Loading...
00-0045-020 0 m ISSUANCE FOR ❑BIDDING SET ONLY ❑CONSTRUCTION SET ONLY STUCCO 5/8" 1 2" DRYWALL y []BUILDING PERMIT SET ONLY / REVt `i"°•• THICK MIN REV3 ' V P ;• ; J» BEAD CEMENT TILE ROOF '• ' ' `� METAL FLASHING GALVANIZED COVERED W/ 90 LB FELT �''```` t.i,' .'. . SPANISH "S" TILE 12 ......kaR eAL HERE 2 X WD STUD STUCCO ON FLASHING AND 5 @ 24" O.C. COUNTER FLASHING SEE DETAIL D-2 SEE DETAIL D-5 8 MIN . ALUMINUM PAINT ON ALUMINUM FELT ON 1 'r LAYER OF 90+ FELT ON 19/32" CDX PLYWOOD N DECK ATTACHED TO 2 X 4 ( #2 S.Y.P., 19% MC) p P.T WOOD LEDGER W/10d NAILS @ 6, O.C. • o (REFER TO STRUCTURAL DWGS. o '� W FOR SIZE AND METHOD OF R — 19 INSULATION pq ATTACHMENT) 8 H c� HUGHES JHA 213 METAL HANGER AT EACH TRUSS LASH NG DETA L ATTACHED TO LEDGER W/16 16d NAILS AND TO WOOD TRUSS W/ 3 10d NAILS STRUCTURAL 2/2 x 8 PRESSURE TREATED WOOD LEDGER E°I W 1.4 LUMBER (SOUTHERN PINE No.2 OR BETTER W 5/8 DIAMETER x W " GRADE �2 SPICE: SO PIN 7 1 /2" LONG NUT ANCHOR @ 24" O.C. , A A 0 CEMENT TILE ROOF ON A LAYER OF 90 LB. U ASPHALT FELT HOT MOPPED OVER 30 LB. FELT 12 UNDERLAYMENT TIN-TAGGED AT 12" ON CENTER 5 STAGGERED TO 19/32° CDX PLYWOOD SHEATHING is APPROVED METAL ANCHOR 0 EA. TRUSS $ v� - SEE ANCHOR SCHEDULE ON ROOF FRAMING PLAN Not to Scale PERIMETER COURSE OF SPANISH "S" TILE SHALL BE INSTALLED W/CLIPS MECHANICALLY FASTENED TO '• �j SHEATHING PRE-FABRICATED ENGINEERED fs V WOOD TRUSSES AT 24 ON CENTER O ELEV. = SEE ELEV. a c TOP OF TIE BEAM � M O 26 GAUGE 2"x2" GALV. DRIP NAILED WITH 12 GAUGE, 9•. BATT INSULATION, REFER TO I� Pq RING-SHANKED NAILS 4" O.C. TO P.T. 1 x 2 CTUAL R-VALUE RATING.NA LER ON 2 x 8 WD. FASCIA ("NAILED 4" O.C. ®GABLE ENDS) LAPPED MIN. 4 ® PERIMETER AND p : .o . . 1 x 2 FIRE STOP WRAPPED AROUND A MIN. OF 5" AT CORNERS. "• 5/8 TYPE "X" DRYWALL m pip 7/8" STUCCO SOFFIT W/ SCREENED VENT 8"x12" CONT. CONCRETE TIE BEAM W/4#5 CONT. REINFORCED M HOUSE OPENINGS SHALL BE COVERED W/ A CORROSION @ CORNERS & AT EA. BEND ELSEWHERE. BEND RESISTANT MESH WITH OPENINGS NOT Tb EXCEED 1/8" :•� a CMU 2#5 FROM EA. DIRECTION AROUND CORNERS MIN. 0 30" SPANISH "S" TILE ROOF ON A LAYER OF 90 LB. g M 19/32" PLYWOOD DIAPHRAGM W/8d NAILS ° .