00-0664-026 REVISIONS BY
z
CAP FOR FUTURE o
n ^ U
CONNECTION SOLAR
PLUM51NG FIXTURE SCHEDULE
AIR CONDITIONINC; SCOPEDULE
OR NEAT RECOVERY
Ub
HEAT TRAP MARK
TRAP FIXTURE HOT COLD ^ ^ o
SIZE UNITS WATER WATER MANUFACTURER NOM. NOM. ESP IN. ELECT. TOTAL COOLING CAP. 3/T O/A DIMENSI0� TWF1,sHh 'ELECT. SERVICE
UNIT AND MODEL NO. TONS CFM LUG. HEAT KW LA/HP BTUH a 957 # ro"17 W CFM WxLxH (IN.) LBS. VOLTS/PH/Hz SEE
GATE VAL GATE VALVE WC 3" 4 - 'i2" _
AHU RHEEM - ^
1400 .40 10 3.3 '/2 21 x 23 5�x 52
HEAT T � � �� �� *1d2 R5NA21J11SUGAI / � I ,150 �� 208-230/I/�o0 12.4 3
RAP LAV 1/4 1 /2 �i2 T--_ - 9
D CU RHEEM 1-f.9 29,300/41,000 36 x 40 x 43
GOLD WATER, 3/4" 0142 RAM5042JAZ 3.5 313 208-230/1/60 =
H.W. TO FIXTURES SH 2" 2 1/2 '/2
HOT WATER, 3/4" 0
UNION F- °
SK 11/211 2 '/2'' '/2" W 00
U J_ 0)
WM 2" 4 i, �� rn
PRESSURE d TEMPERATURE 2 2 (n Op
RELIEF VALVE (ASME APPRVD.) NOTES: 't
DW 11/2 SW 2 ',2 _ I t� 0 N
'/2" W/VAL VE 4 Ln OI O
N 10
B - - - VAC. BREAKER Q .� � p W
3/4" Cu RELIEF DISCHARGE 1- < 0 Lo W =
LINE, TO OUTSIDE GREEN TUB 2" 2 ', ', (n _ O
ELECTRIC 2 2 W Z
HEATER AREA, TERMINATE 6 in Inn
60 GAL. ABOVE FIN. GRADE BD 2" 1 '/2" '/2" = J O W
2-6.0 KW 1 _ LL
FAIN S C I-4 E D U L E O - O .� J
DRAIN VAL� 1) FIXTURES TO COMPLY W/SFBC TABLE 410-R-2
Z Q = X a
MANUFACTURER ELECT. SERVICE
DIMENSIONS WEIGHT O W 0
2) ALL SHOWERS 4 BATH/SHOWER COMBINATIONS SHALL
FAN # AND MODEL No. RPM HP CFM 8" S.P. VOLt6/PH/Nz WxLxH (IN.) LBS. 110 J U
BE PROTECTED WITH A CONTROL VALVE OF THE WR/EGRI LL 3"� 0
EX. FAN NUTONE C350G 1500 1/90 50 g 1/8" 115/1/60 9 X 9 X 4 6 GRILLE, DUCT p o
PRESSURE BALANCE, THERMOSTSTIC MIXING OR COM- 4 ROOF CAP =
9
BINATION TYPE. HANDLE POSITION STOPS MANUFACTURER'S o
INSTRUCTIONS AT TIME OF INSTALLATION TO A MAXIMUM
WATER H E AT E fR F I F Its I Gr D I AG RAM MIXED WATER OUTLET TEMPERATURE OF 120° F. S103 .1 I H O d V :: o
NO SCALE z
0
AIR CONDITIONING SYSTEM - GENERAL NOTES:
RIGID FIBERGLASS DUCT (R-6) '
W
I. DUCTWORK SHALL BE 1 1/2" THICK, 3 POUNDS PER CUBIC FOOT DENSITY 0 ie
PL.U" 5INCA GENERAL NOTES AND SPEC IF ICAT IONS: FI5ER3LASS WITH VAPOR BARRIER, UNLESS OTHERWISE SPECIFIED.
DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE
WITH MANUFACTURER'S SPECIFICATIONS AND ACCORDING TO "ASHRAE"
1. A. SCOPE OF WORK: AND "SMACNA" STANDARDS.
SPIN COLLAR DUCT DIMENSIONS ARE IN INCHES AND CORRESPOND TO INSIDE
THE WORK SHALL INCLUDE ALL PLUMBING NECESSARY SHOWN ON THE DIMENSIONS WIDTH X HEIGHT. DUCT SYSTEM SHALL COMPLY WITH °
'NFPA" STANDARD NO. 90A AND/OR 908. DUCTWORK AND COMPONENTS
DRAWINGS, SPECIFIED HEREIN AND/OR AS NEEDED FOR A COMPLETE n i SHALL BE CLASS 1 MATERIALS IN ACCORDANCE WITH U.L. 161
SYSTEM, INCLUDING BUT NOT NECESSARILY LIMITED TO: TESTS.
