Loading...
00-0684 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE SCORE* =83.3 The higher the score,the more efficient the home. CALWELL, INC., 6116 SW 62 Terrace, SO. MIAMI, FL, 33143- 1. New construction or existing Addition _ 12. Cooling systems 2. Single family or multi-family Multi-family _ a. Central Unit Cap: 100.0 kBtu/hr _ 3. Number of units,if multi-family 32 _ SEER: 11.00 4. Number of Bedrooms 2 _ b.N/A 5. Is this a worst case? Yes _ T 6. Conditioned floor area(f11 691 ftz c. N/A _ 7. Glass area&type _ a. Clear-single pane 89.0111' — 13. Keating systems b. Clear-double pane 0.0 R' — a. Electric Strip Cap: 100.0 kBlu/Irr _ c. Tint/other SC/SIIGC-single pane 0.011' COP: 1.00 •• ••• 0••0.0 00•� •r0• • J.Tint/other SC/SIIGC-double pant 0.0 R' b. N/A • 8. Floor types _ r • 0 • • ••• • so**— so** a Slab-On-Grade Edge Insulation R=0.0,82 2(p)(11 c N/A ' b.N/A • • • • • • • 0• : 0000 c• N/A 14. f lot water systems " ' 9. Wall types _ a. Electric Resistance : Crap;40.0 g1lons T a. Concrete,Int Insul,Exterior R=0 0,528.011= _ E .O.88••_ •••••• b.N/A _ b.N/A * see • • • e. N/A i 0 •0••.• d.N/A c. Conservation credits • • •_ • c. N/A (I 1R-}feat recovery,Solar • .""• ;"'' 10. Ceding types •0•00• •••• • • g YP _ DI- Dedicated-Dcd�cated heat pump) a. Under Attic R=9.0,691.0Il' _ 15. HVAC credits i o ""• (CF-Cciling fan,CV-Cross ven(ilation, • • c N/A HF • 00'00 -Whole house fan, 11. Duds _ PT-1'rogrammable'Ilicrmostal, • a. Sup:Con. Rct:Con. Ali:Interior Sup.R=6.0,30.0 It _ RI3-Attic radiant barrier, b.NIA MZ-C-Multizonc cooling, MZ-H-Multizonc heating) I certify that this home has corn lied with the Florida Energy Efficiency Code For Building Construction through the abov energy saving features which will be installed(or exceeded) THE ST in this home before final insp ction.Othe ise,anew EPL Display Card will be completed �p4 based on installe o e co liant featur s. � fill, Builder Signature: --. ;' Date: M ^ _1_' d a Address of New Home:/ City/EL Zip: *NOTE.The home's estimated energy performance score is only available through the FLARES computer program. This is not a Building Energy Rating. If your score is 80 or greater(or 86 for a US EPA/DOE EnergyStcy designation), your home may qualify for energy efficiency mortgage(EEM)incentives if you obtain a Florida Energy Gauge Rating. Contact the Energy Gauge Hotline at 4071638-1492 or seethe Energy Gauge web site at www.fsec.ucf edufor information and a list of certified Raters. For information about Florida's Energy Efficiency Code For Building Construction, contact the Department of Community Affairs at 8501487-1824. EncrgyGaugc®(Version: FLRCNA-200) FORM 60OA-97 Code Compliance Checklist ~ Residential Whole Building Performance Method A - Details ADDRESS:6116 SW 62 Terrace, SO. MIAMI, FL, 33143- PERMIT#: 6A-21 INFILTRATION REDUCTION COMPLIANCE CHECKLIST COMPONENTS SECTION _REQUIREMENTS FOR EACH PRACTICE CHECK Exterior Windows&Doors 606.1.ABC.1.1 Maximum..3 cfm/sq ft.window area .5 cfmlsq ft.door area. Exterior&Adjacent Walls 606.1.ABC.1.2.1 Caulk,gasket,weatherstrip or seal between:windows/doors&frames,surrounding wall; foundation&wall sole or sill plate,joints between exterior wall panels at comers;utility / penetrations;between wall panels&top/bottom plates,between walls and floor. (/ EXCEPTION:Frame walls where a continuous infiltration barrier is installed that extends from,and is sealed to,the foundation to the top plate Floors 606.1.ABC.1.2.2 Penetrations/openings>1/8"sealed unless backed by truss or joint members. EXCEPTION.Frame floors where a continuous infiltration barrier is installed that is sealed to the penmeter,penetrations and sea_ms._ Ceilings 6061.ABC.1.2.3 Between walls&ceilings;penetrations of ceding plane of top floor;around shafts,chases, soffits,chimneys,cabinets sealed to continuous air barrier,gaps in gyp board&top plate, V attic access.EXCEPTION:Frame ceilings where a continuous infiltration barrier is • • installed that is sealed at the penmeter,at penetrations and seams._ ••_•••• _ _ : : Recessed Lighting Fixtures 606.1.ABC.1.2.4 T IC rated with no -� TT •+ .••° : Type penetrations,sealed,or Type IC or non-IC rated,ingtalleU inside a sealed box with 1/2"clearance&3"from insulation;or Type IC rated with<'2.0 efm from conditioned space,tested. _ ' Multi-story Houses 606.1 ABC.1.2.5 Air barrier on imeter of floor cavity between floors. -_ -:• : - —�°- _r -- °° ° Additional Infiltration regls 606.1.ABC.1.3 Exhaust fans vented to outdoors,dampers;combustion space heaters co;nplyVvjt§NFPA,. +/ have combustion air. • • +' 6A-22 OTHER PRESCRIPTIVE MEASURES must be met or exceeded by all residences. e: °' ....:. COMPONENTS SECTION REQUIREMENTS CHECK Water Heaters 612.1 Comply with efficiency requirements in Table 6-12.Switch or clearly markbd circuit ." ' breaker(electric)or cutoff(gas)must be provided.External or built-in heaC ired. ° ° Fw- Swimming Pods&Spas 612.1 Spas&heated pods must have covers(except solar heated).Non-commarciat pons •°° • °°:° • must have a pump timer.Gas spa&pod heaters must have a minimum th�e°rmal* /'! " • efficiency of 78%. Shower heads 612.1 Water flow must be restricted to no more than_2.5 gallons per minute at 80 PSIG. • Air Distribution Systems 610.1 All ducts,fittings,mechanical equipment and plenum chambers shall be mechanically attached,sealed,insulated,and installed in accordance with the criteria of Section 610. Ducts in unconditioned attics:R-6 min.insulation. -- - ----------------- -- -------------- -- ------ - WAC Controls_ 607.1 _Separate reader accessible manual or automatic thermostat for each system. _ Insulation 604.1,602.1 Ceilings-Min.R-19.Common walls-Frame R-11 or CBS R-3 both sides. Common ceding&floors R-11. C—Xlg //VG- 12-y EnergyGaugeTm DCA Form 600A 97 EnergyGauge®/FlaRES'97 FLRCNA-200 FORM 60OA-97 WATER HEATING & CODE COMPLIANCE STATUS s- Residential Whole Building Performance Method A - Details ADDRESS:6116 SW 62 Terrace,SO. MIAMI, FL,33143- PERMIT#: BASE AS-BUILT WATER HEATING Number of X Multiplier = Total Tank EF Number of X Tank X Multiplier X Credit = Total Bedrooms Volume Bedrooms Ratio Multiplier 2 2370.00 4740.0 40.0 0.88 2 1.00 2369.00 1.00 4738.0 As-Built Total: 4738.0 CODE COMPLIANCE STATUS BASE AS-BUIET:6: .... '..' Cooling + Heating + Hot Water = Total Cooling + Heating + Hot YVat& . _ •Total. Points Points Points Points Points Points Potrits Points -7161.5 529.4 4740.0 1 2431.0 5996.2 1508.4 47313.0 " 1=42.6 PASS . ' . .... ...... ..... .... . . �o4Txe sr�r`��.