00-0635-008 DEMOLITION NOTES 1. PROVIDE ALL LABOR, MATERIALS, NECESSARY EQUIPMENT, SERVICES AND INCLUDED BUT NOT LIMITED TO ALL RELATED WORK TO COMPLETE DEMOLITION WORK. 2. SCHEDULE. SUBMIT SCHEDULE INDICATING PROPOSED METHODS AND - -- - SEQUENCE OF OPERATIONS FOR DEMOLITION WORK TO OWNERS REPRESENTATIVE - -- - FOR REVIEW PRIOR TO COMMENCEMENT OF WORK. INCLUDE COORDINATION FOR - - SHUTOFF, CAPPING AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS FOR DUST AND NOISE PROTECTION. J. PROTECTION. PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION REQUIRED TO PROTECT OWNER'S PERSONAL AND GENERAL PUBLIC g' g'Z" G' �' G'-8" 15' FROM/NJURY DUE TO DEMOLITION WORK. A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND GENERAL PUBLIC TO AND FROM OCCUPIED �I PORTIONS OF BUILDING. _______________ dceiom/d raft!no B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE r®�crt f®raker AND BECOMES EXPOSED DURING DEMOLIYTION OPERATIONS. 4. DAMAGES, PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY X660 hauiGian fir, DEMOLITION WORK AT NO COST TO THE OWNER. f1'Vlami,fl 33189 5. UTILITY SERVICES: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN, KEEP INSERVICE AND PROTECT AGU/NST DAMAGE DURING DEMOLITION OPERATIONS. DO G G NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED PORTION OF BUILDING �D�3�f�f 2097 EXCEPT WHENAUTHOR/ZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPOREARY SERVICES DURING /NTERUPT/ONS TO EXISTING UTILITIES, AS ACCEPTABLE TO GOVERNING AUTHORITIES. REVISIONS 6. PRIOR TO COMMENCEMENT OF ELECTIVE DEMOLITION WORK, INSPECT AREAS IN WHICH WORK WILL BE PERFORMED. DOCUMENT EXISTING CONDITIONS TO STRUCTURE SURFACES, EQUIPMENT AND TO SURROUNDING PROPERTIES WHICH No. DATE DESCRIPTION COULD BE MISCONSTRUED AS DAMAGE RESULTING FROM SELECTIVE DEMOLITION WORK. FOILS WITH OWNER'S REPRESENTATIVE PR/OTR TO STARTING WORK. 7 CEASEE OPERATIONS AND NOT/FY THE OWNER'S REPRESENTATIVE IMMEDIATELY IF SAFTY OF STRUCTURE APPEARS TO BE ENDANGERED. REMOVE TO 8'-4" 8. PROVIDE SELECTIVE DEMOLITION WORK IN A SYSTEMATIC MANNER. USE SUCH AFF (TYPICAL) REMOVE DOOR METHODS AS REQUIRED TO COMPLETE WORK IN ACCORDANCE WITH DEMOLITION (TYPICAL) SCHEDULE AND GOVERNING WORK IN ACCORDANCE WITH DEMOLITION SCHEDULE AND GOVERNING REGULATIONS. // 3M // 9. SALVAGE ITEMS: AT THE OPTION OF THE OWNER AND AS SELECTED AND DIRECTED BY THE OWNER, 'SALVAGE-DELIVER TO OWNER,- CAREFULLY REMOVE INDICATED ITEMS, CLEAN, STORE AND TURN OVER TO OWNER AND OBTAIN RECEIPT. 10. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS, COMPLY WITH APPLICABLE REGULATIONS, LAWS AND ORDINANCES CONCERNOING REMOVAL, HANDLING AND PROTECTION AGUINST EXPOSURE OR ENVIRONMENTAL POLLUTING. BURNING OF REMOVED MATERIALS IS NOT PREMITTED REMOVE FIXTURE ON PROJECT SITE. AND CAP OFF m 11. