I\ sIMPSON RFB#5x8 BOLT 5/8" — SECT. DWG. ADDED J NEW R-26 BAT INSULATION EMBEDDED 8" MIN. INTO CONCRETE _ ? EXISTING SLAB @ 6° O.C. � O � 2 X 10 P.T. WOOD RAFTER @ 16 O.C. L, -- -_ DRILLED AND EPDXY GROUTED 5' — 9 �I 02.25.01 - ADDITNL N/ HUGHES C088 W/ (2) 3/4" THROUGH _ _ --- 3/4" PLYWOOD CEILING MIN. INTO EXISTING SLAB/ FOOTING p® ROOF STRUCTURE NEW 5" CONCRETE SLAB W/ N, BOLTS IN 2° X I/4" STEEL STRAPS AND HUGHES HC520 HURRICANE CLIPS � „ � 6" X 6" #5 REINFORCING - - \/ }�Q -6 -- HUGHES HC520 HURRICANE CLIPS W/ EXISTING 4" CONCRETE SLAB --- -- _y EMBEDDED 8"8° MIN. INTO CONCRETE - I g" W'/ (8) 6GA. X 2 I/2" WOOD SCREWS /\�/\ _ ON 6MM VAPOR BARRIER \\ -- - IN BEAM AND (6) 8D NAILS IN JOIST /\ T.0.C. (8) 6GA X 2 112" WOOD SCREWS IN \ 1��1 - - -- - _ BEAM AND (6) 8D NAILS IN JOIST -- d Q 'm S A ■1 - L �� O�I EXISTINCONOC"RET18"FOOTING - �� - - � ! U� � NEW 24" X 24' X 12" DEEP d d 4 " d d -�` - HUGHES UPLIFT CONNECTORS NEW 5 CONCRETE SLAB W/ \ r SHA 6T W/ (2) 3/4" THROUGH �\ } CONCRETE FOOTING W/ 4 d d ~ 1 - - O �- - "�- 6° X 6 #5 REINFORCING (3) #5 REBAR EACH WAY \\' BOLTS IN BEAM AND (2) I/2° � 4 ON 6MM VAPOR BARRIER 4 d _ X 8" J BOLTS IN CONCRETE EACH - >j - (4) IIL+" PLATE STEEL W/ (4) 3/1," d Q ` I� SIDE OF BEAM /-\� BOLTS THROUGH GLUE LAM. AND d NEW 24" X 24" X 12" DEEP �_ (4) 5/8" 0 BOLTS THROUGH COLUMN � '�'�''ti"' �'�� (2) #1, REBAR SEE DETAIL 10 SHEET A-7 DATE: 01.28.00 d p CONCRETE FOOTING W/ d Q o - Q Q d d Q N (3) #5 REBAR EACH WAY --� Q d 4 - �\ \\ 3 1/8" X 15" LAMINATED WOOD BEAM --- 3 1/8" X 15" GLUE LAMINATED WOOD BEAM • • 1■ O e e ® A 111 1■ ® �.� III ■ ® O 1■ ® p 11 Q - 16F - VI, DF/WW -- --- I6F - VI, DF/WW _ � 4 • • • • • • '--NEW 8" X 16" CONCRETE — L " BUILT-UP - STARTER COLUMN 3,578#T 6,259# 7 / + X 7 1/2" BUILT U WOOD COLUMN 1 DETAIL 2 DETAIL 3 DETAIL 4 DETAIL 5 DETAIL A - 2 q-2 SCALE: 1 112" = 1'-0" q—2 SCALE: 1 112" = 1'-0" q-2 SCALE: 314" = 1'-0" q-2 SCALE: 1 112" = 1'-0" q—2 SCALE: 1 112" = 1'-O' <( N SHEET 3 OF 10 I