� • zz 11 c0D WiR, EnergyDaugeTm DCA Forth 60Q-97 FORM 60OA-97 WINTER CALCULATIONS Residential Whole Building Performance Method A - Details ADDRESS:6116 SW 62 Terrace,SO. MIAMI, FL, 33143- PERMIT#: BASE AS-BUILT GLASS TYPES .18 X Conditioned X BWPM = Points Overhang Floor Area Type/SC Ornt Len Hgt Area X WPM X WOF = Points .18 691.0 2.02 251.8 Single,Clear W 1.0 0.0 24.0 4.47 1.00 107.0 Single,Clear E 1.0 0.0 39.0 3.76 1.01 147.9 Single,Clear S 0.0 0.0 26.0 3.55 1.00 92.2 As-Built Total: 89.0 347.2 WALL TYPES Area X BWPM = Points Type R-Value Area X WPM = Points Adajcent 0.0 0.0 0.0 Concrete,Int Insui,Exterior 0.0 528.0 ;•w;;.'y0 10032 • Exterior 528.0 0.60 316.8 w w w w •. • •o•• •••. Base Total: 528.0 316.8 As-Built Total: 528.0 • ••Ia®3.2 ••ww DOOR TYPES Area X BWPM = Points Type Area •wpil = Paints • Adjacent 20.0 1.30 26.0 Exterior Wood 200 • 2.80 ••56.0 *000:9 Exterior 20.0 1.80 360 Adjacent Wood 20.0 000010.10 •••X8.0 •• Base Total: 40.0, 62.0 As-Built Total: 40.0 •• •• •94.0 • CEILING TYPESArea X BWPM = Points Type R-Value Area x•Y(FV =•,I;Qipts ;•••• . • .... ...... Under Attic 691.0 0.10 69.1 Under Attic 9.0 691.0 ••••Q37 •••j$1:6 Base Total: 691.0 69.1 As-Built Total: 691.0 • 391.6 •••••• FLOOR TYPES Area X BWPM = Points Type R-Value Area X WPM = Points w Slab 82.2(p) -2.1 -172.5 Slab-On-Grade Edge Insulation 0.0 82.2(p) -2.10 -172.5 Raised 0.0 0.00 0.0 Base Total: -172.5 As-Built Total: - -172.5 INFILTRATION Area X BWPM = Points Area X WPM = Points 691.0 -0.06 -41.5 691.0 -0.06 -41.5 Winter Base Points: 485.7 Winter As-Built Points: 1622.0 Total Winter X System = Heating Total X Cap X Duct X System X Credit = Heating Points Multiplier Points Component Ratio Multiplier Multiplier Multiplier Points 1622.0 1.000 0.930 1.000 1.000 1508.4 485.7 1.0900 529.4 1622.0 1.00 0.930 1.000 1.000 1508.4 EnergyGaugeTM DCA Forth 60QA-97 FORM 60OA-97 _ SUMMER CALCULATIONS Residential Whole Building Performance Method A - Details ADDRESS:6116 SW 62 Terrace, SO. MIAMI, FL, 331437 PERMIT#: BASE AS-BUILT GLASS TYPES .18 X Conditioned X BSPM = Points Overhang Floor Area Type/SC Ornt Len Hgt Area X SPM X SOF = Points .18 691.0 53.20 6617.3 Single,Clear W 1.0 0.0 24.0 65.53 0.99 1559.7 Single,Clear E 1.0 0.0 39.0 73.03 0.99 2820.7 Single,Clear S 0.0 00 26.0 62.19 1.00 1617.0 As-Built Total: 89.0 5997.5 WALL TYPES Area X BSPM = Points Type R-Value Area X. SPM = Points Adaicent 00 0.0 0.0 Concrete,Int Insul,Exterior 00 528.0 •X4.20 2217.6 • • • 0 oe o Exterior 5280 2.70 1425.6 • 0• 0• .0000. ee • eeee Dee. e e Base Total: 528.0 1425.6 As-Built Total: 528.0 0000 DOOR TYPES Area X BSPM = Points Type Area x*SVq = Polhts • Adjacent 20.0 2.60 52.0 Exterior Wood 200 ' 9.40 ' 1880 Exterior 20.0 6.40 128.0 Adjacent Wood 200 e'e18Q :.a ZGO e Base Total: 40.0 180.0 As-Built Total: 40.0 • • 284.0 • .e e e e. CEILING TYPES Area X BSPM = Points Type R-Value Area X.•Spm = *Reiftts Under Attic 691.0 0.80 552.8 Under Attic 9.0 691.0 •e.3490 •Q60 Base Total: 691.0 552.8 As-Built Total: 691.0 2073.0 •••• FLOOR TYPES Area X BSPM = Points Type R-Value Area X SPM = Points Slab 82.2(p) -20.0 -1643.0 Slab-On-Grade Edge Insulation 0.0 82 2(p) -20.00 -1643.0 Raised 0.0 0.00 0.0 Base Total: -1643.0 As-Built Total: -1643.0 INFILTRATION Area X BSPM = Points Area X SPM = Points 691.0 18.79 12983.9 691.0 18.79 12983.9 Summer Base Points: 20116.6 Summer As-Built Points: 21893.0 Total Summer X System = Cooling Total X Cap X Duct X System X Credit = Cooling Points Multiplier Points Component Ratio Multiplier Multiplier Multiplier Points 21893.0 1.000 0.930 0.310 0.950 59%.2 20116.6 0.3560 7161.5 21893.0 1.00 0.930 0.310 0.950 5996.2 EnergyGaugeT"DCA Form 600A-97 FORM 60OA-97 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs Residential Whole Building Performance Method A Project Name: 0022 Builder Address: 6116 SW 62 Terrace Permitting Office: City, State: SO. MIAMI, FL 33143- Permit Number: Owner: CALWELL, INC. Jurisdiction Number: Climate Zone: South 1. New construction or existing Addition - 12. Cooling systems 2. Single family or multi-family Multi-family - a Central Unit Cap: 100.0 kBtu/hr - 3. Number of units,if multi-family 32 _ SEER. 11.00 - 4. Number of Bedrooms 2 _ b.N/A _ 5. Is this a worst case? Yes 6. Conditioned floor area(R� 691 Ill c. N/A - 7. Glass area&type - - a. Clear-single pane 89.011' - 13. I lcating systems b. Clear-double pane 0.0 fl' - a Electric Strip Cap. 100.0 kBtuAir c. Tint/other SC/SHGC-single pane 0.0 fl= _ COI': 1.00 - 00 *00 d.TinUother SC/SHGC-double pane 0.0 111 b.NIA ;••;•; : : : 8. Floor types : : : .000% 0 0 • a. Sla"-Grade Edge Insulation R=0.0,82.2(p)It _ c. N/A •• ,• •• .0000 . b.N/A .60f% 0 0 00-0 0000 c. N/A 14. Hot water systems ;•• • 9. Wall types - a. Electric Resistance ; Ca%10.0 ga114►ys a. Concrete,Inl Insul,Exterior R=0.0,528.0 W - • EF:0:88*._,* 0 0 0 0 0 0 b.N/A b N/A 0 0 0 0 . 0 0' c. N/A _ : : :..00. 00000 0 0 d.N/A _ c. Conservation credits 0• • 0_ 0 e. N/A (I IR-I Icat recovery,Solar 0 . 