1. DOMESTIC COLD AND HOT WATER PIPING SYSTEMS 2. COORDINATE LOCATIONS, SIZES AND OPENINGS WITH OTHER TRADES
ON THE JOB. A/C CONTRACTOR SHALL PROVIDE THE COMPLETE DUCT
2. SANITARY DRAIN AND VENT SYSTEMS SYSTEM WITH TURNING VANES AT ALL ELBOWS, SPLITTERS AND
3. PLUMBING FIXTURES AND TRIM DAMPERS, AS REQUIRED. 0
4. AIR CONDITIONING CONDENSATE DRAINS A/C CONTRACTOR SHALL USE THE BEST PRACTICES OF THE TRADE IN W t3 3
THE FABRICATION AND INSTALLATION OF THE SYSTEM. �Q W
5. PRESSURE AND TEMPERATURE RELIEF FROM WATER NEATER
6. PIPMG INSULATION INSULATED FLEXIBLE DUCT GLASS
I. SUPPORTS AND HANGERS 3. DIFFUSERS SHALL BE SELECTED, LOCATED, AND BALANCED IN ORDER Q f)
1 1/2" WITH POLYETHELENE JACKET THAT THEY DELIVER THE REQUIRED CFM TO THE ENTIRE ROOM EVENLY Q (j w
AND DRAFT FREE TO MAINTAIN THE FOLLOWING DESIGN CONDITIONS: ¢` ►. °
B. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST AND STEEL WIRE REINFORCING w t-+ J
EDITION OF THE "SOUTH FLORIDA BUILDING CODE" CH. 46 LOCAL ORDINANCES INSIDE OUTSIDE RELATIVE -, E
AND IN COMPLIANCE WITH THE "FLORIDA ENERGY EFFICIENCY CODE FOR COOLING - '16° DB 9I° DB - l9° WB HUMIDITY V O Q C`+ A
45° - DB 50% TO 60% 3 �
BUILDING CONSTRUCTION", AND "HRS" REGULATIONS. IN THE EVENT OF HEATING - '1C� DB
U_
REQUIREMENTS WILL GOVERN. w
CONFLICT BETWEEN ANY CODE OR REGULATIONS, THE MORE STRINGENT 4. ALL FAN UNITS, MOTORS, COMPRESSORS, ETC. SHALL BE ISOLATED, 3 v
DIFFUSER AS REQUIRED TO OPERATE QUIETLY SO THAT NOOBJECTIONABLE SOUND H r► o
WILL BE HEARD IN THE HABITABLE SPACES DUE TO AIR VELOCITY, -. -3
2. CONTRACTOR TO VERIFY AT SITE THE LOCATION, ELEVATION AND SIZE OF ALL MOTOR HUM, VIBRATION, OR MECHANICAL MOVEMENT. wt� W
EXISTING LINES FOR CONNECTION BEFORE INSTALLATION OF ANY PIPING. �
3. ALL FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER WITH AIR CHAMBERS 5. A/C SYSTEM SHALL HAVE DISPOSABLE AIR FILTERS LOCATED AS t--F IU,j W
OR SHOCK ABSORBERS AS INDICATED ON PLANS. T�P IC AL DIFFUSER CONNECT ION DETAIL
REQUIRED FOR EASY ACCESSIBILITY. :Q" °
o
4. PLUMBING FIXTURES SHALL BE CONSTRUCTED WITH THE APPROVED MATERIALS, NO SCALE
SHALL NAVE SMOOTH IMPERVIOUS SURFACES AND SHALL BE FREE FROM DEFECTS 6. A/C SYSTEM SHALL BE CONTROLLED BY A THERMOSTAT. MOUNT
THERMOSTAT 5'-O" ABOVE FINISHED FLOOR, U.ON. � � O
AND CONCEALED FOULING SURFACES. ALL FIXTURE TRIM TO BE CHROME PLATED. O ,U, a,u go
FIXTURES SHALL BE PROVIDED WITH SUPPORTS, HANGERS, ETC. O O =
�. ALL GRILLS AND DIFFUSERS TO BE OF ALUMINUM CONSTRUCTION. DIF- La Q
5. WASTE LINES TO BE PVC SGH. 40. SLOPE ALL UNDERGROUND SANITARY PIPES AT 1/6"/FT. FUSERS SHALL HAVE HIDDEN OPPOSED BLADE DAMPERS. PROVIDE GASKETS
ALL ABOVE GROUND WASTE/VENT BRANCHES AT I/a"/FT SLOPE. SUPPLY DUCT ON ALL GRILLES AND DIFFUSERS. TITUS OR AIREGUIDE, FINISHED COLOR u" z «:
BY ARCHITECT.
