Loading...
00-0883-064 J ) 7 J J J ) J ) ) ) ) k '^ J ) ) C a Lu ELECTRICAL NOTES: Ws r EXIST. LOCATED NORTHEAST SIDE N Lu Ln PANEL OF PAVILION FLOOR. a _ M "CRN" 1 . THE CONTRACTOR SHALL ADJUST LENGTH OF PVC PIPE BETWEEN THE MONITOR + in C/) ") SENSOR UNITS END BOXES IN ORDER TO PROPERLY FIT WALL AT BOTH ENDS. w 0 = o SEVENTH FLOOR 2. NOT USED. Y °C 'm- 2 Lu J . 3. NOT USED. z - , O.R. ELECTRIC ROOM 4. PANEL "1 E1 " AT EMERGENCY AREA FIRST FLOOR PAVILION MAIN NORTH TOWER MEDICAL I.C.U. I NORTH TOWER (SOUTHEAST SIDE) ELECTRIC ROOM PAVILION (EMERGENCY DEPT.) CORRIDOR AT (DOUBLE DOORS). THE CONTRACTOR SHALL 'o, EXISTING ,27,29. 100A-3P CONSIDER THAT THE NEW BRANCH CIRCUIT CONDUIT AND WIRE LENGTH OF RUN I480V, 30, 3W EXISTING BRANCH BRKR. 100A-3P BRANCH BRKR #8 TO BE MINIMUM OF 100 FEET. (SEE PANEL SCHEDULE THIS SET OF DRAWINGS 150A-3P BRANCH BRKR #1 SHT. E-5) " I120/208V, 3�, 4W 4 4 0 IN EACH OF 2-3" 4 #4 IN 1-1/4" CONDUIT # / 70A-3P BRANCH BRKR #1 5. NOT USED. CONDUITS 120/208V, 30, 4W PANEL TO BE USED 10OA-3P BRANCH I 225A-3P BRANCH PANEL I 4 #3 IN 1-1/4" CONDUIT cc IN THIS PROJECT. BREAKER BREAKER 3 #4/0 IN 3 COND. 2E1 2DLE1-8 100A.-3P 6. SEE MECHANICAL DRAWINGS PLANS AND ELEVATIONS FOR REFERENCE. Z 480V, 30, 3W ( ) z 7. THE MED-AIR 24 VOLT CABLE FURNISHED WITH EQUIPMENT FROM THE MONITOR TO THE SENSOR ABOVE THE DOOR PLUGS INTO A JACK RECEPTACLE AT THE MONITOR SENSOR. S P PANEL DISTR. P S DISTR. 8. THE CONTRACTOR SHALL COORDINATE LENGTH OF THE MED-AIR 24 VOLT CABLES W PANEL PANEL PANEL 75 KVA " PANEL 150KVA PANEL DISTR. PANEL PANEL PANEL TO BE USED WITH THE MANUFACTURER. CABLE FURNISHED WITH THE EQUIPMENT. LL a "CI-20" "CL2NA" "CL2S" XFMR. CH2S I "2HDE" XFMR. "2DLE" PANEL "DP" "RR" a r 150 A. I IN THIS PROJECT. "2DLE1" 9. THE MED-AIR EQUIPMENT 24 VOLT CABLES AND THE 120 VOLT FLEX CONDUIT W " SECOND FLOOR _ co _ WITH WIRE ENTER THE TOP LEFT SIDE OF THE UNIT. TWO 1/2" KNOCKOUTS "' J V PROVIDED IN UNIT. w W MAIN ELECTRIC ROOM - NORTH TOWER GENERATOR ROOM - SOUTH TOWER = MAIN ELECTRIC ROOM - SOUTH TOWER PAVILION EMERGENCY COORIDOR Z co 2HDE-4 225A BRANCH BRKR. 10. THE CONTRACTOR SHALL VISIT EACH SITE PRIOR TO PRICING HIS WORK. u- Z 4 #3/0 IN 2" C. I 75 KVA 11 . THE S INDICATOR LIGHTS ARE LOCATED ON THE "SCU PREWIRED BY THE XFMR. MANUFACTURER. 12. ALL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE (LATEST � CD ADOPTED EDITION) ALL OTHER APPLICABLE CODES AND STANDARDS. o Lu PANEL 1DLE1-6 I PANEL 13. THE CONTRACTOR SHALL SATISFACTORILY REPAIR AND/OR REPLACE EQUIPMENT OR w o CRITICAL POWER PART OF STRUCTURE DAMAGED AS A RESULT OF HIS WORK. SURFACES AND m g cn 277/480V, 3�, 4W "1 DI-El " "1 E1" z 4 #4/0 IN EACH FINISHED AREAS SHALL BE RESTORED TO MATCH ADJACENT AREAS. i 'go a o NORMAL PWR. o m N o OF 2-3" CONDUITS I � � °o = o � TO PANEL I m � m � m � 14. APPROVAL SHALL BE OBTAINED FROM THE ENGINEER PRIOR TO CUTTING OR R• Z � MDP1 3:: w° can °w c� in 10OA-3P BRANCH BR R #6 cn 100A-3P BRANCH BR�R PANEL TO BE USED I DRILLING ANY STRUCTURAL SUPPORT MEMBERS. 