Loading...
00-1068-024 REVISIONS BY CONDENSING >;—VENT CAP WITH MAX. 1/2' ' UNIT MESH SIZE SCREEN- EXCEPT MIN. 12 ' CLEAR DRYER VENTS SHALL NOT BE ON 3 SIDES SCREENED POWER AND CONTROL MIN.6 ' MIN.2 ' CONNECTIONS FLASHING AND ROOFING SEAL \. �\ ��. \, ��. ��. \. ��. OVERLAP MIN.24 ' CLEAR BY GENERAL CONTRACTOR AROUND 26 MSG, 1 1/2' W G.U. GALV.STRAPS ATTIC ------------------------------------ ---- ---------------------- 48 ' C /C AND A ------------------------------------------------------------------- SPACE EVERY ELBOW (✓G�`�N � �;, WITH HILTI REDHEADS EXHAUST DUCTS I X OR I/4' SCREWS ATTACHED 26 MSG GALV.SHEETMETAL TO TRUSSES 4' CONCRETE DRYER DUCTS WITH SMOOTH BASE INSULATED SUCTION AND INTERIOR SURFACES. DUCT COLLAR LIQUID LINE W/O DO NOT USE SCREWS OR OTHER ATTACHED TO DECK O FASTEN C INSULATION .U.TO ANCHORED FASTENERS EXTENDING INTO ATTIC WITH HILTI REDHEADS DUCT WALLS SPACE OR 1/4' CREWS CONCRETE SLAB WITH / / /j j/ j / ./j / / ,// / / ,// / j j %/ S-HILTI 1DN21P8),TWO At ------------------------------------ ---- ------------- --------- -00 EACH SIDE OF CU. n ------------------------------------ ---- - --------------------- GLASS I ,R-6 R-6 FLEXIBLE DUCTS SEAL OPENING /— 4'0 PVC SCHAO CONDUIT o<N FIBERGLASS DUCT ON ONE INCH THK UNDERGROUND WITH ^ E-DUCT TO UNIT 6 ' WIDE WITH MASTIC LA NOTE : FLEXIBLE DUCTS FIBERGLASS SADDLES. PVC ELBOW REFRIGERANT LINES. 0° CEILING SHALL BE INSTALLED WITHOUT CEILING �`a � KINKS DR SAGGING CONIDEN5ING UNIT MOUNTING [DETAIL :2 IDUCT 5UPPORT5 DETAIL NTS 00 NT DETAIL 14 N.T.S. o_ N.T.S. LA I w V) X L Ld � �o ATTIC o = i WOOD TRUSSES SPACE R-6 FLEX.DUCTS N 0 R-6 DUCTWORK �C> ® Z� O Lii 0:z: Tr MY y-yyyyyyyyyyuyyyyyM r4-) GATT INSULATION ( BUT 2FT.HIGHER THAN o HIGHEST POINT WITHIN 10 FT. ) °o a VENT CAP PLENUM ELECTRIC STRIP HEATER . a U- YfN z f. FLASHING FACTORY FABRICATED FILTER SECTION R/A a a DUCT CLAMP 2'X 4' WOOD SUPPORTS BOLTED TO DESK a. ° 8 X 4 LOUVER 1xi TRUSSES WITH INSECT SCREEN J CEILING 2(f REF.LINES IN C.Q 4' PVC CONDUIT Uri.TO C.U. A/C EQUIPMENT CL05ET [DETAIL NTS GRILLE 5CHEDULE EXIST.WALL MANUFACTURER AIR GUIDE 4' m METALBESTOS CD CURVED BLADE DIFFUSER WITH O.B.D. TYPE B FLUE STACK MODEL C5-1-051 SR SUPPLY REGISTER WITH OBD 0­4 MODEL VH-05 DRAFT DIVERTER � RETURN GRILLE MODEL RA HVAC CHECKL I5T GENERAL NOTE6 HVAC DESIGN REQUIRES e 1.SCOPE OF WORK: GAS DUCT SMOKE DETECTORS ----- ------NO A.CONTRACTOR SHALL PROVIDE ALL EQUIPMENT,MATERIALS AND 8. COORDINATE ALL WORK WITH OTHER TRADES INVOLVED.THIS WATER FIRE DAMPERS ------------------ NO LABOR FOR A COMPLETE HVAC INSTALLATION IN ACCORDANCE INCLUDES WALL AND ROOF PENETRATIONS AND REQUIRED 6 X 4 LOUVER HEATER SMOKE DAMPERS----------------- NO cYl WITH THESE DIAGRAMATICAL