PLUMBING NOTES
1.0 GENERAL
1,1 PROVIDE C FURNI5H AND INSTALL ) ALL NECESSARY 3/4'
MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL �_ �3/4'
GOLD WATER -
PLUI`1BING SYSTEM AS SHOWN ON THE �E DRAWINGS AND 6UPPLY POT WAtER
SUPPLY
HEREIN SPECIFIED. INSTALL IN ACCORDANCE WITH THE GATE VALVE
SOUTH FLORIDA BUILDING CODE AND LOCAL ORDINANCES. 3/4' RELIEF LiNE
OU76IDE OF BUILDiNG
GRILL 6' ABOVEIN161 I:D `H�J�`w
12 SCOPE OF UUORK : GROUND
ACME FRE56URE 6 TEMPERATURE a, •,uc
PROVIDE THE FOLLOWING SYSTEMS RELIEF VALVE
A. SANITARY COLLECTION, ELECTRIC WATER PEAtER___� �
a , �
WITP 5-YEAR WARRANTY, )�'•.; \p
GLA6 LfNED TAN DOUBLE
B. DOMESTIQ.4OT AND COLD WATER. 8 TANK-,
NON-CONCURRENT
C. AIR CONDITIONING= CONDENSATE. ENERGYEFRCIENT INSULATI ON
r`rr' +�1,,,�
MEETING A6NRAE 90A-IS60
I'1INIMUM IN6ULATION R-16
D. NEAT RECOVERY CONNECTIONS IF NECESSARY.
13 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION 111
..
CHARGES REQUIRED 9�; r�
�
1,4 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIM DRAIN VAL ENSIONS N
WITH PIPE, FIXTURES, AND EQUIPMENT SIZES PRIOR TO FABRICATfGNRINSTALLATfO1�00RDi`ATE REQUIREMENTS � .�G1FIG utit � . �� 'R DNtAIL Q
TO AVOID INTERFERENCE WITH OTHER TRADES,
v�
1.5 SUBMIT SHOP DRAWINGS FOR ARCHITECT / ENGINEER i � H_ in
APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR I I
INSTALLATION OF EQUIPMENT AND MATERIALS, i O � r
" 1.ro GUARANTEE ALL LUORK FREE OF DEFECTS IN MATERIALS
AND WORKM,4NSHIP FORA PERIOD OF ONE YEAR FROM —
I Z
D OF ACCEPTANCE. I w
MATERIAL5
I
PROVIDE SHUT-OFF VA EACH FIXTURE FOR EAC FIXTURE AND AIR , � w� �
CH,4MBER5 WHERE SHOWN AND WHERE REQUIRED FOR
I LLl U V
PROPER PERFORMANCE OF THE SYSTEM.
2.2 PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING-,: TO ---------------
EQUIPMENT OF DISSIMILAR METALS. USE CLAMPS AND
FASTENERS OF SIMILAR METALS OR ISOLATE THEMOM
PIPING AND SLABS TO PREVENT CORROSION,
2.3 PIPING
2.3.1 DOMESTICHOT AND COLD LllATER: COPPER TUE31NGYFE L
UNDERGROUND AND M ABOVEGROUND WITH SOLDER JOINTS.
W EXISTING
WOG BRONZE VALVES 125 P.S.1, MIN. PROVIDE PRE-MOLDED GARAGE r V.T.R a'
3/4" FIBERGLASS INSULATION FOR HOT WATER LINES. I It.R.
PROVIDE POLYPROPYLENE SLEEVES TO SEPERATE COPPER i ..[STING 4'
PIPE FROM CONCRETE. - USE CONTINUOUS PIPE UNDER I TO EXIST. SEPTIC TANK
'
FLOOR SLABS - NO FITTINGS. I TIE T 2•3' �1i8'/Ft
--------------------------- -------------- � EXIST,
UJTR. LINE _
.3.2 SANITARY WASTE AND VENT: _,____
DRAIN PIPE AND FITTINGS WHEN 8 WHERE , , �3/�' 4'
ALLOWED BY THE LOCAL JURISDICTION. r------- RELOCATED �---- - _�, 2' V.T.R.
WATER NEATER
2.3.3 A/C CONDENSATE: PVC SCEDULE 40 PIPE AND FITTINGS. I
I 11 EXISTINCs EXISTA' O
HOT ATER LINE �
I I EXIOTIW
I _µ
I V
00
C11IN LU
00 LLI
/ i X16T1
p RY � EXI TING j I D LI
NEW
EXIST p 'YT.R. LIA
I
I I
I I
LLI m
t m
I I
I I ! Q
I I y 'V LL
LLJ
I I z r y
o
ELECTRIC WAT R HEATER SCHEDULE
I I
o ' ' Q)
UNIT DESIGNATION E.UU.N, I I � � _� �
MANUFACTURER RUUD
a -
MODEL No. PE (o-2 o
GALLONS CAPACITY 65 i i 0 —1 3 OL
"'' SERVICE TEMPERATURE 120 °F
UPPER ELEMENT 4500 W Q
0
LOWER ELEMENT 4500 W Iu
g TOTAL WATTS 4500 U (s) Cn
ELECT, SERVICE AVAILABLE 240-I-GAO 0
CD LOCATION SEE PLANS
SANITARY PIPE SLOPE NOTES
z REMARKS : � ) TWO ELEMENTS NOM CONCURR. 2" OR LESS 1/4" SLOPE
CD EF= .88 3" OR 4" 1/8" SLOPE
/
cn
CD
3
O
L
N
Date
0 06-21-00
3
Sca I�
z 45 _a 40WN
Drawn
.L
JA/tllE
Job
2009
w
F L E3 ING
s�,��t l�M
. cn
GROUND F-LoofR FLAN 1/411 _ -011
/
Of 5h��ta
I