PLUMBING GENERAL moms LUM IN FIXTURE SCHEDULE PLUMBING SYMBOL LEGEND �� BIiD/PERMITW/18/
+ r _ _- _ . ._ _ _
I _ 0,AV._E R S REV_f-!-14
GENERAL CONDITIONS 3NS SYN DIE- IPT ION PAU AC TI AR MCIEL T &144E ClXL;2/F I N I SH VALVE/FIYXET A SS�i FS F-ilRS �
-
DF2 WATER F(ltaNTAIN/ADA ELKAY EEFSA-8 - STA'i DIAR D �
1. 114E ENGINEER SHA:1_L BE iNNEDIATELY BE NOTIFIED OF ANY AND ALL EXISTING FIELD CONDITIONS W"CH DEVIATE FROM 'W4?1AT
SYMBOL DESCRI;'EON AI38f2EV. -- --- --- ---
IS SHO'hN ON THE PLANS. CONTRACTOR IS RESPONSIBLE TO PROVIDE P,R1C'ING FOR A COMPLETE !NSTALLATION INCLUDING ANY F01 A FLOOR DRAIN 1 LIGHT DUTY 143SA414 30600-50 BODY /11 TRAP CAST IRt;IN IPV 3$250 SERIES A OR S 5' NIKALOY STRAINER AS REQ' D.
COSTS ASSOCIATED WITH FIELD CONDITIONS AT THE T'JAE OF BIDDING. LY5 LAVATORY / WALL HUAIG / ADA AFRICAN STD. 0355.027 LUCEFu� 'Ad ITE 7502, 170 - LIGHT LINE DENOTES EXISTING PIPING; HEAVY LINE DENOTES NEW PIPING
2. iT SHALL BE THE RESPONSIBIUTY OF ME PLIJ148ING CGNIRACTGR FOR THE ADVANCED ORDERING OF LONG LEAD ITEMS 50 SK7 LQIJ'U SEW / SINGLE / ADA KINWFED -SL-202 KITCHEN SS GERBIER-CO-44-116 20'x2(Y
DELIVERY 'ALL NOT INTERFERE Mq4 ME PRODUCTION OF 0114ER TRADES RESULTING IN ANY DOAN OR LAG TiME. 'jC6 WATER CLOS ___ CHURCH_ - ..___ - _ _. ____ _ DOMESTIC OR POTABLE COLD WATER CW
3. iT SHALL BE THE RESPONSiB1UlY OF THE PLUMBING CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION EVH WATER HATER, ELECTRIC WAllFM VHiTE' 14120L5DS 1_04BDY - PROVIDE P&T 120 VOLT, 1500 VATT Ei-EMENT
- _ DOMESTIC HOT WNATER 110' f HW
NECESSARY TO ACCOMPLISH liiE 4hK.42K SHOW'dJ AND%O12 NOTED ON THE DRAWINGS. ME PLUMBING CONTRACTOR MALL INSTALL ALL t- -r-- �
NECESSARY OFFSETS, BENDS, AND TRANSITIONS AS REQUIRED TO PROVIDE A COMPLETE AND FULLY OPERATIVE SYSTEM. - ��,�... � „p,��, _ -_.__- -._. _._ d �d,,,,_._ s__.__-_ .--..._ r _ _.__ . ._ -, i��a �� _ ___ �- _� -- --,-
NOTES: -°----° - - - °---�-'w DC�+�EsTIC FOOT WA F{
-TER RETURN 'AR
A. CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES. INSPECTIONS, TESTS, AND ALL REQUIRED INSURANCE FOR PROTECTION -----140-----•--- HOT WATER 140• f 140 �- ---- -- ----
AGAINST PUBLIC UABIUT'Y AND PROPERTY OAMAGE FOR Ti4E DURATION OF THE WORK. I. FIXTURES LISTED ON IMS SCHEDULE COMPLY WIM SOUTH FLORIDA BUILDING CODE TABLE 46--R2 FOR WATER CONSUMPiION IN PLUMBING FIXTURES. � ( )
5. AFTER BiD SELECiION AND PRIOR TO C'ONMENCEMENT OF ''WORK, THE PLU14LAING CONTRACTOR SHALL SUBMIT SIX (6) COPIES OF -- -- F •------- FIRE PRO fEC TiON WATER LINE F _
MANUFACTURERS SPECIFICATIONS, PRESENTED IN NOTEBOOK OR A SIMILARLY BOUND FASHION, FOR ALL FIXiURES, PIPING, � EXIS nNG 3" VTR
EQUIPMENT AND MATERIALS, AS STATED ON TIRE SCHEDULES AND/OR ME CRA-RINGS, THE RESPGNSIBiUTY TO ACCEPT OR A_ - RA - -- RAIN WATER LEADER RW! ��_�`���
REJECT ANY PROPOSED SUBSTITUTION REMAINS 4TH ME PROJECT A'1RC;HITECT/ENGlNEER. ME CONTRACTOR MAY AT HIS � /� \ � � CONSULTANT: �
JUDGMENT USE ANY ARTICLE. GEACE. PRODUCT OR MATERIALS. 4lklCli IN ME JIJOC-.MENT OF ME PROJECT ENGINEER AS �� -2 2�` I �----_ SD �-- RAINWATER Oft STORM DRAIN SD _ --
SPECIFICALLY EXPRESSED IN Vv mNG, IS EQUAL TO THE ARTICLE, DEVICE. PRODUCT OR MATERIAL SPECIFIED.