0000 000000 10. Cciling types - DHI'-Dedicated heat pump) :000% •••• • a. Under Attic R=9.0,691.0 fY - 15. HVAC credits : : ;?'0 0"0 0000-00- b.N/A - (CF-Cciling fan,CV-Cross ventilation, 0009 0 0 0 0 0 . c. N/A I IF-Wliolc house fan, 00 00 11. Ducts _ P'f-1'rogranunablc'l1icmiostat, 0 a. Sup:Con. Ret:Con. AM:Interior Sup.R=6.0,30.0 R - RB-Attic radiant barrier, b. N/A MZ-C-Mullizone cooling, MZ-11-Multi7onc healing) Glass/Floor Area: 0.13 Total as-built points: 12243.00 PASS Total base points: 12431.00 I hereby certify that the plans and specifications covered Review of the plans and by this calculation are in compliance with the Florida specifications covered by this %0 CHE sTgTF Energy Code. calculation indicates compliance y�',,��' -`r fit PREPARED BY: with the Florida Energy Code. Before construction is completed - , a DATE: d this building will be inspected for I hereby certify that this building, as designed, is in compliance with Section 553.908 ° o compliance with the Florida Energy Code. Florida Statutes. °b �` OWNER/AGENT: BUILDING OFFICIAL: DATE: DATE: EnergyGauge®(Version: FLRCNA-200) Summary Energy Code Results Residential Whole Building Performance Method A CALWELL, INC. Project Title: Class 3 Rating 6116 SW 62 Terrace 0022 Registration No. 0 S0. MIAMI, FL 33143- Climate: South 6/5/00 Building Loads Base As-Built Summer: 20117 points Summer: 21893 points Winter: 486 points Winter: 1622 points Hot Water: 4171 points Hot Water: 4171 poiffi*: 0000 .. . 0000 0000 Total: 24774 points Total. 27686 points •::�': . . .. 0000.. 0000 Energy Use :•0000 0000:. 0000 :0000: Base As-Built 0006 0000 0060 . . Cooling: 7162 points Cooling: 5996 poirits :0 Heating. 529 points Heating. 1508 points Hot Water: 4740 points Hot Water: 4738 points Total: 12431 points Total: 12243 points PASS e-Ratio: 0.98 EnergyGauge®(Version: FLRCNA-200) --u A.L/L41,L1tLL LLLtl1L Vti1W / LIL1111 IAVJJ W1LVV.Vd1L4VL1 (BASED ON A.C.C.A. MANUAL J - SEVENTH EDITION (c) 1986 by A.C.C.A.) —— —�——--——--------——---—————--———————--—————--——---—--————--————--—--———---—————————---— Project 0022 IPrepaired by: Address' 6116 SW 62 Terrace ISouthern Energy Eval. Serv. City SO. MIAMI 1122 East Minnesota Avenue State/Zip FL 33143- (Orange City,F1 32763 Owner MARIA RAMON & ALBERT CABRERAS ITEL:1-800-329-SEES (7337) Builder NULL IFAX:1-800-639-SEES (7337) HVAC Contr lemail:sees @iag.net --------------------------------------------------------------------------------------------- e Cond Floor Area = 691 (Total Glass Area = 89 Conditioned Floor Area to Total Glass Area Ratio = 12.9% --------------------------------------------------------------------------------------------- * USA Climatic Conditions & Design Conditions * --------------------------------------------------------------------------------------------- Geographical Location I Maimi AP, Florida North Latitude / Elevation 1 25° 9Ft. Above Sea Level Outdoor Winter Dry Bulb 1 480 Indoor Winter Dry Bulb 1 700 Winter Temperature Diff. (wTd) 1 22° Outdoor Summer Dry Bulb 1 890 Outdoor Summer Wet Bulb 177° Outdoor Summer Hum. Ratio Gr/Lb 1 49 Indoor Summer Relaltive Hum. 1 50% Indoor Summer Design Gr/Lb. 1 56 Indoor Summer. Dry Bulb 175• • • Summer Temperature Diff. (sTd) 1 14• • 0000.. • Summer Daily Range 1 150 (Low Deviation) • • • • • .6.6.6.6 s• • '——--————————--——----———----—-----—————----------—--—--——-------——————--————--.—ii_———�——--t—— 00 . .6000 0.0. * 'HEATING SUMMARY * 0022-1.ENB * COOLING SUMMARY.* . ' 0000 -------------------------------------------------------------------------------------'--=-=__ .. . 0000 'SUBTOTAL 15451.1 1 STRUCTURE SENSIBLE ;'._ ; 11Q49.9 I OCCUPANTS ..12Q0.0 I APPLIANCES . + : 1290.0 0000.. I SUBTOTAL SENSIBLE ..r. .13449.9 .• DUCT LOSS + 0 I DUCT GAIN + : 0 ...... TOTAL LOSS = 15451.1 1 TOTAL SENSIBLE •. _.� 13449.9 °MECHANICAL VENT.- 50 CFM = 1210.0 1 MECHANICAL VENT.- 50 CFM . _ 00170.0 :0000: I TEMP.SWING 3.0•@ 95° ....1c.. 0.0001.0 MINIMUM EQUIPMENT LOSS = 16661.1 1 MINIMUM EQUIPMENT SENSIBLE; _ ; 1.4219.9 -0000. .------------------------------------------------i----------------------------:.-.-.-- 0000 ;20% OVERSIZE LOSS = 3332.2 120% OVERSIZE SENSIBLE = 2844.0 ..:..• EQUIPMENT LOSS + 16661.1 I EQUIPMENT SENSIBLE + 14219.9 . MAXIMUM EQUIPMENT LOSS = 19993.3 1 MAXIMUM EQUIPMENT SENSIBLE = 17063.9 ---------------------------- I-------------------I-------------------------------------------- I TOTAL LATENT = 5636.4 1 EQUIPMENT SENSIBLE + 14219.9 I EQT.SENSIBLE + LATENT = 19856.3 --------------------------------------------------------------------------------------------- * AIR FLOW FACTORS --------------------------------------------------------------------------------------------- HEATING FACTOR (BTUH/CFM) = 20.0 1 COOLING FACTOR (BTUH/CFM) = 12.7 HEATING CFM = 833.1 1 COOLING CFM = 928.7 --------------------------------------------------------------------------------------------- * EQUIPMENT SELECTION * --------------------------------------------------------------------------------------------- EQT. MANUF GAR[Z I r9 1 SENSIBLE CLG `00 (BTUH) CU MOD # 3 8 CMCO 24 3 I LATENT CLG 00 (BTUH) AHU MOD # Ff= (CaAQ Z4 C05 I TOTAL CLG > zoo (BTUH) HEATING INPUT 1 'l d(:�2 i; (BTUH) I TONAGE TD HEATING OUTPUT ('10 G rj (BTUH) I (S)EER i I•O 1191r-- HEATING CFM A(00 (BTUH) I COOLING CFM g0 AFUE/HSPF I TYPE S I'L17" I I I ` Procedure A Winter Infiltration HTM I -----•-------------------------------------------------------------------------------------I 1 1. Winter Infiltration CFM Envelope Evaluation #2 (Good/Average) I I 2.2 Air Changes per hour x 5528 Cubic ft. x .0167 = 203.1 CFM I I I 12. Winter Infiltration Btuh I I 1.1 x 203.1 CFM x 22- Degrees Winter TD = 4915.0 BTUH I ' I I 13. Winter Infiltration HTM I I 4915 Btuh / 89 Sq.Ft of total Glass & Door areas = 55.2 HTM I I I I I Procedure B Summer Infiltration HTM I -------------------------------------------------------------------------------------------I 11. Summer Infiltration CFM Envelope Evaluation #2 (Good/Average) I I .8 Air Changes per hour x 5528 Cubic ft. x .0167 = 73.9 CFM I I I 12. Summer Infiltration Btuh 1 I 1.1 x 73.9 CFM x 14 Degrees Summer TD = 1137.4 BTUH I I I 13. Summer Infiltration HTM I I 1137.4 Btuh / 89 Sq.Ft of total Glass & Door areas = 12.8 HTM I I I I Procedure C Latent Infiltration s •••• 1•••• -------------------- • I 0.68 x 56 grains difference @ 50 RH x 73.9 CFM 2812A-BTUH I: Procedure D Equipment Sizing • •••• I•••••• ___ _ 11. Sensible Sizing Load I•••••• -I Sensible Ventilation Load • I 1.1 x 50 VENT CFM x 14 Degrees Summer TD =•••••• 770.40•BTUH I� I Sensible Load for Structure +: E049.05-BTUH I•• ••• . I Sum of Ventilation & Structure Loads = ••••11819.