DRAWINGS. ELECTRICAL SERVICE AND CONTROL WIRING. WITH INSECT SCREEN (BY FIRE RATED ENCLOSURE ----------- NO cn B.MATERIAL AND WORKMANSHIP SHALL IN ACCORDANCE WITH g REFRIGERANT PIPING SHALL BE COPPER ACR WITH PLUMBER ) FIRE-RATED FLOOR/ � cn THE LATEST EDITION OF THE SOUTH FLORIDA BUILDING CODE. 95 /5 SOLDER.SUCTION LINES WITH 3/4' EXPANDED CEILING ASSEMBLY---------------- NO C.CONTRACTOR SHALL OBTAIN APPROVAL OF SHOP DRAWINGS POLYURETHANE INSULATION. FLOOR SLAB FIRE STOPPING------------------ NO _Q SUBMITTALS OF MATERIAL AND EQUIPMENT t0 SUBSTITUTE SMOKE CONTROL ---------------- NO w BASIS OF DESIGN EQUIPMENT AND MATERIALS NOTED ON THESE Q DRAWINGS .SUBMIT TEN COPIES OF SHOP DRAWINGS. O 10 .CONTRACTOR SHALL FURNISH THE OWNER WITH ALL OPERATING LL MANUALS AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT 2.CONTRACTOR SHALL VERIFY ALL EQUIPMENT,DUCTWORK, INSTALLED. Q DIFFUSERS AND GRILLES TO WORK AND Flt PROPERLY WITH ALL U _ OTHER TRADES AND ASSURE THAT THESE ITEMS DO NOT CONFLICT _ _ W WITH ELECTRICAL FIXTURE LOCATIONS. II .CONTRACTOR SHALL GUARANTEE ALL WORK INSTALLED UNDER THE -I 111 111 III—III— I 1=1 I III I Q 3.VERIFY EXACT ROUTING OF DUCTWORK AND CONDENSATE DRAINS CONTRACT TO BE FREE FROM THE DEFECTIVE WORKMANSHIP III=III=I I=III=III=III= =III= _ w AND MATERIALS USUAL WEAR EXPECTED AND SHOULD ANY SUCH 11� WITH STRUCTURAL ELEMENTS.LOCATION AND SIZE OF ALL DEFECTS DEVELOP WITHIN A PERIOD OF ONE YEAR AFTER III—III—III—III III—III III—III=III I I 1 1 1=1 = I I i I =I I I 1 I = _ i SLEEVES THROUGH STRUCTURAL ELEMENTS SHALL BE SUBMITTED TO ACCEPTANCE OF THE BUILDING BY THE OWNER , THIS —)I I—I 11=1 I I-1 I I I I-1 I —1 I I-1 I I =1 I = I 1=1 I =1 11 1 I 1=1 11=1 I =1 11 1 I 1 1 I 1 1 11= p /� M ' I /� /� ARCHITECT FOR APPROVAL PRIOR TO ERECTION OF STRUCTURAL CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY DEFECTIVE 1=1 = = = 1= = I I= 1 = I I III=1 1= I 1=1 I I=I I 1=1 I =I I I=1 (1=1 — — — 51 ECIAL MECHANICAL NOTES � � � � SYSTEM. ITEMS AND ALL DAMAGE RESULTING FROM FAILURE OF THESE —III—III III—III—III=III III III I —III=1 —111 1 I I=1 I 1=111=1 i l—I I—I I 1-1 I—I 11= Lu 4.CONTRACTOR SHALL BALANCE AIR DISTRIBUTION SYSTEMS ITEMS, AT NO EXPENSE WHATSOEVER t0 THE OWNER �= I —I I —I 11 1 I 1 1 I I I 1 1 I I—I I I 1=1 I =1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 I I=1 I M I 1- ALL EXHAUST DUCT SHALL BE CONSTRUCTED OF SHETMETAL Z < � TO WITHIN 10 % OF AIR QUANTITIES SHOWN ON PLANS. -111=1 I 1=1 I 1=1 11=1 I =1 11=1 I =1 I I=1 1=1 11=1 11=1 I =1 I =1 I =1 I 1=1 11=1 I 1=1 I I=1 I 1=1 11= TERMINATE OUTSIDE THE BUILDING AND BE EQUIPPED WITH Q `� m AND ADJUST ALL CONTROLS AND EQUIPMENT FOR PROPER 12 .CONTRACTOR SHALL PROVIDE 6 SETS OF SHOP DRAWINGS =1 I 