2-f
i -- CD -- -- CONDENSATE DRAIN LINE CD
6. IT SHALL NOT BE THE !N TENT OF THESE DRAWINGS TO SHOW EVERY MINOR DE TAIL OF CONSTRUCTION OR RENOVATION. PIPING, -, w
RUNS HEREIN ARE SHO'M DIAGRAMMAiTCALY; DO NOT SCALE GRAMNGS FOR LOCATIONS. EXACT ROUTING SHALL BE DETERMINED /�_2 1 1 °- - R'►11-- ---°- RECLAIMED OR GRAY WATER Ri'd
IN ME FIELD, UNLESS OTHERWISE NOTED. LOCATION OF PLUMBING FIXTURES MAY CHANGE. VERIFY EXACT LOCATION VAM � 4�u �tiG�l�6it1?t4 lI'fC.
ARCHITECT/ENGINEER PRIOR TO INSTALLATION. i I - AW_ . ..� ACID WASTE AW +CONSULINNO OA4GEf419R3
'
WORKMANSHIP , �; ? I _�-EXISTiNG GIN - GREASE WAS TE GW 3401 SW 47th Ave. Suite 402
CBrtift-ote No. ET3G003720
• -----N- IW r INDIRECT OR S,VE WASTE SW
7. ALL WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR iN A FIRST CLASS 'AN)RKMANSHIP LIKE MANNER. SAJD � � � � % �v!�. florfL+a 1331 t
CONTRACTOR SHALL MEET ALL RE9i1iREMENTS SET FORTH B'e' LOCAL ORDINANCE AND/OR GOV>+12,1iNL' AUMGRITiES. ALL LABOR i tl2 I �� ___ �+ r
P£RFGFNED AND MATERIALS USED SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE NATIONAL, STATE, LOCAL CODES AND � ``� •�'� i �/2� �. __ �. r _ SANITARY, SOIL OR 'HASTE SAN Ph e�4-J41-2Qt4 Fx 583-2 43
SK7 �� 1 2 -. 2 3 { .-_TPL TRAP PRiMER LINE TPL rip ,IUD owes"
C� K.�J59.2
ORDINANCES. t�� �• ��•
8. ME PLUMBING CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR TO ORIG+yAL CONDITION ANY AtVO ALL DAMAGES TO BUILDING / i ( 2 ---" - A -'" -� COMPRESSED AIR AIR
SURFACES, BUILDING SLABS, EQUIPMENT, UTIU TIES, AND FURNISHINGS CAUSED BY ME CONTRACTOR DURING THE PERFORMANCE � ____ o ___ OXYGEN OX --- -----
OF 4WGRK, CORRECTION OF ANY DEFECTS SHALL BE COMPLETED VATHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT =y trs r (�
OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION 'MilCH MAY HAVE BEEN OAMAGED THEREBY. ' � Y4 t t i �2 2 I i r __,ATV^------ MEDICAL VACUUM HV
+ PIPING I r ------ LV LABORATORY VACUUM LINE LV
9. UNLESS OTHERWISE NOTED, ALL POTABLE WATER, RELIEF, DRIP, AND CONOENSATE RISER PIPING SHALL BE TYPE 1' OR /.� �4 r j 3�� �Fp1 20 `�-- 1 P - ------ UT?IJID PROPANE LP
TYPE "K" COPPER V'ATH 'AROUGHT COPPER OR BRASS RTt1NGS. THE PLUMBING CONTRACTOR SHALL RUN BUILDING CONDENSATE I
RISER YAM STUB-GUTS AT THE AIR CONDITIONING UNITS. THE MECHANICAL CONTRACTOR IS RESPONSIBLE TO CONNECT HIS � � � D TPV Y fDl �WC$ 3 G �.�. NATURAL GAS LOW PRESSURE G
EQUIPMENT TO MOS�E BUILDING CONDENSATE DRAINS. � r � �� 1MC$
MATERIALS FOR COMPRESSED GAS AND/OR COMBUSTABLE GAS PIPING AND SL£EMNG WLL APPEAR ON PROJECT GRAVANGS. Y4 r j - - 3 ---- -- --FOS - FUEL OIL SUPPLY FOS