•9•BTUH I ° I Rating & Temperature Swing Multiplier (3.0°@ 95°) x• 1.0 RSM I••••• Equipment Sizing Load .- Sensible = 11819.9 BTUH I• I I 12. Latent Sizing Load I I I I Latent Ventilation Load I I 0.68 x 50 VENT CFM x 56 differance = 1904.0 BTUH I I Internal Loads = 230 Btuh x 4 people + 920.0 BTUH i I Infiltration Load from Procedure C + 2814.1 BTUH I I Equipment Sizing Load - Latent = 5636.4 _BTUH I I I S.C.= Single Clear S.T. = Single Tint S.R. = Single,Reflective , D.C.--Double Clear D.T.',:= Double Tint I D.R. = DoublelReflective T.C:=•Triple Clear I T.T:""="Triple Tint T.R. = Triple'Reflective Shdg= Shading I Ovhg = Overhang I Btm = Bottom I Hgt = Height I Sc = Shading Coefficient * Inside Shading N.S.= No shades I D/B = Drapes or Blinds I R.S. = Roller Shades * Other * Whtm = Winter Heat Transfer Multiplier I Shtm = Summer Heat Transfer Multiplier Infiltration Vs: 1. .Sub Standard/Poor 12. .Standard 13. .Better 14. .Excellent Building Componet Heat Loss & Gain Calculations Dir. Ext.Shdg Type Shdg OvHg Botm Hgt Sc Area Whtm Loss/Btuh Shtm Gain/Btuh N -No Shdg Fctr S.C. N.S. 1.0 4.0 n/a 1.0 24.0 25.4 609.6 26.2 628.8 S -All Shaded S.C. N.S. 1.0 4.0 3.0 1.0 39.0 25.4 990.6 26.2 1021.8 --------------------------------------------------------------------------------------------- W -Shaded Area S.C. N.S. 1.0 4.0 3.0 1.0 1.4 26.2 36.7 W -Solar Area S.C. N.S. 1.0 4.0 3.0 1.0 24.6 84.2 2071.3 W -Total Area S.C. N.S. 1.0 4.0 3.0 1.0 26.0 25.4 660.4 --------------------------------------------------------------------------------------------- Glass Infiltration: 89.0 38.1 3390.9 8.8 783:2 Glass Sub Totals: 89.0 5651.5 4541.8 ---------- ____________________________________________ Componet Type Exposure R-Value Area Whtm Loss/Btuh , Shtm Gain/Btuh N/W C.B. - Int Insul Exterior 0 528.0 11.2 5913.6 7.3 3854.4 •• ••• Solid Core/Wood Exterior n/a 20.0 12.3 246.0 :11il: 242.0 .Solid Core/Wood Adjacent n/a 20.0 8.5 170.0 X917: •••194.0 •• • .,Door Infiltration: 40.0 38.1 1524.0 ••8.8 „32.0 ;••••; :'Slab on Grade 0 82.15 17.8 1462.3 0• •••• : 0 •••••• -,Under Attic 9.0 691.0 0.7 483.7 :•?.7: 1> 65.7 • • • .. ...... • • :000:0 O • •••• •••• • • . . . .... .. . Miami-Dade County Fire EngangeridR:• •• ••; • w•••• • Your master Fire Department Application number is: 00 192 Please'use this number when calling for all Fire Department inspections concerning this project. This includes final C.O.-inspections;-T.C.O. inspections;"prel�iminary,inspections, fire.alarm;• fire suppression systems, sprinkler systems; hood,systems, etc. . Your Fire Department Application,number-for'this'plan lfiit is.necessary to=Bring this.plan back,for aLreworlc_orYa reision,theminelude.this - number- an your application for rework-or revisiorr,and.include the-previously: approved or disapproved drawings in your submittal. For all Fire Department inspections call 305-375-2771 the day before you want the inspection. Please have the master Fire Department Application number, the process number (Miami-Dade county permits only.) and the permit number, the correct address, a contact name and phone number (no beepers), the square footage of the project and the number of stories to be inspected if applicable. You must specify what type of inspection you are requesting such as a final C.O. inspection, T.C.O. inspection, preliminary inspection, fire alarm r acceptance test , fire suppression systems, sprinkler systems, hood systems, etc. All inspections should be called in by the general contractor or their representative since all inspection fees will be charged against the master Fire Department Application number. Your inspection may be delayed if this information is not supplied. y ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD } ESTIMATED ENERGY PERFORMANCE SCORE* =83.3 The higher the score,the more efficient the home. CALWELL, INC., 6116 SW 62 Terrace, SO. MIAMI, FL, 33143- 1. New construction or existing Addition — 12. Cooling systems mil 2. Single family or multi-fay Multi-family _ a. Central Unit Cap: 100.0 kBtu/hr — 3. Number of units,if multi-family 32 — SEER: 11.00 — 4. Number of Bedrooms 2 — b.N/A T 5. Is this a worst case? Yes 6. Conditioned floor area(11) 691 fl2 c. N/A — 7. Glass area&type — — a. Clear-single pane 89.0 tie — 13. Heating systems b. Clear-double pane 0.0 112 — a. Electric Strip Cap: 100 0 kBtu/hr — c. Tint/other SC/SHGC-single pane 0.0112 _ COP: 1.00 — d.Tint/other SC/SHGC-double pane 0.0 112 b.N/A — 8. Floor types a. Slab-On-Grade Edge Insulation R=0.0,82.2(p)ft — c. N/A : • . — '• ' 00 0 b.N/A •0 *see c. N/A 14. Hot water systems 0 0 6..6 • 9. Wall types — a. Electric Resistance ;'• Cap.40.0 gallpns — • a. Concrete,Int Insul,Exterior R=0 0,528.0 112 — : '.: 99:0&8 — b.N/A — b.N/A • i '••' — •••••• c. N/A •... • • .' d. N/A c. Conservation credits _ •••••• e. N/A — (1-llt-Heat recovery,Solar •• 10. Ceiling types _ DHP-Dedicated heat pump) ' 0000 •••••• a. Under Attic R=9.0,691.0 fl2 — 15. HVAC credits ;"": "CO3 — ' • b. N/A _ (CF-Ceiling fan,CV-Cross ventilation, ; ; .0000. c. N/A HF-Whole house fan, 0000' 0000 ' ' 11. Ducts — PT-Programmable Thermostat, a. Sup:Con. Ret:Con. AH:Interior Sup.R=6.0,30.0 11 — RB-Attic radiant barrier, b.N/A MZ-C-Multizone cooling, MZ-H-Multizone heating) I certify that this home has complied with the Florida Energy Efficiency Code For Building Construction through the above energy saving features which will be installed(or exceeded) �04THE STgT�o in this home before fmal inspection.Otherwise,a new EPL Display Card will be completed . based on installed Code compliant features. Guilder Signature: Date: y Address of New Home: City/FL Zip: WE *NOTE. The home's estimated energy performance score is only available through the FLARES computer program. This is not a Building Energy Rating. If your score is 80 or greater(or 86 for a US EPA/DOE EnerSyStdP designation), your home may qual ify for energy efficiency mortgage(EEM)incentives if you obtain a Florida Energy Gauge Rating. Contact the Energy Gauge Hotline at 4071638-1492 or see the Energy Gauge web site