400A BRANCH BRKR �, � tog 400A IN THIS PROJECT. 15. ALL MATERIALS REMOVED SHALL BE DISPOSED OF AS DIRECTED BY THE SOUTH o BRANCH DISTR. 277 480V 3� 4W I ��•. .. ATS-2 PANEL / GENERATOR / MIAMI HOSPITAL MAINTENANCE DEPT. (MR. JESUS SARDINA). + W BRKR. 400 A. "CDP" SWITCHBOARD PANEL z (CONTROL/ "1 HDE1" 800 KVA 800 KVA 800 KVA 16. MODIFY AND REROUTE EXISTING WIRING AS REQUIRED TO ACCOMPLISH INDICATED o 400A "I SYNC. BOARD) (CRITICAL) i BRANCH 150A BRANCH BRKR. #`h GENERATOR GENERATOR GENERATOR CRITICAL BRANCH I WORK AND CONTINUE SERVICE TO LOADS BEYOND AREA IN WHICH WORK IS BEING =r 400 AMP NORMAL POWER TO/FROM SWBD DONE. � ,,-SW'BD ATS-1 BRKR. EDP2-5, 400A G J G J G J 1 HD1(SECT. 3) BRKR. #12 BRANCH BRKR. (CRITICAL) i 350A-3P (ATS-1 LINE UP) 17. ALL NEW CONDUCTORS USED SHALL BE COPPER. FIRST FLOOR 400A BRANCH BRKR. '-"-"-' ^ 18. ALL NEW 120 VOLT WIRING WORK SHALL BE RUN IN CONDUIT. 19. ALL ELECTRICAL MATERIAL SHALL BE U.L. APPROVED. 20. NOT USED. , 400A SWBD EDP-2 BRANCH BRKR. 3 FEEDERS 21 . NOT USED. w^ 400A SW BD EDP-1 BRANCH BRKR 22. THE CONTRA _ -_CTOR ..SHALL ..REFER_ TO ARCHITECTURAL SHEETS A_-2, A-3, A-4 Bc A-5 FOR FINAL DEMOLITION ROOM AND CEILING PLANS, AND NOTES. THE ARCHITECTURAL Soo MHAMI lvl"rOSP`hITAL- mmmAINL PAVILION L o NOTES ON THESE DRAWINGS REFER TO THE REMOVAL AND REINSTALLATION OF EXISTING LIGHTING FIXTURES BY THE ELECTRICAL CONTRACTOR. PLEASE NOTE THAT PARTIAL POWEvR" RISER" IT HIS PART OF THE ELECTRICAL WORK IS INCLUDED IN THIS CONTRACT. ' NO SCALE E 23. ISOLATION ROOMS INCLUDED IN THIS CONTRACT: a. EMERGENCY ROOM - FIRST FLOOR PAVILION ON SHEET E-1 . ® cam � b. ROOMS 744 & 745 TH. FLOOR MAIN - BUILDING ON SHEET E.-2A caM M 24. THE ELECTRICAL DEVICES AND OUTLETS SHOWN MOUNTED ON THE WALLS OF THE 0 z ROOMS INCLUDED IN THIS CONTRACT (NOTE #23 ABOVE) SHALL BE EXISTING TO _ 0 REMAIN UNLESS NOTED OTHERWISE AND SHALL REMAIN IN SERVICE. a � 25. PRIOR TO STARTING ANY WORK, THE ELECTRICAL CONTRACTOR SHALL VERIFY THE BREAKER LOCATION FOR THE EXISTING LIGHTING CIRCUITS IN EACH PROJECT ROOM. ~ w ® uj 26. NOT USED. co 27. NOT USED. ® z 28. A.I.C. RATING OF EXISTING AND NEW BRKRS 480V, AND 208V, 30: J 480V 208V BRKR AMPS TRIP j 30,000 42,000 1200 cri ® V ,s 30,000 42,000 800 N c 30,000 42,000 400 c0 30,000 42,000 350 25,000 22,000 225 0 L z 25,000 22,000 150 � o d U M 14,000 10,000 100 � "' o 14,000 10,000 70 � ° a 29. HEAVY DUTY FUSED SWITCH W/TIME DELAY DUAL ELEMENT FUSES = 200,000 A.I.C.` LLJ ° QQ 3 � W 1 F GENERAL RISER NOTE: � CD C) . zo ALL EQUIPMENT SHOWN ON THE RISER DIAGRAM ON ° o 0 THIS SHEET, IS EXISTING TO REMAIN UNLESS NOTED OTHERWISE. `A5 C �. • - 4 �Q O .,ice - { sy` •• .°� Q DESIGt1" J 6,, DRAWN M.C. CHECKED , SCALE" -._�._,�. x AS SHOWN DATE _ xc 08 04-98 e PROJ. No. 200017 SHEET No. :t S.M.H ELEC-_TRICA (0 PLAN E -4A