10. ME COLD 'WATER PIPE FOR THE PURPOSE OF GROIJNDiNG ELECTRICAL EQUIPMENT SHALL NOT BE A DEAD ENO CAI' BUT SHALL Y4 TV LINE � � �Ih 1S1<'��� 3- - -- -- -FOR-- FUEL OiL RETURN FOR .;
HAVE A LOOP FORMED WWTIH A TEE FITTING. MERE SHALL BE NO VALVE iNSTA.LLEO ALONG THAT LINE 8E rACEN THE MAIN
SERVICE SHUTOFF VALVE AND THE END LOOP. ( 3# "w-EXISTING 3" `°AV--°-- ACiD VENT HV
11, ANY BUILDING HOT VYATER SERVICE HAVING MORE MAN 30 LINEAR FEET OF PiPiNG AS MEASURED FROM THE OUTLET OF THE ( -°�--°--°�FOV -- - FUEL OIL 4'ENT IrOV
WATER 14EAIER AND ANY 140T HATER REGRCLILATTON RETURN LINE SHALL T� INSULATED 'AITH MINIMUM 1" NOMINAL WALL Fo TpV A ' ._ /
THICKNESS CLOSED CELL 'IMCOA" INSULATION 'MM A MINIMUM DENSITY OF 1.5 LBJ.CU.FT.. iNTTsRIOR CONGENSAIE DRAIN y --_�V °- _. VErdT LINE -- SANITARY WASTE V
PIPING RUNNING HORIZONTALLY SHALL BE INSULATED Mill MaN1MUM 5/8" THICK •MCOA" INSULAnON. ALL EXPOSED 3's" DRAIN PAN UNE-� � 't ►
PIPING OF ALL HANDICAPPED ACCT=SSIBLE LAVATORIES SHALL BE iNSULATE0 Q MI "TRUEBRO" FASTENING SYSTEM INSULATION; t ��� ;� RISER 00'04 (ELBOW) ♦�
iNSTALLATIGN USING TAPE AND/OR WIRE IS NOT ACCEPTABLE.
TIE INTO EXISTlI'1G-�� � � - - ---.----f,) RISER UP (ELBOW)
12. UNLESS OMER'McE NOTED, ALL BUtLDING GRAINS, DRAINS, WASTE, VENT, DISCHARGE. RAIN'tVA1ER ANO/OR STORM DRAIN ;�
LEADERS AND/OR CONDUCTORS SHALL BE NO-HUB SERVICE ."EIGHT CAST IRON. Y4 CW LINE li �, --.�-� RISE OR DROP `
13. CCMBIJSIiBLE PIPING 'PALL NOT BE PERMITTED IN EXPOSED AREAS. IN RETURN AIR PLENUMS OR CEILING SPACES " m ,...
EXISTING Y4 CW LINE �
USED AS RETURN AIR PLENUMS - "-' GATE OR BALL SHUT-OFF VALVE AS REQ�D GV f
(STOP VALVES NOT SH0M ON PLANS)
,NSTALLATTON SANITARY SNEyER , � 1
11. ALL VA3RK SHALL BE COORDINATEO WiTH OTHER TRADES TO AV"D ANY CGNFUCTS IN LOCATIONS FOR DUCTSWORK, DIFFUSERS, � BALL VALVE BV
G'LLES, REGISTERS, PIPING, CONDUIT, EQUIPMENT, ETC., AND NOT TO CAUSE ANY iNTERFERENCZ WITH ME PROGRESS OF RISER DIAGRAM
CONSTRUCTION. DOMESTIC 1I r/1 1 _ -� ___� ._.__. . C-LOBE VALVE GLV xe inwho
RISER DIAGRAM
15, THERE DISSIMILAR VETALS ARE TO BE JOINED, APPROVED INSULATING D+ELi:CTRIC UNIONS SHALL BE USED. NO SCALE REDUCER
16. ',~,HERE CORE OWLUNG OF STRUCTURAL SLABS, WALLS OR PARTITIONS IS REt�1J1R£D ME CGNIT2ACTC)R SHALT_ SEAL OPENINGS NO SCALE -- --�---- PRESSURE BSc TEMP. RELIEF VALVE PdcT
WATERTIGHT AFTER PIPING HAS BEEN INSTALLED. LOCATION OF CORED HOLES SHALL BE COORDINATED IMM THE OWW iER, AND U. 0
WTH ME LOCATION OF EQUIPMENT IN A MANNER TO BE CLEAN AND FUNCTONAL. ME CONTRACTOR SHALL INSTALL ONLY 04NE '4.0,/
SW41