at www.fsec.ucf edu for information and a list of certified Raters. For information about Florida's Energy Efficiency Code For Building Construction, contact the Department of Community Affairs at 8501487-1824. EnergyGauge®(Version:FLRCNA-200) 77FORM' 60'OA-97 ' I, Code Compliance Checklist Residential Whole Building Performance Method A - Details ADDRESS:6116 SW 62 Terrace, SO. MIAMI, FL, 33143- PERMIT#: 6A-21 INFILTRATION REDUCTION COMPLIANCE CHECKLIST COMPONENTS SECTION REQUIREMENTS FOR EACH PRACTICE CHECK Exterior Windows&Doors 606.1.ABC.1 1 Mawmum:.3 cfm/sq ft.window area;.5 dnllsq ft.door area Exterior&Adjacent Walls 606.1.ABC 1.2 1 Caulk,gasket,weatherstrip or seal between windows/doors&frames,surrounding wall; �- foundation&wall sole or sill plate;joints between extenor wall panels at comers,utility penetrations;between wall panels&top/bottom plates,between walls and floor. EXCEPTION.Frame walls where a continuous infiltration bamer is installed that extends from,and is sealed to,the foundation to the top plate Floors 606.1 ABC.1 2.2 Penetrations/openings>1/8"sealed unless backed by truss orjoint members EXCEPTION.Frame floors where a continuous infiltration bamer is installed that is sealed to the penmeter,penetrations and seams. Ceilings 606.1.ABC.1.2.3 Between walls&ceilings;penetrations of ceiling plane of top floor,around shafts,chases, soffits,chimneys,cabinets sealed to continuous air bamer,gaps in gyp board&top plate; attic access.EXCEPTION:Frame ceilings where a continuous infiltration bamer is installed that is sealed at the perimeter,at penetrations and seams. _ • • Recessed Lighting Fixtures 6061 ABC.1.2.4 Type IC rated with no penetrations,sealed,or Type IC or non-IC rated+lhatrIV inside a f/ sealed box with 1/2"clearance&3"from insulation,or Type IC rated v$th S2.Q cfm fire"' /Y • conditioned space,tested. • Multi-story Houses 606.1.ABC.1.2.5 Air bamer on perimeter of floor cavity between floors. • • • • • Additional Infiltration reqts 606.1.ABC.1.3 Exhaust fans vented to outdoors,dam • pars;combustion space heaterS�nply�with NFPA, have combustion air. • • • • • •• •••••• 6A-22 OTHER PRESCRIPTIVE MEASURES must be met or exceeded by all residences. .... COMPONENTS SECTION REQUIREMENTS CHE(?I�! • Water Heaters 612.1 Comply with efficiency requirements in Table 6-12.Smtch or clearly mahedtircuit breaker electric or cutoff gas must be provided.External or built-in Beat trap required.0 0 0•• : "; x Swimming Pods&Spas 612.1 Spas&heated pods must have covers(except solar heated).Non-commere4pools 9600 0 must have a pump timer Gas spa&pod heaters must have a minimut ntpe�r Ml •����• ��� lee 0 efficient of 78%. • Shower heads 612.1 Water flow must be restricted to no more than 2.5 gallons per minute at 80 PSIG. .• Air Distribution Systems 610.1 All ducts,fittings,mechanical equipment and plenum chambers shall be mechanically attached,sealed,insulated,and installed in accordance with the criteria of Section 610. 1 Ducts in unconditioned attics:R-6 min insulation. -- --- ---------------- --------------- ---------- ------ - - - - - - - ----- -- ------------------------- --- -- WAC Controls 607.1 Separate readily accessible manual or automatic thermostat for each system. Insulation 604.1,602.1 Ceilings-Min R-19.Common walls-Frame R-11 or CBS R-3 both sides. �. Common ceding&floors R-11. 'C_X/97//V61 R 9 EnergyGaugeTm DCA Form 600M97 EnergyGauge®/FlaRES'97 FLRCNA-200 77FORM' 600A-97 �.,. Code Compliance Checklist Residential Whole Building Performance Method A - Details ADDRESS:6116 SW 62 Terrace, SO. MIAMI, FL, 33143- PERMIT#: 6A-21 INFILTRATION REDUCTION COMPLIANCE CHECKLIST COMPONENTS SECTION REQUIREMENTS FOR EACH PRACTICE CHEC Exterior Windows&Doors 606.1 ABC.1.1 Maximum..3 cfm/sq ft window area 5 dm/s .ft door area. Exterior&Adjacent Walls 606.1.ABC.1.2.1 Caulk,gasket,weatherstrip or seal between:windows/doors&frames,surrounding wall; foundation&wall sole or sill plate;joints between exterior wall panels at comers;utility / penetrations,between wall panels&top/bottom plates,between walls and floor. EXCEPTION-Frame walls where a continuous infiltration bamer is installed that extends from,and is sealed to,the foundation to the top plate Floors 606.1.ABC.1.2 2 Penetrations/openings>1/8"sealed unless backed by truss or joint members. EXCEPTION.Frame floors where a continuous infiltration bamer is installed that is sealed to the penmeter,penetrations and seams.__ Ceilings 606.1.ABC.1.2.3 Between walls&ceilings;penetrations of ceiling plane of top floor,around shafts,chases, soffits,chimneys,cabinets sealed to continuous air barrier,gaps in gyp board&top plate, attic access EXCEPTION:Frame ceilings where a continuous infiltration bamer is installed that is sealed at the penmeter,at penetrations and seams. Recessed Lighting Fixtures 606 1 ABC.1.2.4 T —� • ' g g Type IC rated with no penetrations,sealed,or Type IC or non-IC rated ihst�M�J inside a sealed box with 1/2"clearance&3"from insulation;or Type IC rated%0th S2.Q cfm frgpi"' /V • • conditioned space,tested '• ' "" ' '• Multi-story Houses 606.1.ABC.1 2 5 Air bamer on perimeter of floor cavity between fkxors. • •••:•. •• Additional Infiltration regts 606.1.ABC.1.3 Exhaust fans vented to outdoors,dampers;combustion space heaters:dTply�nnth NFPA, • � have combustion air. • • • 6A-22 OTHER PRESCRIPTIVE MEASURES must be met or exceeded by all residences. .... .