Loading...
00-0496-006 � U j j KJ I- Qc0Q vN General Motes v .ta N O 228'-0" j 36 v '� Contractor shall verify all dimensions and conditions at site before 51'-10" 62'-2" '� 0 Z rn 62'-2" 51 -10 y ' M M o, .4 construction begins. M _ K Q to-M All construction shall comply with S.F.B,C. - - - - - - - - - - - - - - - '- —o — -0" W Plan C, Lot 7 5. .. 2s_o 5-° — s including 'I—'� - - - - - - - - �`� - - - - - Clearing: remove organic and other deleterious materials, g - 2,240 sf building �- designated trees, roots, etc, From the affected site. 3 Bedroom I �� I ;� I- I � I �� I ! >� Areas to be covered by buildings slabs on fill, and all areas under 5,367 sf lot SIZE', l ( I I I I I I paving scarified to a minimum depth of 6" and as otherwise required, ' 1n , 0 -J I - -1 , I o N 1 0 N I- , I- - to remove stumps, roots; etc. Complete work before starting 900 g septic tank I foundation work. Remove all trash and other deleterious materials 330 sf drainfield I L _ _ -I_ - - - -� I I from site and stockpile approved materials for site grading. r - 330 sf reserve _ _ _ I l 7-- - - - - - - - - Excavation: Excavate footing trenches to depths. indicated on r 4_ _'1111111_ - - - l l I architectural drawings and details. Relocate excavated material. I I �Backfill under foundation is strictly prohibited. Plan B, Lot g AII wood in contact with concrete shall be ressure treated. 2,24.0 sf building f 1 1 ul Lumber used shall be identified by. the grade mark of an approved 3 Bedroom I /- I I ► ►� I I �- U Lumber. radin or ins action bureau or agency. Stress-grade ' 4,475 sf lot size r°r� ' I j I I I ll I \ I C � U DD 9 9 P for; 'C tank I I I 3 lumber:shall conform to the National Design Specifications 900 se tl:Stress-grade Lumber and Its fastening g P - /- I 330 sf drainfield �- �AII structural framing members to be 1,500 psi minimum extreme 330 sf reserve I - - - - - - — ( I 4) isq U fiber stress in bending (Southern Pine No. 1). o 0 O O .n All concrete in contact with round 'to be 2,5Q0 psf ® 28 days. "�(- T - I T g Plan A, Lot 9 l U Concrete above ground to be 3,000 psf 28 days.. I I L -1 ° I lob i I a I IoF- 1 2,240 sf building I I J J Cn Reinforcing steel shall conform to the requirements of ASTM A615 `° s-o °�,' �r I � t I o ' L J 5-°° u � � �r 1 N 3 Bedroom o! I 1 5_ O O specifications for new deformed billet steel and to grade 60 specs o "I I N I a �, I c C", I " (Y(N I o N I I I V) — i h min. Yield siren th of 60 000 si. It shall be detailed, 5,367 sf lot SIZe o I - wt a g , P I I I I I l fabricated and placed as recommended by ACI. welded wire fabric 900 g septic tank I ( I (w.w.f:) and shall° conform to ASTM. a-105 double w.w.f. 36" on each L -� - - -� L- - - -I- - - -I - -20'-81"1 - - °� monolithic footings. 330 sf drainfield — 20'- " 20.- ' _ side of bearing walls` and. 30 around perimeter of moo g I _ _ _ _ _ � •- _ ",I, _ _ _ — Concrete masonry units"shall be load bearing type conforming to 330 sf reserve ASTM C90 mortar shall conform to ASTM C270, type M. ' All roof joist, outlookers, beams shall be secured with approved I - I metals 'ties, clips and anchors to tie beams. 00 1 • I work. 4 Use aluminum nails only for all exterior wood wo N I I c- AII stucco scratch coats shall be allowed 24 hours drying period. Burglary Intrusion Notes I - - - - - - -- I o I Drainfield and doors connecting garage areas with living I I Drainfield Swinging exterior doors a 9 g 9 I 214 SF I I 214 SF i areas shall be secured with a latch and single dead bolt with 1" - minimum throw, or a combination and latch and dead bolt set as °' s-o° Reserve I- I _ I Reserve s-o follows: swinging entrance doors to individual units should comply with _ I and shall be secured as set forth in 6 Res SF 1 - - - - - - - - - - - - - I 214 SF I Plan C, Lot ,3 paragraph 3602.2(e) herein Plan C, Lot I J I F - - 20OG j , , LOOG� - - - I - _ sub-paragraph 3603.2(p),(1), or by combination dead latch and 2 240 sf building 2,2'40 sf building hardened dead bolt sets`or.