� IN T. FELT HOT MOPPED OVER 30 LB. FELT ® I T. SUPPORTS AND 6"ox AT PANEL 91 EDGES, EDGE BLOCKING 2" NOMINAL UNDERLAYMENT TIN-TAGGED AT 12" ON CENTER a PLYWOOD SHALL BE GLUED W/ ADHESIVES 5/8" TEXTURED STUCCO FINISH CDX PLYWOOD SHEATHING MEETING REQUIREMENTS OF AFG-01. (TYPICA AND PAINT STAGGERED TO 5/8" coo APPROVED METAL ANCHOR ® EA. TRUSS 2x4 WOOD TRUSS M SEE SHT. D-1 FOR NOTICE OF APPROVAL & �XA ® 24" O/C. NAILING REQUIREMENTS �Y (rn'•) ° ° 5/8 E "x" DRYWALL PERIMETER COURSE OF SPANISH "S" TILE SHALL BE W W ^0 I INSTALLED W/ CLIPS MECHANICALLY FASTENED TO E—+ M 1 x 3 P.T. FIREST � SHEATHING 2-2x8 P.T. WD. LEDGER ATTACHED 1 IN 3000 PSI CONCRETE Y 'gi ,.L W 5/8" DIA. X 7\-LAG BOLT IN BEDDED 8 TYPE °X" DRYW I LLED CELL PROVIDE CLEANOUT Q '� IN CONC. W/ NUT ANCHORS AT 24" ON CENTER AT BOTTOM TO ENSURE 26 GAUGE 2"x2" GALV. DRIP NAILED 6" ���•• a = PROPER FILL FILLED CELL AT ALL O.C. PTO 1"x2" P.T. NAILER ON 1"x8" WD. FASCIA ON ^ a a T 2x4 SUBFASCIA (NAILED 4 O.C. @ GABLE ENDS) .< 1 #43 MODIFIED (TEN CAP) R.S. NAILS 6" O.C. ON LAPS AND 12" OPENINGS, AT ALL CORNERS AND MAX. LAPPED MIN. 4" @ PERIMETER & WRAPPED AROUND ✓�' �''� C' _�z O.C. FIELD 2 #15 FABER BLASS HOT MOPPED 1 LAY CAP $ CMU SPACING INDICATED ON PLANS & A MIN. OF 5" AT CORNERS. o M CD as SHEATING (GRANULAR OVER 5/8" EXTERIOR GRADE con 00 o � o PLAYWOOD ROOF SHEATING NAILED WITH #8d AT 6" O.C. IN l� "' #9 GAUGE TRUSS TYPE HORIZONTAL REINFORCEMENT 8" HOLLOW CONC. BLOCK WALL, W 1 VERT 0 48" 0 C. REINF. AT - 'rr s �, a GALVANIZER COMMON NAILS AND #8d 4" O.C. AT EDGE OF / / e Lo ROOF (PRODUCT CONTROL APPROVED AND A SEPARATE EVERY OTHER COURSE SEE S.F.B.C. 2707.1(F) CELL (9" +/- SLUMP) EACH OPENING IN GROUT FILLED 4" CONCRETE SLAB W/DOUBLE 0 1 j ® "r 4-. PERMITED REQUIRED). WWF 6"x6"-10/10 WELDED WIRE `D �I FABRIC 2500 psi CONC. MIN. __—_ —_ _. I 1 Q N O m ALL SPLICES SHALL BE " .. ._;:: �, �•� W PROVIDE 1 1/2 RECESS AT SLAB PERIMETER U I A MIN. OF 30" CD WF-1616'x12" MONOUTHIG W/2#5 30" DOUBLE WELDED WIRE CD REBAR CONTINUOUS vs HOD (SEE FOUNDATION PLAN) I a a TOP BAR SEE PLA FOR LOCATION " , o T3 a — — MIN. 1" CLEAR EDG DIST NCE " 7/8 STUCCO SOFFIT S.F.B.C. SECT. 3710 6 MINH ------- -------- ----------------- -------------- --- — — — — — —1 — _ i— MIN. 1 CONC. m +, COVER CLEAR 6 CD —1 I i��i� 1 I 5/8" TEXTURED STUCCO FINISH cu C-0 0 0 0 Q 0 \i\\i\\i, i\\ i\\i\\i\\i\\, 00 AND PAINT cn 00� I VAPOR BARRIER CD ru z cu CD 2412" 16" 1 � YIF-24 i WF-161612" o +' MONOUTHIC W/315 w ° REBAR CONTINUOUS MONOLITHIC W/2#5 REBAR CONTINUOUS Z =_ T .I T LL SECTION" {SEE FOUNDATION PLAN) 5 1 — HR. FIRE RATED STUCCO SOFFIT D-5 � �- 3/4 =1 —0 a a c.D - c� CD o_ of o � U W -++ 2 N N C / m co cn cu U] O W / d