DOOR SCHEDULE
cli
0.
MK CONDITION TYPE SIZE REMARKS >> > Lu w
E-1 EXISTING WOOD FLUSH 4'-0" X 7'-0" NOTE 1 ; " ' Q z w LO
E-2 EXISTING WOOD FLUSH 4'-0" X 7'-0"
NOTE 1
E-3 EXISTING ALUMINUM STOREFRONT 4'-0" X 7'-0" NOTE 2 + 00 CO)
4 NEW ALUMINUM STOREFRONT 4'-0" X 7'-0" NOTE 3 H co o rn CO
E-5 EXISTING WOOD FLUSH 4'-0" X 7'-0" NOTE 1 V a R o �
E-6 EXISTING WOOD FLUSH 4$-0 X 71-0 NOTE 1 a �: LL
u_u u_u
d
= Z N
Q be ❑ n 1-1 G '��- Q O 0 .
ns ens g G
NOTE 1 PROVIDE SURFACE MOUNTED DOOR CLOSER AND NEW Q I� W
¢° 6 GASKETING AS SPECIFIED IN SECTION 08710.
Li u a �g aa° k� a
un¢ cig G a Agw
n a o a s °Q 58
6
x° E aid NOTE 2 PROVIDE CONCEALED OVERHEAD CLOSER: LCN 2030
Li �.�
] c as a: SERIES FOR OFFSET PIVOT, TWO SPEED ADJUSTABLE WITH
F1 a�
BACKSTOP AND HOLD OPEN FEATURE. PROVIDE VINYL
Li x. "°o as m BULB WEATHERSTRIPPING, OF COLOR TO MATCH FRAME,
® nri °¢ _ ° y e AT FRAME HEAD AND JAMBS.
u u W
ce z a OC
° ® .� NOTE 3 PROVIDE ALL NEW HARDWARE AS SPECIFIED IN SECTION �
w \ a�ff Fag 08410.°` H 3
13 CIO
ci
a
"�J e °" s`°J I I 0 1 0 ® D I I i ° I L n a°• M no
N tj
G ao C �J p oo p o o �G s
EXISTING BUILDING CONSTRUCTION TYPE
40a ���-�-�- �_° �_° �- 0 m -L�J� NFPA 220 TYPE II-222 / SOUTH FLORIDA BUILDING CODE, w
7 I o
® ° ° 1994, TYPE I o
a a
r I 1 W 2
Lu
En
ENDOSCOPY I - ® ® .� a z w
ISOLATION ROOM I ,0,_;O. oe� =6 a d s uj
A-2 & A-2.1 a E a a s�S E a ° GENERAL NOTES �,
a < O m
OWN
1.0 SCOPE: 8.2 DELIVERY OF MATERIALS SHALL BE COORDINATED AND
SCHEDULED WITH THE OWNER'S REPRESENTATIVE. �
1.1 THE CONTRACTOR SHALL PROVIDE ALL LABOR,
MATERIALS, EQUIPMENT, PERMIT FEES TAXES AND 8.3 THE CONTRACTOR SHALL RESTORE THE STAGING AREA Lu
� W
_ _ __ _:FF_ _ SERVICE REQUIRED TO COMPLETE THE PROJECT AS TO ITS ORIGINAL CONDITION, INCLUDING SODDING, � r.�
NOTED IN THE PLANS AND SPECIFICATIONS. THE CURBING AND PAVING WHICH MAY NEED TO BE � W >_
_ _ _ _ _ _ _ _ __ _ _ __ _ _ °R e 3 �� AIA A201 GENERAL CONDITIONS SHALL REMOVED OR DAMAGED DURING THE DURATION OF THE -� w M ca ad
6 • APPLY TO THE PERFORMANCE OF THIS CONTRACT. PROJECT. d =
6th FLOOR - EAST TOWER 1.2 REFER TO SPECIFICATIONS SECTION 01010 FOR 9.0 WORK AT LEVEL 1 SHALL BE COORDINATED TO PERMIT W
A SUMMARY OF THE WORK. INSTALLATION OF ELECTRICAL CONDUIT RUNS TO
1 ISOLATION ROOM LOCATION PLAN N w Nv
� � � o =
$ �� o `a o $ F PANELS. � � ^:�� �-
SCALE: 1'=40'-0' �' I co
ENDOSCOPY e g a - 2.0 CODES AND REGULATIONS: s
j° REMOVE AND REINSTALL EXISTING CEILING GRID, ko a
PROJECT HAS BEEN DESIGNED AND SHALL BE AND LIGHT FIXTURES AS REQUIRED TO PERMIT
ko
INSPECTED AS PER STATE OF FLORIDA CHAPTER 59A-3, THE INSTALLATION AND MODIFICATION
s 3 s 1994 SFBC, NFPA 101, 1994, AND, 1994 ADA. OF ELECTRICAL AND MECHANICAL SYSTEMS. o W
"_ '
s Gg W 3.0 PERMITS: 9.2 REPLACE ANY DAMAGED ALUMINUM CEILING O
:g a °
THE CONTRACTOR SHALL SECURE ALL NECESSARY GRID TO MATCH EXISTING.