• COMPONENTS SECTION REQUIREMENTS • _CHEOfE ••• Water Heaters 612.1 Comply with efficiency requirements in Table 6-12.Switch or clearly matked Circuit breaker electric or cutoff(gas)must be provided.Extemal or built-in Meat trap required*•••. :• �'; ,. Swimming Pods&Spas 612.1 Spas&heated pods must have covers(except solar heated).Non-commercial pods must have a pump timer.Gas spa&pod heaters must have a minimufi Tem•t61 •••••• A0 efficienc of 78%. _ Shower heads 612.1 Water flow must be restricted to no more than 2.5 gallons per minute at 80 PSIG. Air Distribution Systems 610.1 All ducts,fittings,mechanical equipment and plenum chambers shall be mechanically attached,sealed,insulated,and installed in accordance with the criteria of Section 610. ' Ducts in unconditioned attics:R-6 min insulation --- ----------------- ---------------- -- -------------- ---- - - -- - - - - ----- - ----------------- —---- - HVAC Controls 607.1 Separate readily accessible manual or automatic thermostat for each system _ Insulation 6041,602.1 Ceilings-Min R-19.Common walls-Frame R-11 or CBS R-3 both sides. Common ceiling&floors R-11. X/57/NGr- —9 EnergyGauge7m DCA Form 600M97 EnergyGauge®/FlaRES'97 FLRCNA-200 FORM 60OA►-97 Code Compliance Checklist Residential Whole Building Performance Method A - Details ADDRESS:6116 SW 62 Terrace, SO. MIAMI, FL, 33143- PERMIT#: 6A-21 INFILTRATION REDUCTION COMPLIANCE CHECKLIST COMPONENTS SECTION REQUIREMENTS FOR EACH PRACTICE CHEC Exterior Windows&Doors 606.1.ABC.1.1 Maximum:.3 cfm/sq ft.window area .5 cfm/sq ft.door area Exterior&Adjacent Walls 606.1.ABC.1.2.1 Caulk,gasket,weatherstrip or seal between:windows/doors&frames,surrounding wall, foundation&wall sole or sill plate;joints between exterior wall panels at comers,utility / penetrations,between wall panels&top/bottom plates;between walls and floor. EXCEPTION.Frame walls where a continuous infiltration bamer is installed that extends from,and is sealed to,the foundation to the top plate Floors 606.1.ABC.1.2 2 Penetrations/openings>1/8"sealed unless backed by truss or point members. EXCEPTION.Frame floors where a continuous infiltration bamer is installed that is sealed to the penmeter,_pen etrations and seams.______ Ceilings 606 1.ABC.1.2.3 Between walls&ceilings;penetrations of ceiling plane of top floor,around shafts,chases, soffits,chimneys,cabinets sealed to continuous air barrier;gaps in gyp board&top plate; V/ attic access.EXCEPTION-Frame ceilings where a continuous infiltration barrier is installed that is sealed at thepenmeter,at eenetrabons and seams. _ __ • Recessed Lighting Fixtures 606.1.ABC 1.2.4 Type IC rated with no penetrations,sealed,or Type IC or non-IC rated+1h8tpftV inside a t/ sealed box with 1/2"clearance&3"from insulation;or Type IC rated v:th{2.Q cfm fre /V • conditioned space,tested. " ' "" ' Multi-story Houses 606.1.ABC.1.2.5 Air bamer on perimeter of floor cavity between floors. • : • Additional Infiltration regts 606.1.ABC.1.3 Exhaust fans vented to outdoors,dampers;combustion space heatersdqnply.With NFPA, have combustion air • • • V • • •• •••••• 6A-22 OTHER PRESCRIPTIVE MEASURES must be met or exceeded by all residences.• .... .' COMPONENTS SECTION REQUIREMENTS CHEM ••• Water Heaters 612.1 Comply with efficiency requirements in Table 6-12.Switch or clearly matkedbrcut ' breaker(electric)or cutoff(gas)must be provided.External or built-in}'seat t�required* Swimming Pods&Spas 612.1 Spas&hued pods must have covers(except solar heated).Non-cozmercNo pods must have a pump timer.Gas spa&pod heaters must have a minimuM tpe�rjr191 •����• /Vl/N � efficiency of 78%. • Shower heads 6121 Water flow must be restricted to no more than 2.5 gallons per minute at 80 PSIG. !�! Air Distribution Systems 610.1 Ali ducts,fittings,mechanical equipment and plenum chambers shall be mechanically attached,sealed,insulated,and installed in accordance with the criteria of Section 610. ' Ducts in unconditioned attics:R-6 min.insulation. WAC Controls 607.1 Separate reader accessible manual or automatic thermostat for each system. _ Insulation 604.1,602.1 Ceilings-Min.R-19.Common walls-Frame R-11 or CBS R-3 both sides. _ Common ceding&floors R-11 EnergyGaugeTM DCA Form 60OA-97 EnergyGauge®/FlaRES'97 FLRCNA-200 F\ f FORM 60OA-97 WATER HEATING & CODE COMPLIANCE STATUS Residential Whole Building Performance Method A - Details f ADDRESS:6116 SW 62 Terrace, SO. MIAMI, FL, 33143- PERMIT#: BASE AS-BUILT WATER HEATING Number of X Multiplier = Total Tank EF Number of X Tank X Multiplier X Credit = Total Bedrooms Volume Bedrooms Ratio Multiplier 2 2370.00 4740.0 40.0 0 88 , 2 1.00 2369.00 1.00 4738.0 As-Built Total: 4738.0 CODE COMPLIANCE STATUS . BASE AS-BUILT. Cooling + Heating + Hot Water = Total Cooling + Heating + Ho!44d _...otal •••• Points Points Points Points Points Points Points e••rtints 7161.5 529.4 4740.0 12431.0 5996.2 1508.4 4138.0 12242.6 ee .. . . .. ...... sese s • e • • eeeee• • • • • •eeee• PASS . .... ...... o .... .... . . 04-TRE ST4T6 . ..:.. 0 • rl,COb WE EnergyGaugeTm DCA Forth 600A-97 FORM 60OA-97 WINTER CALCULATIONS Residential Whole Building Performance Method A - Details ADDRESS, 6116 SW 62 Terrace, SO. MIAMI, FL, 33143- PERMIT#: BASE AS-BUILT GLASS TYPES .18 X Conditioned X BWPM = Points Overhang Floor Area Type/SC Ornt Len Hgt Area X WPM X WOF = Points .18 691.0 2.02 251.8 Single,Clear W 1.0 0.0 240 4.47 1.00 107.0 Single,Clear E 1.0 00 39.0 376 1.01 147.9 Single,Clear S 0.0 0.0 260 3.55 1.00 92.2 As-Built Total: 89.0 347.2 WALL TYPES Area X BWPM = Points Type R-Value Area X WPM = Points Adaicent 0.0 0.0 00 Concrete,Int Insul,Exterior 00 5280 1.90 10032 • •• Extenor 5280 0.60 3168 • • • •••• •• • Base Total: 528.0 316.8 As-Built Total: 528.. .•'•' '.,,..1003.2 .... DOOR TYPES Area X BWPM = Points Type Area.X VVPM ,.•Points ....• Adjacent 20.0 1.30 26.0 Exterior Wood 201 '.:2.80 .. 56.0 Exterior 20.0 1.80 36.0 Adjacent Wood 200 1.90 **9038.0 ••••• • Base Total: 40.0 62.0 As-Built Total: 40+0 •••••94.0 0 0 0 0 • CEILING TYPESArea X BWPM = Points Type R-Value Area,S( WPM :.;Points ,.