Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
00-0883-058
) ) ]] T T T-T 77 ) 1 1 cn Q CL NORTH TOWER MEDICAL I.C.U. NORTH TOWER SOUTHEAST SIDE ELECTRIC ROOM O.R. ELECTRIC ROOM ► ELECTRICAL NOTES,]> ,T 7) ; }}, m N( ) PAVILLION )� } } � � Z Lu 777 ] ) J))) 4 #4 IN 1-1/4" CONDUIT I 4 #3 IN 1-1/4" CONDUIT 1 . THE CONTRACTOR SHALL ADJUST LENGTH OF PVC PIPE BETWEEN THE MONITOR Fn CC %- 2DLE1-8 (100A.-3P) SENSOR UNITS END BOXES IN ORDER TO PROPERLY FIT WALL AT BOTH ENDS. � m N c�i 480V, 3�, 3W 150A-3P BRANCH BRKR #1 100A-3P BRANCH 'BRKR #8 I I 2. PANEL "E-6" AT EAST TOWER 6th FLOOR IS LOCATED BEHIND THE CENTER u) W in 120/208V, 3�, 4W 4 #4/0 IN EACH 70A-3P BRANCH BRKR #1 I CORE NURSES STATION IN XEROX CLOSET WALL. THE CONTRACTOR SHALL a l o CD OF 2-3 CONDUITS PANEL TO BE USED CONSIDER THAT THE NEW BRANCH CIRCUIT CONDUIT AND WIRE LENGTH OF Lu _j LL 120/208V, 30, 4W IN THIS PROJECT. OF RUN TO BE MINIMUM 100 FEET. (SEE PANEL SCHEDULE THIS SET OF Z N _ \ PANEL TO BE USED 100A-3P BRANCH 225A-3P BRANCH 13 4 0 IN 3" CO PANEL I DRAWINGS SHT. E-7). U z N IN THIS PROJECT. BREAKER BREAKER # / ND. 2E1 a a o 480V, 30, 3W I 3. PANEL RR AT RECOVERY ROOM (CORRIDOR WALL) AREA SECOND FLOOR < n c� (SURGERY DEPT.) PAVILION. THE CONTRACTOR SHALL CONSIDER THAT THE NEW BRANCH CIRCUIT CONDUIT AND WIRE LENGTH OF RUN TO BE MINIMUM OF 50 FEET. (SEE PANEL SCHEDULE THIS SET OF DRAWINGS SHT. E-7) S P PANEL DISTR. P S DISTR. DISTR. „ ��PANEL� "PANEL PANEL 5 KVA "CH2S” »PANEL 150KVA »PANEL ��PANEL PANEL PANEL I 4. PANEL "l El " AT EMERGENCY AREA FIRST FLOOR PAVILION MAIN CL2NB CL2NA CL2S 150 A. 2HDE XFMR. 2DLE 2DLE1 DP RR (EMERGENCY DEPT.) CORRIDOR AT (DOUBLE DOORS). THE CONTRACTOR SHALL Z CONSIDER THAT THE NEW BRANCH CIRCUIT CONDUIT AND WIRE LENGTH OF RUN J SECOND FLOOR = TO BE MINIMUM OF 50 FEET. (SEE PANEL SCHEDULE THIS SET OF DRAWINGS s MAIN ELECTRIC ROOM - NORTH TOWER GENERATOR ROOM - SOUTH TOWER = MAIN ELECTRIC ROOM - SOUTH TOWER I PAVILLION EMERGENCY COORIDOR I SHT. E-3) 2HDE-4 225A BRANCH BRKR.- 4 #3/0 IN 2" C. 5. PANEL "CL2NB" AT THE MEDICAL I.C.U. UNIT - NORTH TOWER SECOND FLOOR z P S I (NURSES STATION). THE CONTRACTOR SHALL CONSIDER THAT THE NEW BRANCH co Ln 75 KVA CIRCUIT CONDUIT AND WIRE LENGTH OF RUN TO BE MINIMUM OF 50 FEET. w w N U. ° c F XFMR. (SEE PANEL SCHEDULE THIS SET OF DRAWINGS SHT. E-7) J Q Z N Lu LE 6. SEE MECHANICAL DRAWING'S PLANS AND ELEVATIONS FOR REFERENCE. a UJI 7. THE MED-AIR 24 VOLT CABLE FURNISHED WITH EQUIPMENT FROM THE MONITOR W z I � Z r CRITICAL POWER I PANEL 1 DLE1-6 PANEL TO THE SENSOR ABOVE THE DOOR PLUGS INTO A JACK RECEPTACLE AT Z z Z W 277/48OV, 30, 4W 1 D�E1 1 E1 W 3" J z 4 #4/0 IN EACH THE MONITOR SENSOR. W J � o < o o m < o NORMAL PWR. o 0 0 8. THE CONTRACTOR SHALL COORDINATE LENGTH OF THE MED-AIR 24 VOLT CABLES r N OF 2-3" CONDUITS