°dead. bolt which contains an insert, each , 10 T T 3 Bedroom � 22•-,°• ;- • � 5' °" _ 2'-�°•• With 1" minimum throw. At least one such entrance door shall be = 3 Bedroom — — — I I I 5,988 sf lot size provided with a door scope or vision panel complying with 5,988 sf lot SIZe N �N ' I 1 ° ,- - — L - - -I" F- - - - - - -� I I 900 g septic tank sub-paragraph 3603.2(e)(1)(dd) of S.F.B.C. 900 g septic tank C° I I I I i I I I Drainfield ° I I , Total 428 sf drainfield Swinging exterior._doors and doors connecting garage areas with living N 1 I o Drainfield Total 428 sf drainfield �, i ( 214 SF I , , I 214 SF I I I Total 42 sf reserve areas shall comply with paragraph 3603.2(e) as follows: swinging I I 8 lush construction, and shall be not less Total 428 sf reserve I - - - doors shall be of solid core; f I 5' ° Reserve I^ I - I Reserve 5 I than 1 3/8" in thickness. Swinging doors of stile, rail and panel I I 214 SF 1 i 1 I 214 SF ( I 1 construction shall have rails and stile not less than 1 3/4" inches in ' I thickness with retaining tongues or splines not less than 3/8" in least I I I 1 dimension. Main entrance doors shall be provided with a door scope , I I 2r-,o° 5'-0° s-°° 2r-'°" I I P or vision panels complying with paragraph 3603.2(f) of S.F.B.C. locks ► I I ' ' on exterior doors shall be a minimum of 6000 possible key changes _ _ - _- _ _- - _- _ _ _ _ - - - - -_ - -_ - -- - - - or locking combinations - - - - - fn • - " I N i - = - - -- - -I ' i - - - - I I En E - - - - Drainfield Drainfield I - - - - - - - - (- - -1 I 214 SF 5,_0. 21 4 SF 1= I r - - - 20OGj l 900G_-. - - - 1 I .C- 5'-0" � • - � - - - - - - -{� I I T I T I I - - - - - - - Plan B, Lot 2 3 v -� Plan B, Lot 5 _ Reserve I - - - - l Reserve I 2,240 sf building - - - - - - - - - �- - - - I 214 SF 1 o •- 2,240 sf building 1 214 SF I ° ° I I , _ � _ _ L _ _ _ _ _ _ �, 3 Bedroom i— � � O 3 Bedroom o �-- - - - - - - -I 1 j _ — 1 - - -, ,- - —, I ' l 22'-,0" - Bu11 In 2 O Drainfield I I Drainfield ° 1 B di 1 s' o° 22'-,0" 4,993 sf lot SIZe LL 3 sf lot size I I 4,99 I 214 SF I, I I 214 SF I I I � 900 g septic tank a� 900 g septic tank I I " _ z O , I -� 1- - - - - - I Total 428 sf drainfield Total 428 sf drainfield 1 5' ° Reserve I' I Reserve 5 LO 214 SF I Total 428 sf reserve a� 428 sf reserve I 214 SF I I I I I .c Total I I- - - - - - - J 1 I I 22'-,0•• 5'_0" g'_0° 22'-,0° I t _ i - - - -�90007 I I 90OGJ- - - - -I I I T I. � I I T I I — - - I- - - - - - - , I 03. 13.2000 I I- - — --- - - — — - I o � I I Plan A Lot 1 I r �� Revisions Plan A, Lot 4 N I I I , I I 2,240 sf building N I I I rainfield I I Drainfiel I ► I 2,240 Sf building 214 SF I ► 214 SF ► I ► I 3 Bedroom 1 12.20.2000 LO Bedroom 3 Bed N I _ _ _ _ �� F - - - - — 1 I I I 6,470 sf lot size 6,470 sf lot SIZe I 1 -° Reserve I' ' i ^ I Res Se 5 I 15 ° I 2r-,°• 900 g septic tank tank 22•-,0° I 5'- 1 214 SF I I I 1 I 900 g septic I I I • I Total 428 sf drainfield Total 428 sf drainfield 1- - - - - - - -J L - - _ - - - � _ _ _ _ _ I I I F- — — T — — Total 428 sf reserve Total 428 sf reserve I 22-,° 5- 5-0 22-' I 1 "-0 Reserve I Reserve?14 SF I 'I I _ - -- I I 214 SF - - I Drainfield o I Drainfield I^ I I 214 SF I n. I I I 1 '214 SF - - - - - - - -- A= 1B L_ .1 s 32'- 30'-8" 32'-10" 32'-10" 32'-10" Sheet 1 of 30 U CL G J O C+ !;r Sifelsepitic Plan D=!== • Scale 1/16" 1'-0" ' 11 s