Loading...
00-0736-019 REVISIONS BY BATH EXHAUST. DETAIL east wall HVAC DESIGN REQUIRES: YES NO Duct Smoke Detector X 1/4" expansion bolts Fire Da m er s 1" embedment (4) requiered. Smoke Dam er s X ( tYp) - Fire Rated Enclosure AIR ON I Fire Sto in 04" thermofn duct I f-metal wall cap Fire Rated R Ceilin Assembl X to exhaust fan. — I Smoke Control X o; �ENEFRAL NOTES ZONE 1 c: e a backdraft damper 1/4" bird screen LO rust resistant �;°.� `' .� •. DUCTS FROM TOILET ROOMS 54-BALL DISCHARGE TO THE OUTSIDE OF THE BUILDING, SHALL BE TERMINATED NOT LESS THAN 6 INCHES ABOVE THE FINISH FLOOR SURFACE, AND 5HALL BE SCREENED WITH A CORRO51ON RESISTANT 1L1 MATERIAL HAVING A MESH SIZE NOT LARGER THAN 1/2 INCH, (PROVIDE GOOSE NECK OR RAIN CAP ON ROOF ERMiNATiONS) N a CLOTHES DRYER EXHAUST DUCT SHALL NOT BE SCREENED. CLOTHES DRYERS EXHAUST DUCT (OR VENTS) SHALL 11.1 ") COMPLY WITH MANUFACTURERS INSTALLATION INSTRUCTIONS, AIR I-CANDLER INSTALLATION dl BE CONSTRUCTED OF A MINIMUM 26 GAUGE METAL PIPE, t s HAVING A SMOOTH INTERIOR SURFACE WITH JOINTS 0 RUNNING iN THE DIRECTION OF THE AIR FLOW. EXISTING I s DUCTS JOINTS SHALL NOT BE ASSEMBLED WITH SHEET BEDROOM nn// METAL SCREWS OR OTHER FASTENERS WHICH WOULD ,.---------------------- ,------------------------------ 1� T Q EXTEND INTO THE DUCT. ,. , � � Z � � GENERAL - -------------- —1 111 Q •� PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY _. j� \ MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL partition to foyer �, � � V AIR CONDITIONING, HEATING AND VENTILATING; SYSTEM AS 1U� EXISTINCS U1 SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED INSTALL iN ACCORDANCE WITH THE SOUTH FLORIDA DINING 414CFM 1L @ � 0 BUILDING CODE,A-SHRAE, SMACNA, NFPA, AND LOCAL metal stand: :. ?12 duct ORDINANCES. I/4x1-I/2x1-1/2' 4(3/8'x2") anchor bolts. �[ SCOPE OF WORK 14X9" duct board. PROVIDE THE FOLLOWING COMPLETE SYSTEMS 7' a f 1 13x20' duct board. A. SUPPLY DUCT SYSTEM. � � � refri Brant lines to �# ; 248CFM B. EXHAUST SYSTEM FOR BATHROOMS � � � g on roof. SEE M-2, ?9 duct MXB�TN east wall exhaust dap. IT C. AIR CONDITIONINGS UNITS WITH REFRIGERANT PIPING � liquid: 3/S" OD, such 4------- ---- � SEE DETAIL. AND CONTROLS. -1/0" OD insulated '�'--`--"- " ated with PAY FOR ALL FEES, INSPECTIONS AND CONNECTION armaflex 1/8 xl/2 CHARGES REQUIRED drain line 3/S" OD to T T SOCFM exhaust fan VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS I&xlro' wall type grill outside insulated wi (TYPICAL of 3) AND EQUIPMENT -SIZES PRIOR TO DUCT FABRICATION OR to return plenu ' armaflex 3/8x1/2' ' EX15TING INSTALLATION. COORDINATE REQUIREMENTS 70 AVOID _ ; eturn: bifold 232CFM LANAI + � INTERFERENCE WITH OTHER TRADES. refrigerant lines to C/U "2 .S duct 12x12" duct board. ( �Ll GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS on roof. SEE M-2. 