BUILDING, PLUMBING, ELECTRICAL, MECHANICAL, 9.3 SEAL PENETRATIONS FOR CONDUITS, PIPING, AND DUCTS
Ig OCCUPANCY AND OTHER PERMITS. IN EXISTING FIRE RATED WALLS WITH FIRE RATED SEALANT
I g
EMERGENCY 4.0 QUALIFICATION OF CONTRACTOR: PER U.L. APPROVED SYSTEM.
I
ISOLATION ROOM 6-------- -------- 9 THE GENERAL CONTRACTOR AND SUB-CONTRACTORS 10.0 SAFETY
A-3 & A-3.1 I Via. R SHALL BE LICENSED BY THE STATE OF FLORIDA, AND 10.1 ALL EQUIPMENT USED ON THE JOB SHALL BE
DADE COUNTY.
� OPERATED PER OSHA REGULATIONS.
--- -- -- I 5.0 EXISTING CONDITIONS: 10.2 DURING ANY WELDING OR SOLDERING OPERATIONS
THE GENERAL CONTRACTOR AND SUB-CONTRACTORS REQUIRING THE USE OF TORCHES, THE CONTRACTOR
SHALL BE REQUIRED TO FIELD CHECK AND VERIFY SHALL MAINTAIN PERSONNEL WITH FIRE EXTINGUISHERS
ALL EXISTING CONDITIONS AND BE RESPONSIBLE FOR AT THE WORK LOCATIONS.
1st FLOOR-MAIN/PAVILION BUILDING COORDINATION OF SAME. NOTIFY THE ARCHITECT IN
ISOLATION ROOM LOCATION PLAN WRITING IF ANY DISCREPANCY EXISTS. 11.0 SCHEDULING
2 SCALE: 1'=40'-O' EMERGENCY 6.0 DO NOT SCALE DRAWINGS 11.1 THE GENERAL CONTRACTOR PRIOR TO
COMMENCING ANY DEMOLITION WORK SHALL
7.0 PROTECTION, CLEAN-UP, AND LIFE SAFETY: PROVIDE A SCHEDULE OF DEMOLITION PROCEDURE &
OPERATIONAL SEQUENCE FOR REVIEW.
7.1 THE CONTRACTOR SHALL PROTECT THE EXISTING 11.2 THE GENERAL CONTRACTOR SHALL COORDINATE
BUILDING, ADJOINING SPACES AND EQUIPMENT FROM z
DAMAGE, AND SHALL BE LIABLE FOR ANY MAGE TO
SCHEDULE WITH THE OWNER FOR ACCESS TO THE O
DA
SAME. SPACE, WORKING HOURS, AND REMOVAL OF
CONSTRUCTION DEBRIS.
DOC ISOLATION �� CI,
ROOMS, A-5.2 7.2 THE CONTRACTOR SHALL PROVIDE FULL HEIGHT DUST
PARTITIONS OR BARRIERS DURING DEMOLITION AND 11.3 DEMOLITION AND CONSTRUCTION REQUIRING POWER OR
® � � � � � CONSTRUCTION WORK. BARRICADING SHALL BE TO DECK NOISE GENERATING TOOLS SHALL BE COORDINATED WITH cM
A-5.3, & A-5.4 >ABOVE, PROVIDING 1 HOUR RATING W/ "C" LABEL DOORS. THE OWNER TO LIMIT THE IMPACT ON HOSPITAL FACILITY 0 J z Lu
€ € € OPERATIONS. LL.