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT AND (TYPICAL) DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTION AND LEAVE INTER/OR AREAS BROOM CLEAN AS REQU/RED. ° o ! XE O 0 12. REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN o ' o O o O STRUCTURES AND SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO o O O COMMENCCEMENT OF SELECTIVE DEMOLITION WORK. REPAIR ADJACENT CONSTRUVTION OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. 13. SEE ALSO ELECTRICAL, PLUMBING, AND MECHANICAL DEMO;ITION NOTES. 14. CONTRACTOR SHALL SCRAPE AT SLAB AS NECESSSARY TO PROVIDE ACCEPTABLE SURFACE FOR INSTALLATION OF NEW FLOOR COVERING. ELECTRICAL DEMOLITION NOTES. 1. REMOVE EXISTING RECEPTICALS, TELEPHONE, SWITCHES AND ALL J U ELECTRICAL DEVICES IN WALLS TO BE DEMOLISHED. RELOCATE ANY OF �' ,�'2" G' 9' G'-8" �' 4=4' �' G' `l THESE DEVICES, AS INDICATED OR REQUIREED. CONTRACTOR IS REQUIRED TO VISIT SITE AND BECOME FAMILIAR WITH THEW EX/STING CONDITIONS �'-8" ou V PRIOR TO DETERMOIN/NG THE WORK THAT NEEDS TO BE ACCOMPLISHED METER ROOM N AS PART OF HIS/HER B/D. W `l. N W 2. tHE WORK SHALL INCLUDE THE FURNISHING OOF ALL MATERIALS, Z m I Q CUTTING, EXTENDING, CONNECTING, REPAIRING, ADAPTING, AND OTHER EXISTING FLOOR PLAN WITH DEMOLITION PLAN BUILDING 1 F- N� WORK COINCIDENTAL HERETO. TOGETHER WITH SUCH TEMPORARY INSTALLATIONS AS MAY BE NECESSARY TO SATISFY THE FEMOLITION 'T N O PROGRAM APPROVAL SHALL BE SECURED FROM THE LANDLORD/ARCHITECT T 0 O N O PR/OR TO CUTTING/DRILLING ANY STRUCTURAL SUPPORT. EXISTING EXTERIOR WALLS z 8 - J. ALL BUILDING CONSTRUCTION AFFECTED BY THE REMOVAL, RELOCATION, INSTALLATION OF ANY PIECE OF EQUIPMENT SHALL BE REPAIRED FINISHED REMOVE EXISTING CONC. TILES LLI U Q w'� , AS REQUIRED TO MATCH EXISTING CONDITIONS OR AS DIRECTED BY TO BE REMOVED Z < OWNERS REPRESENTATIVE. m �/ Q < 4. WHEN ELECTRICAL DEVICES ARE INSTALLED IN PARTITIONS OR CEILINGS LL _ Q N Q TO BE REMOVED, THE ELECTRICAL CONTRACTOR SHALL DISCONNECT THEM UP TO THE NEXT OUTLET TO REMAIN OR BACK TO THE PANEL BOARD. IF TO REMAIN Q d N EXISTING TO REMAIN OUTLETS ARE FED THROUGH DEMOLISHED PARTITIONS OR CEILINGS, THE CIRCUIT SHALL BE ARRANGED TO MAINTAIN CIRCUIT CONTINUITY. WIRE SHALL BE REMOVED BACK TO SOURCE FROM INACCESSABLE RACEWAYS, NOT REUSED. INSTALL BLANK PLATES ON FLUSH OUTLETS NOT REUSED. 5. ALL ELECTRICAL EQUIPMENT SHALL BE REMOVED FROM STRUCTURE TO BE REMOVED. ACCESSIBLE RACEWAYS, WIRES, BOXES, SWITCHES, AND OTHER ELECTRICAL ITEMS ASSOCIATED WITH THIS WORK SHALL BE REMOVED IF NOT REQUIRED TO CONTINUE IN SERVICE. r� 6. ALL MATERIAL SHALL BE DISPOSED OF AS DIRECTED BY OWNER. EXISTING FLOOR PLAN WITH DEMOLITION PLAN BUILDING Z MECHANICAL DEMOLITION NOTES Q J 1. ALL EQUIPMENT IN SERVICABLE CONDITIONS REMOVED UNDER THIS CONTRACT SHALL BE PROTECTED AND STRORED AT THE JOB SITE FOR g' �'2" G' �' 6'-8" 15' 4`_41 5' 6�_e11 91 �,-/�„ 2 METER ROOM V DELIVERY BY THE CONTRACTOR TO A