42GFM AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM EXISTING O IL DATE OF ACCEPTANCE. liquid: 3/S" OD, suction �4 3/4' OD, insulated with J __T` duct KITCHEN 11- MATERIALS armaflex 3/4"xl/2'. ; uv� ALL DUCTWORK TO BE R-4, drain line 3/4" PYC with H ; .' ,-''� ' ALL DUCT SIZES SHOWN ARE CLEAR IN51DE DIMENSIONS. P trap insulated with i �'�__ ; EXISTINCz PROVIDE HANGERS FOR FLEXIBLE DUCTS OF SHEET METAL a _1 1..1.1 rmaflex 3/4x1/2". � `: ,`y� i I HALL i ?6 duct 30CFM 26 GAUGE, 1-1/2' WIDE AT 5' MAX. SPACING BETWEEN ?4 duct EXISTINGx SUPPORTS. SEE INSTALLATION DETAIL. 14X9" duct board, i BEDROOM 2 a O PROVIDE HANGERS FOR FIBROUS GLASS DUCTS OF SHEET EXI5TING 4_3 >)- � METAL GAUGE 26 OR ANGLE IRON, ADEQUATELY SPACED. _ -_- 10xIQ�" duct board. ? " ' r I r type duct oo PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL ; � diffuser. SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR 252GFM 433CFM 3 INSTALL SINGLE THICKNESS INSTEAD. 14X14" Rio duct board ?9" duct ?10 duct gSC>=1„1 (j)PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY n� OUTLET AND AT EACH DUCT BRANCH. 13' up to second floor. ' ?9>' duct V -14 REFRIGERANT PIPING. SEAMLESS COPPER TYPE 'L' AND provide a Ijxl°1" shaft r� _0 RD OR SOFT DRAWN ON ACR COPPER TUBING WITH in floor passing. 234CFM �[ d WROUGHT COPPER SOLDER i ?S"duct INSULATE ALL REFRIGERANT SUCTION PIPING WITH 1/2' i CLOSED CELL POLYETHYLENE PRE MOLDEVIPE i — INSULATION, WITH AN APPROVED PIPE AND SMOKE JACKET. PAINT ALL EXPOSED INSULATION WITH TWO �oxl0 duct boar � c0 COATS OF WHITE LATEX PAINT. �XISTINCS i i EXISTING —�1 a � PROVIDE AiR CONDITIONING UNITS WITH MATCHING LOW AMiLY LIVING 0 N 0 VOLTAGE HEAT-COOL THERMOSTATS WITH ON-OFF AUTO ' ' X(STINf Z —1 0 5UB E -BASE SWITCH, FURNISHED BY THE EQUIPMENT ' '� E MANUFACTURER. 4 it BEDROOM z ALL AIR CONDITIONING COMPRESSORS SHALL BE , O WARRANTED FOR A MINIMUM OF FiVE YEARS AFTER DATE ' ' _ OF ACCEPTANCE OF THE PROJECT, i it t`l w iR DISTRIBUTION PRODUCTS j: j 0 SHAPE AND SiZE OF LINNERS DIFFUSERS TO BE SLECTED 0 0 BY OWNER AND TO MATCH DUCT CONNECTION AS INDICATED Cj ON THE DRAWINGS. c� di CU PROVIDE FINISHES AND TYPE6F MOUNT IN COORDINATION a WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL — ! DRAWINGS. J r, INSTALLATION ZONE 2 L INSTALL ALL EQUIPMENT IN ACCORDANCE TO THE CD MANUFACTURER'S MANUAL AND RECOMMENDATIONS Q PAYING SPECIAL ATTENTION TO REQUIREDCLEARANCES FOR INSTALLATION, OPERATION AND SERVICE. N W J C'>I GROUND FLOOR PLAN %/4 = 1 0 Date CD c Scale 0 45 _5-4ot�N v Drawn CD Ee C r; Job 0 U Bet L N E U OF 5 1<sete