1=1 I 1=1 I I=1 I =1 I I I = 11 I I I 1=1 I =1 I 1=1 1 5=d 1=1 I I= I =1 I =1 I I= I = I I=� BACKDRAFT DAMPERS(NO T-FIN ALLOWED) O 0 OPERATION. SUBMITTALS FOR ALL MATERIAL AND EQUIPMENT TO BE USED IN I.111= 1=1 1— 11— 1 — I— — —I 1 I 1 I — — — 1 — = L THESE PROJECT FOR APPROVAL BY ARCHITECT/ENGINEER I 0- � 111 II 1 I—I 1 II�1-1�I III III—III III—III III—III III—III III—III= 2- DUCTS FROM TOILETS ROOMS SHALL DISCHARGE t0 THE '� 5.COORDINATE EXACT LOCATION OF ALL SUPPLY AND RETURN AIR 13.CONTRACTOR SHALL MAINTAIN A SET OF REPRODUCIBLE SEPIA =III=III=III =III=III=III=III,-I 111= = =I I I 111=111= =111 = OUTSIDE OF THE BUILDING,SHALL TERMINATE NO LESS U O CEILING DEVICES WITH ARCHITECTURAL CEILING GRID AND LIGHT DRAWINGS SHOWING AS BUILT CONDITIONS AS THEY OCCUR A —1 11— I 1 I I 1-1 11= I ° 1=1 I I=1 I 1-1 I 1=1 I I—I I I—I I 1=1 I —1 11=1 THAN 6 INCHES ABOVE THE FINISHED ROOF SUWACE AND 1L iL FIXTURE LOCATIONS. COMPLETE SET OF AS-BUILT REPRODUCIBLE DRAWINGS SHALL BE ' I I I-1 I I—III—III—III ° a I I—III—I =III—III—I I i— I—I SHALL BE SCREENED WITH A CORROSION RESISTANT MATERIAL SUBMITTED BY THE CONTRACTOR TO THE ARCHITECT/ENGINEER III )i I III—III- 1 =III III—III III—III III—III- OF MESH SIZE NO LARGER THAN 1/2 INCH.PROVIDE GOOSENECK PRIOR TO FINAL ACCEPTANCE OF INSTALLATION.THESE 6.CONSTRICT AIR CONDITIONING DUCTWORK FROM 11/2 INCH THICK DRAWINGS SHALL HAVE ALL INSTALLATIONS REFERENCED BY =1 I —1 111 I 1-1 I —1 I I 4 d 1 1 I-1 I —I 11-1 I 1—III— =� OR RAIN CAP ON ROOF TERMINATION R-6 CLASS I DUCT50ARD PER SMACNA 'S FIBERGLASS MANUAL. DIMMEN61ONS TO A SET REFERENCED POINT OR POINTS. — I —1 I 1—I 1=1 I I-1 ° .4 1 I —1 I El 11-1 I I 1 I 1 ALL FLEXIBLE DUCTWORK SHALL BE R-6 INSULATED. — I 1 5 I 1=I I 1=1 I II I I-1 I —1 11— I 1-1 11=1 3- CLOTHES DRYER EXHAUST DUCTS SHALL NOT BE SCREENED EXHAUST AND VENTILATION SYSTEMS PER SMACNA'S LOW PRESSURE 11= — I-1 111 I 1—I I 1 I 1-I ' SHEETMETAL MANUAL. I I —I 1 11 I I—I I I— 11-1 11-1 I — I I1 I I—I 11=1 1 1= 11-1 1 4- CLOTHES DRYERS EXHAUST DUCTS OR VENTS SHALL COMPLY -111— I —1 I — I —I 11=1 11-1 11-1 11=1 11=1 11 1 1 1— I WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS,BE 1.AIR DISTRIBUTION DEVICES SHALL BE CONSTRICTED OF —III=1 1511 11111 11 l 1=1 i l l i i i l l l i ,I I I-11 I- g g CONSTRUCTED OF MINIMUM 26 a s GALV METAL PIPE DRAWN HAVING A SMOOTH INTERIOR SURFACE WITH JOINTS RUNNING RM�G' ALUMINUM. MODELS AS SCHEDULED ON PLANS OR APPROVED IN THE DIRECTION OF AIR FLOW.DUCT JOINTS SHALL NOT CHECKED EQUAL. BE ASSEMBLED WITH SHEETMETAL SCREWS OR OTHER EAC, GA5 WATER HEATER FASTENERS WHICH EXTEND INTO THE DUCT WALLS DATE APRIL '00 VENTING DETAIL. SCALE N.T.S. ' W JOB No. ` r 2K-216 �, .. SHEET AC-2 I�y• J f+- 1�_ OF 2 SHEETS ID