6. PROVIDE FULLY ACCESSIBLE CLEAN OUTS ON SANITARY AND ANY WASTE PIPING AT
EVERY CHANGE OF DIRECTION, AND AT BOTTOM OF STACKS. CLEAN OUT LOCATIONS 6. UNDERCUT DOORS I° AFF., AS INDICATED. O
AND SIZES ON HORIZONTAL LINES SHALL BE ACCORDING TO CODE. (Q�
}- Q� in
1. VENT LINES TO EXTEND 9" MIN. ABOVE ROOF AND FLASH WITH LEAD. REFRIGERANT LINE ,� 9. ALL REFRIGERANT PIPING SHALL BE COPPER - TYPE L W
TO OUTSIDE I � � 1 AGR TYPE, DEHYDRATED AND SEALED. ALL FITTINGS SHALL BE
8. WATER PIPE BELOW GROUND SHALL BE COPPER TYPE "K" ABOVE GROUND TO BE CONDENSING UNIT I / � I WROUGHT COPPER ALL JOINTS SHALL BE MADE WITH HIGH N
COPPER TYPE "L". OR APPROVED CPVC OR PoLYBUTELYNE AS REQUIRED BY OWNER --- TEMPERATURE BRAZING ALLOY OF NOT LESS THAN 5qo SILVER _,
PIPING INSTALLATION NOT LESS THAN 3/4" THICK "ARMAFLEX". F-
LIQUID AND SUCTION LINES SHALL BE SIZED ACCORDING TO N
11. PIPING EQUIPMENT MANUFACTURER'S RECOMMENDATIONS FOR EQUIVALENT 0 i
LENGTH OF PIPING RUN FOR CONNECTED TONNAGE. ALL PIPING o dl =
f� ACCESSORIES SHALL BE CONSTRUCTED AS SUGGESTED BY EQUIPMENT
A. SUPPORT ALL PIPE FROM SOUND PORTIONS OF STRUCTURE AND AT PROPER CEILING MANUFACTURER ALL PIPING SHALL BE EVACUATED PER GOOD ri REVERSE,"` v
INTERVALS ACCORDING WITH CODE.
1 1 PIPINCs PRACTICE BEFORE START-UP.
3/4" CONDENSATE a
I
B. PROVIDE SLEEVES FOR ALL PIPING PASSING THROUGH FOUNDATION SLABS OR DRAIN w/ 3" CRAP I 1 MODEL t. a
MASONRY WALLS, CAULK OPENINGS BETWEEN PIPE AND SLEEVES. UNION AND C.0 TO I I a
GREEN AREA III PARTITION CN LM 12 r,l'
C. WHERE EXPOSED PIPES PASS THROUGH FLOORS, WALLS, OR CEILINGS, PROVIDE I °
ESCUTCHEONS FIRMLY SECURED TO THE PIPES AND OF SUFFICIENT OUTSIDE 6%. A.H.U. SUPPORT I I CONDENSING ° SCALE _
DIAMETER TO COVER THE SLEEVED OPENINGS FOR THE PIPES. PROVIDE I 1 UNIT 1/4"=1'-0"
CHROMIUM PLATED ESCUTCHEONS IN BATHROOMS. I I _j CHECKED BY 1"LCx,
NO COMBUSTIBLE
S. INSPECTIONS AND TESTS
I I N
MATERIALS WITHIN I 1 00 DRAWN BY C.Cx. X
A. CONTRACTOR SHALL BE RESPONSIBLE TO ASK FOR INSPECTIONS TO THE A.H.U. ROOM cv
I (W/H UNDER)
AUTHORITIES HAVING JURISDICTION, AS THE WORK PROGRESSES. ALL I I PIPE INSULATIO CONCRETE i DATE 02/01/00 l
SYSTEMS SHALL BE TESTED BY CODE AND/OR LOCAL REGULATIONS. LOUVRE DOOR I I PAD V) �r
JOB 9628 in
B. DRAINAGE PIPING: BEFORE INSTALLATION OF ANY DRAINS, THE ENDS OF I 1 FLOOR 0 9 '
SYSTEMS SHALL BE GAPPED AND ALL LINES FILLED WITH THE WATER TO THE U `• aa SHEET
HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE BY ANy..
OWNER REPRESENTATIVE. $ 1
No" POWER DRIVEN STUDS �
OR LAG BOLTS W/SHIELD6 LL OF SHEETS
10. STERILIZE ALL WATER LINES WITH A MIXTURE OF TWO (2) POUNDS OF CHLORINATED TO WITHSTAND OVER 120 TS W
LIME TO EACH 1.000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE). - v M.P.H. WINDS t
RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER REFRIGERANT LINE ?
BEFORE PLACING IN SERVICE. TO AHU IN PVC SLEEVE
11. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN-SERVICE TEST AIR HANDLER UNIT CONDENSING UNIT ��
AFTER COMPLETION OF THE INSTALLATION. INSTAL,L AT ION DETAIL TA I GUERRER . ° � � �® ! r{
INSTAL L AT ION DETAIL L o/GONZALEZ :, �, a
AMP
y NO SCALE ENGINEERS, INC.
NO SCALE Michael C. Guerrero, P.E.
Mechanical Eng. Lic. /15235 "' s
Rafael L Gonzalez, P.E. 1
Electrical Eng. Lic. #11057 ;.
11420 N. Kendall Dr., Suite 200 t
Miami, Florida 33176
Tel. (305) 595-8525, Fax (305) 596-9077. !">'' RCR Nu 7 7 1 2