Loading...
00-0630-010 SH1 2 -35 SH1 2 -35 SH 35 +47.8 64.8 +47.8T64.8 +44.8 47.7 ZONE 4 ZONE 4 ZONE 4 A 12 �5 - - - - - - - --- - - - - _ _ ELEV. +18'-4" _ TOP OF MASONRY — — — — — — — — — — — — — — — — — — — — — — — — — — — — BEAM TOP OF INTERI R K RAIL 2nd. F.F. - I ro I I 2-B6 in _ _ _ ELEV. LVARIES� _ — — — — — — — — — — — — — - - - - - - - - - —I OPEN — TBEAOF MASONRY I (See Beam Schedule) - - - - - - - - - - - - - - — — I z.. - - - - - - - - - - I N 3c G STUCCO N o I I STUCCO . I iE 3E ALL OUTSIDE FIXED GLASS F.F. TO COMPLY WITH 3508.2 I I 0 - - - - - - - - - - — - - ELEV. +0'-0" _ T r TOP OF CON C_. SLAB EAST SIDE ELEVATION 1 /4 = 1 ' ELEVATION LEGEND O CEMENT TILE ROOF (TYP.) REFER TO TYPICAL WALL SECTION ON SHEET D-1 FOR METHOF OF ATTACHEMENT BO ROUGH SAWN CEDAR, P.T. 2 X 8 WOOD FASCIA, H23 CAT. I 7 F.DOOR SH 1 2 25 SH 1 2 25 EMP.GLASS SH 24 0 (CONSTRUCTION GRADE) +43.6-55.3 +48.3 65.8 48.3 58.6 +48. 65.8 +46.4 49.3 Q CO TEXTURED STUCCO FINISH ZONE 5 ZONE 5 ZONE 4 ZUNEb IZONE 4 Q (TYPICAL THROUGHOUT) RAISED SMOOTH FINISH STUCCO TRIM 01-24-01 0 E 8" DIA. SMOOTH STUCCO FINISH MEDALLION No. DATE ADD.2 #5 @ ARCH. REVISIONS 12" X 12" DECORATIVE SMOOTH STUCCO AS SHOWN SHEET S-3 FINISHED ROSETTE n FOR INFORMATION ONL• HO 42" HGT, A.F.F. ALUM. RAILING. W/ BALLUSTERS TO NOT FOR CONSTRUCTIOI REJECT A 4" DIA. OBJECT Fi n NOT FOR PERMI n FOR PERMI JO DECORATIVE (NON-STRUCTURAL) ALUM. RAILING NRAISED SMOOTH FINISH STUCCO BAND I � --�---� r ALIGN W/ BOTTOM OF DECORATIVE FOAM MOULDING LLI I OPEN v Z W W C I ow � �u: NOTES i cn - --I--I D 1. THIS STRUCTURE SHALL HAVE ALL EXTERIOR GLAZED OPENINGS I w o a INCLUDING ALL FRENCH DOORS, FRONT ENTRY DOORS, AND m r- ANY EXTERIOR DOORS PROTECTED BY HURRICANE PROTECTIVE I Q I SHUTTER SYSTEMS, BEARING A METRO DADE PRODUCT ACCEPTANCE C° - NUMBER. SEE ATTACHED MFR. AS PART OF THIS SET. I I z � Q `a \- w 0 1 ,*....... j M STUCCO I � • o I � � Ma_ —fLL LLI V) d U + j ` • I wQ d • •... • i r_ry _L_ 1 W i C y F- m; r g Q d ,y i{��� -`I° SHEE DESCRIPTION —ELEVATIONS WEST SIDE ELEVATION 1 /4 = 1 ' EAST WEST SCALE 1 /4))=V-0) PROJECT NUMBER 2000— DATE SHEET NUMBER A- 4