o cn TO PANEL m o- m o- m � WITH THE MANUFACTURER. CABLE FURNISHED WITH THE EQUIPMENT. o o 0 10OA-3P BRANCH BR R #o Z cn MDP1 cn w cn w cn w 10OA-3P BRANCH BR R 9. THE MED-AIR EQUIPMENT 24 VOLT CABLES AND THE 120 VOLT FLEX CONDUIT cn 400A 400A BRANCH BRKR y- � DISTR. �® WITH WIRE ENTER THE TOP LEFT SIDE OF THE UNIT. TWO 1/2" KNOCKOUTS W BRANCH 277/480V 3� 4W GENERATOR / r``< PROVIDED IN UNIT. A cn TS-2 PANEL � � ��`�� < BRKR. 400 A. "CDP" SWITCHBOARD I PANEL `" ,,,<,:::_.,:,,...:>.,< cn 10. THE CONTRACTOR SHALL VISIT EACH SITE PRIOR TO PRICING HIS WORK. o = (CONTROL/ "1 HDE1" I E 800 KVA 800 KVA 800 KVA E4 SYNC. BOARD) (CRITICAL) J 400A 150A BRANCH BRKR. # GENERATOR GENERATOR GENERATOR I CRITICAL BRANCH 11 . THE STATUS INDICATOR LIGHTS ARE LOCATED ON THE "SCU" PREWIRED BY THE --d :�j_ m Lu BRANCH SW'BD 400 AMP I NORMAL POWER TO FROM SWBD MANUFACTURER. A' BRKR. EDP2-5, 400A J J J ATS-1 1 HD1(SECT. 3) BRKR. 12 W w cn BRANCH BRKR. G G G (CRITICAL) 1350A-3P ATS-1 LINE UP 12. ALL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE" ..(LATEST `� ��o a AD.,O.PTED EDITION° A.LL OTHER APPLI..CABLE«.<:C.ODE•S,=„�AND,,,-,:STAN..DARDS THIS _:INCGLUDE FIRST FLOOR n n n n ». e .,>.r.>...,. .. U 400A BRANCH BRKR. »s _» » w 4� TlOSE ADOPTED BY THE STATE FIRE MARSHALL RULE 4A-3 014FAC. .�'° 13. THE CONTRACTOR SHALL SATISFACTORILY REPAIR AND/OR` REPEACE` 4EQUIPMENT OR o PART OF STRUCTURE DAMAGED AS A RESULT OF HIS WORK. SURFACES AND FINISHED AREAS SHALL BE RESTORED TO MATCH ADJACENT AREAS. 400A SW'BD EDP-2 BRANCH BRKR. 3 FEEDERS 14. APPROVAL SHALL BE OBTAINED FROM THE ENGINEER PRIOR TO CUTTING OR 400A SW'BD EDP-1 BRANCH BRKR DRILLING ANY STRUCTURAL SUPPORT MEMBERS.15. ALL MATERIALS REMOVED SHALL BE DISPOSED OF AS DIRECTED BY THE SOUTH MIAMIH© ILION LD o MIAMI HOSPITAL MAINTENANCE DEPT. ` MR. JESUS SARDINA PAJDi%,TIAL Er` ME17,?. G E NU'-'*J 16. MODIFY AND REROUTE EXISTING WIRING AS REQUIRED TO ACCOMPLISH INDICATED DIAG"AM WORK AND CONTINUE SERVICE TO LOADS BEYOND AREA IN WHICH WORK IS BEING DONE. NO -SCALE 17. ALL NEW CONDUCTORS USED SHALL BE COPPER. 18. ALL NEW 120 VOLT WIRING WORK SHALL BE RUN IN CONDUIT. PANEL TO BE USED 19. ALL ELECTRICAL MATERIAL SHALL BE U.L. APPROVED. IN THIS PROJECT. PNL PNL TYPICAL CRITICAL POWER 20. THE SCU'S ARE EQUIPPED WITH 30 WATTS OF GERMACIDAL LAMPING PREWIRED 6th FLOOR ER6 E6 FLOOR PANEL. BY MANUFACTURER AND ARE A PART OF TOTAL LOAD LISTED. ° M �t PNL PNL 21 . SEE SHEET E-6 FLOOR PLANS FOR ADDITIONAL GERMACIDAL LAMPS AT 2 LOCATIONS. M "ER5 "E5” 5th FLOOR 22. THE CONTRACTOR SHALL REFER TO ARCHITECTURAL SHEETS A-2, A-3, A-4 & A-5 0 _j FOR FINAL DEMOLITION ROOM AND CEILING PLANS, AND NOTES. THE ARCHITECTURAL - 0 PNL PNL NOTES ON THESE DRAWINGS REFER TO THE REMOVAL AND REINSTALLATION OF PNL PNL EXISTING LIGHTING FIXTURES BY THE ELECTRICAL CONTRACTOR. PLEASE NOTE THAT 4th FLOOR THIS PART OF THE ELECTRICAL WORK IS INCLUDED IN THIS CONTRACT. , PNL PNL 23. ISOLATION ROOMS INCLUDED IN THIS CONTRACT: w Q a. ENDOSCOPY - EAST TOWER ON SHEET E-4. 