LOCATION DESIGNATED BY THE O w OWNER. ALL OTHERS INCLUDING SPACE HEATING, HOT WATER PIPING w O m SYSTEM AND ACCESSORIES SHALL BE PHYSICALLY REMOVED AND DISPOSED z U V1 Q Q OF BY CONTRACTOR. CONTRACTOR SHOULD COORDINATE WITH OWNER FOR J LL N O ALL FINAL ARRANGEMENTS. —J O w N Q 2. aNY EQUIPMENT OR DEVICE TO REMAIN THAT MIGHT HAVE TO BE Ld DISCONTINUED BECAUSE OF ANY OTHER DEVICE MUST BE RECONNECTED /2'2" O a 0 AND TIED BACK TO THE EXISTING BUILDING SYSTEMS AND TESTED FOR Z s- � O CORRECT OPERATION. O O Z Y J. CONTRACTOR SHALL INSPECT ALL EXISTING DUCTWORK TO BE REUSED w AND MAKE ANY NECESSARY REPAIRS TO ENSURE AN AIR TIGHT SYSTEM. G%G O O � Q Q AIR LEAKAGE RATES SHALL BE IN CONFORMANCE WITH THE CONTRACT --j � w SPECIFICATIONS. DUCTWORK INSULATION SHALL BE INSPECTED AND LL w N LL CO m REPLACED IN AREAS WHERE THE INSTALLATION IS DETER/ORATED, DAMAGED, OR NOT CONT/NOUS TO ENSURE THAT SWEATING DOES NOT OCCURS. ALL o O O O 0 O O % WORK AND MATERIALS SHALL BE IN CONFORMANCE WITH THE CONTRACT E101, 0 0 Z U rn w U)SPEC/F/CATIONS INSPECT AND/OR REPA/R DUCT SUPPORTS TO ENSURE O O MOUNTING OF THE DUCT SYSTEM. I— Q O V) N ^ 4. INTERRUPTION OF EXISTING FACILITIES AND/OR SERVICES BE KEPT TO — LO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL MATERIALS — O REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE NECESSARY TO MAINTAIN CONTINUITY OF SERVICES—COORDINATE ALL INTERRUPTIONS WITH W w V) THE OWNER. w jii w w w 5. ALL BUILDING CONSTRUCTION AFFECTED BY THE REMOVAL, RELOCATION, w Q O p O INSTALLATION OF ANY PIECE OF EQUIPMENT SHALL BE REPAIRED AND A' z Q O o = FIN/SHED AS REQUIRED TO MATCH EXISTING CONDITIONS. Q w w - PLUMBING DEMOLITION NOTES fl Ld O O O z z 1. PLUMBING CONTRACTOR SHALL PERFORM A FIELD VERIFICATION PRIOR N O O TO BIDDING THIS PROJECT. 2. CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF EXISTING PIPES BEFORE COMMENCING TO WORK AND WILL BE RESPONSIBLE FOR COORDINATING HIS DEMOLITION WORK WITH OTHER TRADES J. CONTRACTOR SHALL PERFORM THE FOLLOWING: A. REMOVE OR DIVERT ALL EXPOSED PIPING AS REQUIRED PROJECT No. B. CAP UNUSED SANITARY WASTE BELOW FINISHED FLOOR AND REMOVE OR ABANDON ABOVE. SCALE 114"= 1 ' C. CAP UNUSED VENT PIPE MAIN RISER AND REMOVE OR ABANDON a -0 EXISTING AS REQUIRED. DO D. REMOVE REMOVE AND EXISTING R S FIXTURES H TRIMS E /P/NG ABANDONUNUSED ATERASERVICE AND CAP G'-G" SHEET No. 2 OF 12 DPWNSTREAM FROM DISTRIBUTION LINE. 4. CONTRACTOR SHALL RECONNECT ANY EXISTING SERVICE, WHICH HAS BEEN DIVERTED IN ACCORDANCE WITH STATE AND LOCAL CODES AND A 2 ORDINANCES. 5. EXISTING PIPES SERVING AREA ARE NOT COVERED BY THIS CONTRACT i -- BUT IN SERVICE AT THIS TIME SHALL NOT BE INTERRUPTED EXCEPT AS A TEMPORARY INTERRUPTION COORDINATED WITH THE OWNER. 6. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTIONS AND �' �'Z" G' G' 4'2" �f' CONNECTIONS CHARGES REQUIRED. � SEAL 1 t t AR w 1• \