00-0445-013 S.- *
LJJ I
• a,
> 1 i ol
• I I
/ I
I_I.-I T- r-
00 MA I0014885
RICE CHAEL,A.I
THOMAS T.COOPER, A.I.A.1 "AA4486
Lr) --.—.—._._. ._._._._._.�
• j i t I I j l I I I � I I � I
- - - - - — - - - - - - - - - - - - - - - - - - - - - - -- - - - - - -
j. I i i t I I I I I { i I i - - - - - - - - - - - - - - - - — --i - - - -
! SUNSET I DRIVE
S.W. 72NQ STREET
SUNSET DRIVE I ® E
- ------------- Mi LIGHT
-t- r -T a POLE e..
LU
I• >
- - <
l._. I EX(ST. BLDCs. TOBEDE OLISI r ' W D f� o
_._.1._._.—._._.—._ V
Lo I I I I XIST. O ® 8 y
IOL X
• I I I,— — — I._._I_._._.
I PPIUER
U-
P-
4-J >"
Ln
_ 00
to 0
I I I - - .......
RT V ° o
j
L------ ...... (D
; CIO Ln
cl�, 1A 0 0
r�,l 00 w °
= 15' REMOVE
r-- EXIST.WOOD
i 10 STRUCTURE L U
SITE OF WORK XIST. �
TuRB U
fee
. I
I
I
W.
P UiER
ROLE
GENERAL NOTES: DEMOLITION I °
EXIST.
1—Contractor shall verify with all utilities companies (Gas, Electric,Phone, etc.), and POUTER
stake out in the field all underground utilities known or encountered prior to proceeding POLE
with excavation work. Owner shall not authorize any improvement or demolition work j
until permit is secured from the agencies having jurisdiction. `�
° o
2-The Demolition Contractor shall comply with the South Florida Building Code and
all other applicable Municipal, State, and Federal Regulations.
removal of structural members required b ments I w o
3—Airy demolition and/or olition atn q Y these docu
shall be checked by the Architect/Falgineer prior to removal. Any additional I W ® % LU
documentation that may be occasioned shall be prepared and approved before I w ® � D U l.2-
=
continuation of demolition activities. I .
w Z U
4—Demolish all existing buildings, trees (as shown on Landscape Architecture I U t
Drawings), paving as required and haul debris from site. I •
Z < V kn
I � °
5—protect the existing garden wall, trees to be saved and other items as directed by the I `" :�
Architect duruig demolition and construction I U co
6—Remove existing non-usable Heating, Ventilating, and Air Conditioning equipment
Ln B
and ductwork on the interior and exterior of the project area.
EXIST.
tA I=
L(CzNT � V)
7—Remove acid permanently cap all plumbing 1une-s, on the interior and exterior of the POLE
project area.
� I
8—Coordinate all demolition activities with the phased new construction as indicated on
_ the Construction Documents.
s
E 9—Salvage elements that are scheduled to be re-installed; all other debris shall be
U ,; o removed form the premises mid disposed of in strict accordance with all applicable
7 0 regulations.
Yi
't v)
7 't X 10--Contractor to carefully remove the coral rock pavers and deliver to 3741-3 Segovia
v ° 3 Avenue, Coral Gables, Florida -
3 I
a 3
I 1--Contractor to carefully remove/store tine balls with base on the existing columns to be
i o a reinstalled on tine new wall. DATE : �a�ienOOm
�o N
3 �o Jos No :
ry
o �- DWNBY : COMPUTER STU01 www.TAXIS—usa.com
SITE F:1L AN .- EX15TING CONDITIONS C H K B Y : Marice G+lael
a a �
Q
�:2 6C ALE- 1"=20'
NOTE: FOR ADDITIONAL 61TE INFORMATION SEA CIVIL 4 LANDSCAPE D165, R E V I S I ON
LO
N T/1
0 - 0
Y V 1
V
n OF
L
[O
J7
SHEET No .
�� ��� ' Ijl i,..i '.1 pit i - _._ .... � � �•