7.3 THE CONTRACTOR SHALL CLEAN UP WORK AREAS ON A
E
€ € o DAILY BASIS , AND CLEAN UP AREAS OUTSIDE THE
I E
� E t BARRICADED AREAS WHICH REMAIN IN USE BY THE 11.4 WHEN INSTALLING PRODUCTS WITH STRONG ODORS, a
OWNER DURING THE CONSTRUCTION PHASE. �i
g THE CONTRACTOR SHALL NOTIFY THE OWNERS
m
REPRESENTATIVE AT LEAST 24 HOURS IN ADVANCE
I Ip 3
E E ° AND SHALL FURNISH AND POST ON THE JOB SITE '
�€€ � I� � , � 7.4 THE CONTRACTOR SHALL PROVIDE, OR COORDINATE WITH ® �
a I OWNER, FOR FIRE WATCH WHEN FIRE SPRINKLER LINES M.S.D.S. I O
xi rri O
I I€ �a @€ �€ ® ae E MAY BE SHUT DOWN FOR RELOCATION. '
€ 63 € � e E
11.5 DELIVERY OF MATERIALS & EQUIPMENT SHALL BE ® pC 9= _
° ° ® COORDINATED WITH THE OWNER TO LIMIT THE IMPACT i-
7.5 THE CONTRACTOR SHALL TEMPORARILY COVER SMOKE O
° V e ON HOSPITAL FACILITY OPERATIONS.
DETECTORS DURING DEMOLITION TO PREVENT ACTIVATION Z Z
ge ® ! m; I qq I BY DUST PARTICLES. w�A
® E 1R H 7.6 THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTERIM 12.0 WARRANTIES: ^ J
LIFE SAFETY MEASURES AS REQUIRED BY THE 12.1 THE CONTRACTOR SHALL WARRANT HIS WORK TO BE
SPECIFICATIONS, SUPPLEMENTARY CONDITIONS SECTION J
i 00800. FREE OF DEFECTS FOR 12 MONTHS FROM DATE OF tlA O d
® $ ACCEPTANCE, EXCEPT FOR STATUTORY OR MANUFACTURER'S ® � N =
g ° 8.0 CONTRACTOR'S STAGING AREA WARRANTIES WHICH MAY EXCEED THE MINIMUM TIME
NOTED ABOVE, SUCH AS EQUIPMENT, COMPRESSORS, ETC.
cn to
13 13® _ ® 8.1 THE CONTRACTOR SHALL USE A DESIGNATED
CONTRACTORS STAGING AREA TO BE DETERMINED BY 13.0 THE ARCHITECT DOES NOT HAVE CONTROL OR CHARGE z
i I I OWNER'S REPRESENTATIVE FOR DELIVERY AND TRANSFER OF, AND SHALL NOT BE HELD RESPONSIBLE FOR = N o
I'C'U' € � � � � OF MATERIALS. CONSTRUCTION MEANS, METHODS, TECHNIQUES, � m
ISOLATION ROOM ° 9 a € SEQUENCES AND PROCEDURES OR FOR SAFETY p
A-5 & A-5.1 g ®® y PRECAUTIONS, AND PROGRAMS IN CONNECTION WITH U ov C
� o 0
THE WORK, FOR THE ACTS OR OMISSIONS OF THE 0 ¢ W vi
CONTRACTOR,
SUB-CONTRACTOR OR ANY OTHER W o W 0
9® i € s e g s I 5 i PERSONS
WITH THEM
THE CONTRACT Q c
THE N
9a � DOCUMENTS. j �LLI
a g i4 ' W rn 0000 or
I- Z rn
5� do E Q N J Lu
9
v
e
� e � @ o � � '/ � 1 � 1 ,rrl:,I,IHI;I I 111� ; , 1 = �- `;- � • � j
L
� � ° ' a I I I 1 =_ -❑ , II //j/ IIIIIIII r tI ,�� '" � �1
f
{ ° ---J -----J 111111111
eQ n €
Liv
€ s€€ Iln IIIII® IIIIIIIII 111111 0 // //// / DESIGN
DRAWN
CHECKED
RECOVERY � ; I = __ - _ - _ ,�.-
_ ; _ / / SCALE
S NOTED
ISOLATION ROOM I �
DAA
A-4 & A-4.1 I =7 /"
' 8-4-98
PROJ. No.
7th FLOOR-MAIN BUILDING 2nd FLOOR-MAIN/PAVILION BUILDING
9736
ISOL�ITION ROOMS LOCATION PLAN ISOLATION ROOMS LOCATION PLAN SHEET No.
4 SCALE: 1•=40'-O' DOC �)SCALE: N �, �;11��\\ ///,' , /'/ LOCATION
N 1':40'-O'
RECOVERY AND ICU
/ / PLANS
Z23� 4 SITE PLAN
SCALE: N.T.S.