• 00*Under Attic 691.0 0.10 691 Under Attic 90 691060 0.57 391.6 Base Total: 691.0 69.1 As-Built Total: 691.x'" •••• 391.6 FLOOR TYPES Area X BWPM = Points Type R-Value Area X WPM = Points Slab 82.2(p) -21 -172.5 Slab-On-Grade Edge Insulation 00 82.2(p) -2.10 -172.5 Raised 00 000 0.0 Base Total: -172.5 As-Built Total: -172.5 INFILTRATION Area X BWPM = Points Area X WPM = Points 691.0 -0.06 -415 691.0 -006 -41.5 Winter Base Points: 485.7 Winter As-Built Points: 1622.0 Total Winter X System = Heating Total X Cap X Duct X System X Credit = Heating Points Multiplier Points Component Ratio Multiplier Multiplier Multiplier Points 1622.0 1.000 0.930 1.000 1.000 1508.4 485.7 1.0900 529.4 1622.0 1.00 0.930 1.000 1.000 1508.4 EnergyGaugeT"DCA Form 60OA-97 FORM 60OA-97 SUMMER CALCULATIONS Residential Whole Building Performance Method A - Details ADDRESS:6116 SW 62 Terrace, SO. MIAMI, FL, 33143- PERMIT#: 6 BASE AS-BUILT GLASS TYPES .18 X Conditioned X BSPM = Points Overhang Floor Area Type/SC Ornt Len Hgt Area X SPM X SOF = Points .18 691.0 53.20 6617.3 Single,Clear W 1.0 0.0 24.0 65.53 0.99 1559.7 Single,Clear E 1.0 0.0 39.0 73.03 0.99 2820.7 Single,Clear S 0.0 0.0 26.0 62.19 1.00 1617.0 As-Built Total: 89.0 5997.5 WALL TYPES Area X BSPM = Points Type R-Value Area X.SPM = Points Adalcent 0.0 0.0 0.0 Concrete,Int Insul,Exterior 0.0 528.0 4.20 2217.6 • • Extenor 528.0 2.70 1425.6 '•'"• • • • • • •• • Base Total: 528.0 1425.6 As-Built Total: 528' .'.' '::::M17.6 ••0• n DOOR TYPES Area X BSPM = Points Type Area X SPM ..'Points ....• Adjacent 20.0 2.60 52.0 Exterior Wood 20:0 •.:9.40 .. . 188.0 Exterior 20.0 6.40 128.0 Adjacent Wood 200 3.80 : *•.•76.0 •••.• • Base Total: 40.0 180.0 As-Built Total: 40,'0 0 0 0 •••"e64.0 a..:o CEILING TYPES Area X BSPM = Points Type R Value Areq-X •SPM :,:Points Under Attic 691.0 0.80 5528 Under Attic 9.0 691!0•** 3.00 0 0*02073.0 . • .••. •.•• Base Total: 691.0 552.8 As-Built Total: 6911••• 00002073.0 • • FLOOR TYPES Area X BSPM = Points Type R-Value Area X SPM = Points Slab 82.2(p) -20.0 -1643.0 Slab-On-Grade Edge Insulation 00 82 2(p) -2000 -1643.0 Raised 0.0 0.00 0.0 Base Total: -1643.0 As-Built Total: -1643.0 INFILTRATION Area X BSPM = Points Area X SPM = Points 691.0 18.79 12983.9 691.0 18.79 12983.9 Summer Base Points: 20116.6 Summer As-Built Points: 21893.0 Total Summer X System = Cooling Total X Cap X Duct X System X Credit = Cooling Points Multiplier Points Component Ratio Multiplier Multiplier Multiplier Points 21893.0 1.000 0.930 0 310 0.950 59962 20116.6 0.3560 7161.5 21893.0 1.00 0.930 0.310 0.950 5996.2 EnergyGaugeT"DCA Form 60OA-97 FORM 60OA-97 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs Residential Whole Building Performance Method A Project Name: 0022 Builder: Address: 6116 SW 62 Terrace Permitting Office: City, State: SO. MIAMI, FL 33143- Permit Number: Owner: CALWELL, INC. Jurisdiction Number: Climate Zone: South 1 New construction or existing Addition — 12 Cooling systems 2. Single family or multi-family Multi-family — a. Central Unit Cap: 100.0 kBtu/hr — 3. Number of units,if multi-family 32 — SEER: 11.00 — 4. Number of Bedrooms 2 _ b.N/A _ 5. Is this a worst case? Yes 6 Conditioned floor area(112) 691 112 c. N/A — 7. Glass area&type — — a Clear-single pane 89.0 112 — 13. Heating systems b.Clear-double pane 0.0 112 — a Electric Strip trap: 100.0 kBtu/hr — c. '1'int/othcr SC/SHGC-single pane 0.0112 — COP: 1.00 — d.Tint/other SC/SHGC-double pane 0.0 112 b.N/A •• • 8. Floor types — • • • — • • • . . . .... .. . a. Slab-On-Grade Edge Insulation R=0.0,82.2(p)R — c. N/A •••• ••• — •• b. N/A • . . c. N/A 14 Hot water systems . . •. • •.•. 9. Wall types — a. Electric Resistance :•. Cap:40.0 gallons — a. Concrete,Int Insul,Exterior R=0.0,528.0 1112 — •.: U 0.98 — b.N/A b N/A • : •.• ..... c N/A 0000 • • • — • • 0000•• — • d.N/A c. Conservation credits • • • ••••• e. N/A (HR-1 feat recovery,Solar • • • • 10. Ceiling types . 0000 000 0:— DHP-Dedicated heat pump) _• a. Under Attic R=9.0,691.0 R2 — 15. HVAC credits :••••; ••CV, — •-- b.N/A — (CF-Ceiling fan,CV-Cross ventilation, .'•'% •:••0 c. N/A HF-Whole house fan, •••• ••• : 11. Ducts — PT-Programmable Thermostat, a. Sup:Con. Ret•Cop.. AH:Interior Sup.R=6.0,30.011 — RB-Attic radian',barrier, b. N/A MZ-C-Multizonc cooling, MZ-11-Multizone heating) Glass/Floor Area: 0.13 Total as-built points: 12243.00 PASS Total base points: 12431.00 I hereby certify that the plans and specifications covered Review of the plans and �x> sT by this calculation are in compliance with the Florida specifications covered by this *VoF _ qrF Energy Code. calculation indicates compliance PREPARED with the Florida Energy Code. DATE: fore construction is completed a° this building will be inspected for , I hereby certify that this building, as designed, is in compliance with Section 553.908 r•►. y� compliance with the Florida Energy Code. WE Florida Statutes. cOb �`� OWNER/AGENT: BUILDING OFFICIAL: DATE: DATE: EnergyGauge®(Version: FLRCNA-200) Summary Energy Code Results Residential Whole Building Performance Method A CALWELL, INC. Project Title: Class 3 Rating 6116 SW 62 Terrace 0022 Registration No. 0 SO. MIAMI, FL 33143- Climate: South 6/5/00 Building Loads Base As-Built Summer: 20117 points Summer: 21893 points Winter: 486 points Winter: 1622 points Hot Water: 4171 points Hot Water: 4171 points ' . . . . . .... .. . Total. 24774 points Total: 27686 points .. .... . . .. ...... Energy Use •••• •' Base As-Built "••'• Cooling: 7162 points Cooling: 5996 poifff,4 Heating: 529 points Heating: 1508 points Hot Water: 4740 points Hot Water: 4738 points Total: 12431 points Total: 12243 points PASS e-Ratio: 0.98 EnergyGauge@(Version: FLRCNA-200) RESIDENTIAL HEAT GAIN / HEAT LOSS CALCULATION (BASED ON A.C.C.A. MANUAL J - SEVENTH EDITION (c) 1986 by A.C.C.A.) --------/�------------------------------------------------------------------------------------ Project 0022 IPrepaired by: Address` 6116 SW 62 Terrace ISouthern Energy Eval. Serv. City SO. MIAMI 1122 East Minnesota Avenue State/Zip FL 33143- (Orange City,Fl 32763 Owner : MARIA RAMON & ALBERT CABRERAS ITEL:1-800-329-SEES (7337) Builder . 'NULL IFAX:1-800-639-SEES (7337) HVAC Contr lemail:sees @iag.net --------------------------------------------------------------------------------------------- Cond Floor Area = 691 (Total Glass Area = 89 Conditioned Floor Area to Total Glass Area Ratio = 12.9% I- --------------------------------------------------------------------------------------------- * USA Climatic Conditions & Design Conditions * -----»---------------------------------------------------------------------------------------- Geographical Location I Maimi AP, Florida North Latitude / Elevation 1 25° 9Ft. Above Sea Level Outdoor Winter Dry Bulb 1 480 Indoor Winter Dry Bulb 1 700 Winter Temperature Diff. (wTd) 1 220 Outdoor Summer Dry Bulb 1 890 Outdoor Summer Wet Bulb 1 770 Outdoor Summer Hum. Ratio Gr/Lb 1 49 Indoor Summer Relaltive Hum. 1 50% Indoor Summer Design Gr/Lb. 1 56 , Indoor Summer, Dry Bulb 1 750 ' Summer Temperature Diff. (sTd) 1 14° Summer Daily Range 1 15° (Low Deviation) ...... --------------------------------------------------------------------------• * HEATING SUMMARY * 0022-1.ENB * COOLING SdCtVUA * •....