3rd FLOOR "ER3' "E3" b. EMERGENCY ROOM - FIRST FLOOR PAVILION ON SHEET E-1 . cn NOTE: c. RECOVERY ROOM - SECOND FLOOR PAVILION ON SHEET E-2. PNL PNL 48 HOUR METER READING TAKEN OCTOBER 1998 d. MEDICAL I.C.U. ROOM - SECOND FLOOR NORTH TOWER ON SHEET E-2. " ER2 ,E2 SHOWED A TOTAL MEASURED DEMAND LOAD OF 2nd FLOOR 105 AMP MAXIMUM ON THIS FEEDER. 24. THE ELECTRICAL DEVICES AND OUTLETS SHOWN MOUNTED ON THE WALLS OF THE � TYPICAL LIFE ROOMS INCLUDED IN THIS CONTRACT (NOTE #23 ABOVE) SHALL BE EXISTING TO ■ SAFETY FLOOR REMAIN UNLESS NOTED OTHERWISE AND SHALL REMAIN IN SERVICE. C) co PANEL 200A, FUSED co N SWITCH EDP-1 4 #3/0 THW AL. 25. PRIOR TO STARTING ANY WORK, THE ELECTRICAL CONTRACTOR SHALL VERIFY THE 4 #3 0 THW IN IN 2-1/2" CONDUIT BREAKER LOCATION FOR THE EXISTING LIGHTING CIRCUITS IN EACH PROJECT ROOM. �- 2-1 2" CONDUIT o CRITICAL POWER 26. IN THE EMERGENCY ISOLATION ROOM THE CONTRACTOR SHALL PROVIDE AND INSTALL a BRANCH LIFE SAFETY DISTR. TO NORMAL DISTR. 4 NEW FLUORESCENT LIGHT FIXTURES (EQUAL TO THE ONES BEING REMOVED) IN NEW o POWER BRANCH PANEL POWER SUPPLY PANEL 60A, FUSED DRYWALL CEILING - ADJUST LOCATION OF EXISTING LIGHTING, J-BOXES AND CIRCUIT C/) "EDP2" "EDP1" SWITCH PNL E-3 WIRING AS REQUIRED FOR REMODELING THIS AREA. o LIFE A.T.S. No. 1 27. IN THE RECOVERY ISOLATION ROOM THE CONTRACTOR SHALL PROVIDE AND INSTALL > 4 #3 0 THW IN SAFETY 120/208V 3�, 4W (400 AMP). 3 NEW FLUORESCENT LIGHT FIXTURES EQUAL TO THE ONES BEING REMOVED) IN NEW 2-1 2 CONDUIT A.T.S. No. 2 175 KVA (200 AMP) DRYWALL CEILING - ADJUST LOCATION OF EXISTING LIGHTING, J-BOXES AND CIRCUIT w o . GENERATOR DISTR. f-- z WIRING AS REQUIRED FOR REMODELING THIS AREA. 3150 TTE r•}{•- � PANEL ? i i _ " 200 "DID 28. A.I.C. RATING OF EXISTING AND NEW BRKRS 480V, AND 208V, 30: T E N DOUBLE THROW 200 AMP G J MANUAL TRANSFER SWITCH 480V 208V BRKR AMPS TRIPq�� j .• FIRST FLOOR 30,000 42,000 1200 .••�,< •.; `��, 30,000 42,000 800 ; s> ©, '• J I TO FIRE PUMP. 3 #2/0 30,000 42,000 400 - A.© `_ 9s._ 4 #3 0 THW I N 2-1/2 C. . » THW AL. IN 2" CONDUIT. 30,000 42,000 350 2-1 2" CONDUIT 25 000 22 000 225 Q= '•• �4``.= TO FPL CO. VAULT 1 z� M.C.B. 4, 1200A 3P NORMAL POWER 25,000 22,000 150 14,000 10,000 100 DESIGN JB DP-5 14,000 10,000 70 3P 4 400A DRAWN E.M. 29. HEAVY DUTY FUSED SWITCH W/TIME DELAY DUAL ELEMENT FUSES = 200,000 A.I.C. CHECKED ///�A�q� T TOWE' n"n So O I 0 S I T i L SCALE EAST GENERAL RISER NOTE: As SHOWN DATE .P` AT R' TIAL ALL EQUIPMENT SHOWN ON THE TWO RISER DIAGRAMS ON o8-04-98 I I� I PROJ. No. THIS SHEET, IS EXISTING TO REMAIN UNLESS NOTED OTHERWISE. 9753 NO SCALE SHEET No. E- 5