• •... -------------------------------------------------------------------------- SUBTOTAL 15451.1 1 STRUCTURE SENSIBLE . *•.21049.9*....* I OCCUPANTS :'• •1200.0• I APPLIANCES 1200.0 1 SUBTOTAL SENSIBLE _ *13449.9...... DUCT LOSS + 0 1 DUCT GAIN Sees+ . . 0 .� TOTAL LOSS = 15451.1 1 TOTAL SENSIBLE o :- :**13449.9....:. MECHANICAL VENT.- 50 CFM = 1210.0 1 MECHANICAL VENT.- 50 CFA. ._ . 770.0 1 TEMP.SWING 3.00@ 950 . x ..e. 1.0:....i MINIMUM EQUIPMENT LOSS = 16661.1 1 MINIMUM EQUIPMENT SENSIB1,S.e9rr *0*14219.9 ------------------------------------------------1-------------------------' 20% OVERSIZE LOSS = 3332.2 120% OVERSIZE SENSIBLE 00.00• *0002144.0 EQUIPMENT LOSS + 16661.1 1 EQUIPMENT SENSIBLE . + 14219.9..:..* MAXIMUM EQUIPMENT LOSS = 19993.3 1 MAXIMUM EQUIPMENT SENSIBLE = 17063.9* ------------------------------------------------I-------------------------------------------- I TOTAL LATENT = 5636.4 1 EQUIPMENT SENSIBLE + 14219.9 1 EQT.SENSIBLE + LATENT = 19856.3 --------------------------------------------------------------------------------------------- * AIR FLOW FACTORS * --------------------------------------------------------------------------------------------- HEATING FACTOR (BTUH/CFM) = 20.0 1 COOLING FACTOR (BTUH/CFM) = 12.7 HEATING CFM = 833.1 1 COOLING CFM = 928.7 --------------------------------------------------------------------------------------------- * EQUIPMENT SELECTION * --------------------------------------------------------7------------------------------------ EQT. MANUF cARrziEF- I SENSIBLE CLG Cc,q00 (BTUH) CU MOD # 3 8 CMCO 24 3 I LATENT CLG 00 (BTUH) AHU MOD # FI= ICNAOZ4 005 1 TOTAL CLG > ZOO (BTUH) HEATING INPUT a -ro � 'l �� � (BTUH) 1 TONAGE HEATING OUTPUT D (BTUH) I (S)EER I I-O E HEATING CFM Pi0 a (BTUH) I COOLING CFM g00 AFUE/HSPF I TYPE 5 PC i r VU11,.rU14 .LV1♦ L1VVl.UUiGJ C.�U�V�L I I I Procedure A Winter Infiltration HTM I -=-----------------------------------------------------------------------------------------I 11. Winter Infiltration CFM Envelope Evaluation #2 (Good/Average) I I 2.2 Air Changes per hour x 5528 Cubic ft. x .0167 = 203.1 CFM I I I 12. Winter Infiltration Btuh I I 1.1 x 203.1 CFM x 22 Degrees Winter TD = 4915.0 BTUH I ' I - I 13. Winter Infiltration HTM 1 1 4915 Btuh / 89 Sq.Ft of total Glass & Door areas = 55.2 HTM 1 I I I I 1 Procedure B Summer Infiltration HTM I 1-------------------------------------------------------------------------------------------I 1 1. Summer Infiltration CFM Envelope Evaluation #2 (Good/Average) 1 1 .8 Air Changes per hour x 5528 Cubic ft. x .0167 = 73.9 CFM 1 I I 12. Summer Infiltration Btuh I I 1.1 x 73.9 CFM x 14 Degrees Summer TD = 1137.4 BTUH I I I 13. Summer Infiltration HTM 1 1 1137.4 Btuh / 89 Sq.Ft of total Glass & Door areas = 12.8 HTM 1 I I I I. I Procedure C Latent Infiltration ...... ' ' ' .I • s • . • • • • 1---------------------------------------------------------------------------r T----••*cam-----`• • I 0.68 x 56 grains difference @ 50 RH x 73.9 CFM 2813.4.13TUH 1... I Procedure D Equipment Sizing .. 1 . . 11. Sensible Sizing Load I 1 Sensible Ventilation Load •� I I 1.1 x 50' VENT CFM x 14 Degrees Summer TD ► 77@,,4 BTUH:4...: I Sensible Load for Structure .t..... 11010..8•'BTUH: 1 :- I Sum of Ventilation & Structure Loads 118lik& BTUH.4••. I Rating & Temperature Swing Multiplier (3.0°@ 95°) lso•..o *.I.."ORSM 1: I Equipment Sizing Load - Sensible 11819.9 BTUH.4:..' I • I -t, 12. Latent Sizing Load I I I I Latent Ventilation Load 1 I 0.68 x 50 VENT CFM x 56 differance = 1904.0 BTUH 1 I Internal Loads = 230 Btuh x 4 people + 920.0 BTUH I I Infiltration Load from Procedure C + 2814.1 BTUH I I Equipment Sizing Load - Latent = 5636.4 BTUH 1 I I * Glass/Windows * S.C.= Single Clear I S.T. = Single Tint I S.R. = Single Reflective D.C.= Double Clear I D.T. = Double Tint I D.R. = Double Reflective T.C.= Triple Clear I T.T. = Triple Tint I T.R. = Triple Reflective Shdg=' Shading I Ovhg = Overhang I Btm = Bottom I Hgt = Height I Sc = Shading Coefficient * Inside Shading N.S.= No shades I D/B = Drapes or Blinds I R.S. = Roller Shades * Other * Whtm = Winter Heat Transfer Multiplier I Shtm = Summer Heat Transfer Multiplier Infiltration Vs: l. .Sub Standard/Poor 2. .Standard 13. .Better 14. .Excellent ---------------- ---------- ---- ------------- ---- Building Componet Heat Loss & Gain Calculations Dir. Ext.Shdg Type Shdg OvHg Botm Hgt Sc Area Whtm Loss/Btuh Shtm Gain/Btuh N -No Shdg Fctr S.C. N.S. 1.0 4.0 n/a 1.0 24.0 25.4 609.6 26.2 628.8 S -All Shaded S.C. N.S. 1.0 4.0 3.0 1.0 39.0 25.4 990.6 26.2 1021.8 ------=-------------------------------------------------------------------------------------- W -Shaded Area S.C. N.S. 1.0 4.0 3.0 1.0 1.4 26.2 36.7 W -Solar Area S.C. N.S. 1.0 4.0 3.0 1.0 24.6 84.2 2071.3 W -Total Area S.C. N.S. 1.0 4.0 3.0 1.0 26.0 25.4 660.4 --------------------------------------------------------------------------------------------- Glass Infiltration: 89.0 38.1 3390.9 8.8 783:2 Glass Sub Totals: 89.0 5651.5 4541.8 Componet Type Exposure R-Value Area Whtm Loss/Btuh , Shtm Gain/Btuh N/W C.B. - Int Insul Exterior 0 528.0 11.2 5913.6 7.3 3854.4 Solid Core/Wood Exterior n/a 20.0 12.3 246.0 12.1 242.0•` ••• Solid Core/Wood Adjacent n/a 20.0 8.5 170.0 :":9s7 194.0: Door Infiltration: 40.0 38.1 1524.0 :8l8 •**-**"*-1,52.0 " • Slab on Grade 0 82.15 17.8 1462.3 •� • 0 "" 0•`"`• Under Attic 9.0 691.0 0.7 483.7 2y7 •.:**65.7:0090° 9e • e • • • •• 900••9 •••• • • • • • • • 090.00 9 9 • 0 • • • 9000 99900• ••••0• •00• • 9 • • 0.09 00••9 • •00••