PIPE PER HOLE AND SEAL ME CPENING AROUND THE PIPE AS SPECIFIED. --' NG CHECK VALVE CHV a
EQUIPMENT AND MATERIALS BALANCING VALVE BLV
CEMENT rsMSFH OR FINI•,;,T4E0 F100R (AS PER ARCH PLANS)
17. UNLESS NOTED AS EXISTING, ALL EQUIPMENT INCLUDING FIXTURES, PUMPS, TANKS, PIPING, FITTINGS, VALVES, METERING CONCRETE FILL to
DEIACES AND GAUGES SHALL BE NEW AND SHALL BEAR U.L., F.M. OR OTHER APPLICABLE TESTING LABORATORY LAT3EL. SLOTTED AS N1t�(T.£ E NZE CRATE ,E�- UNOaN � , �
td�1b�ItiE�R£Q'Q � (fit AS OTHI<RNASE NOTED) _..._-- -��...r...._._.m. FLANGE r�
18. ME PLUMBING CONTRACTOR SHALL PROVIDE Fi_EKSLE, 'IRE BRAIDED, SPIRAL REINFORCED tir6E CONNECTIONS TO ALL PUMPS °`"'"°� S C:.i
AND MECIHANICAL EQUPMENT
----•-�•-----•-{�<}--- VALVED AND CAPPED END
19. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WATER METERS AND ENCLOSURES UNLESS OT14ERYASE NOTED. s
"; , <.. ...�_�._.._...�..� CAPPED ENO
20. ME CONTRACTOR SHALL FURNISH AND INSTALL ANY REQUIRED $ACKFLOW PREVENTERS Cif MAIN 'WATER SUPPLY. HOT MAiER OUT; SET x
1�THERMOSTAT FOR 110' F -- ----�t'�--�� HOSE BIBB IMTH VACUUM BREAKER HO +
21. THE CONTRACTOR SHALL FURNISH AND INSTALL READILY ACCESSIBLE SHUTOFF VALVES IN ALL BRANCH WATER LINES SEWANG 1 iPg PRIMER TAPPING �
SiRUCTURA.L SLAB �� Y .t:
ANY ROOM HAVING PLUMBING FIXTURES. SHUTOFF VALVES SHALL BE CAST BRONZE, 3 PIECE BALL TYPE VALVE VATH P1FE W f/ COPPER UNE ClXD WATER SUPPLY ____. �--- PRESSURE DEDUCING (SPECIFY TYPE) PR
SEATS. ALL FIXTURES SHALL BE PROVIDED 'MTH READILY ACCESSIBLE STOP VALVES. P�E SIZEy VARIES IN POLY SLEEVE TO
GAS VAL'+'ES SHALL HAVE TEFLON DISC AND PACKING, AND SHALL BE A.G.A. LABORATORIES CERiTFIED. 4T VMS£ N$OTEO. TRAP PRIMER VALE PRESSURE GAUGE PG aI
GAZE VALVES, PLUG VALVES AND STEEL BODY VALVES ARE NOT PERMITTED FOR USE 45�1T1H GAS. """"-' """""
22. THE CONTRACTOR SHALL FURNISH AND INSTALL APPROVED AIR CHAMBERS AT EACH PLUMBING FIXTURE. PLUS PROVIDE AND BEAT TRAP --+
INSTALL ALL WATER HAMMER SHOCK ARRESTCRS AS SHOWN. ALL THREADED 'WATER OUTLETS EXCEPT FOR AUTOMATIC CLOTHES
( TIP ) S+HUtOFF T}1ERMO�dETER T
AND AUTOMATIC DISH WASHERS SHALL BE FURNISHED WMM APPROVED VACUUM BREAXERS.
- .�.-----_-��T FLOO'R DRAIN TRAP PRIMED FD/1P
FLOOR DRAIN W TN
SAFETY /� TRAP PRIMER CONNECTION �.P�cT I2ElJEF Lets£ 10 ouTS•IcE Gf ----- FLOOR DRAIN ( RISER FD
24. PROVIDE FIRE RETARDANT U.L APPROVED SEALANT C•N ALL PENETRATIONS OF FIRE RATED STRUCTURAL SLA..BS, WALLS AND A / CRADihG, 1PER PERVIOUS S' ABOVE )
PARTITIONS. IT SHALL BE THE RES'ONS LITY OF 1IHE PLUMBING CONTRACTOR TO VfJ2IFY', PRIOR TO SUBMITTING TAO. - BRA{ AT PERVIOUS LOCATION
LOCATIONS OF ALL SUCH FIRE RATED STRUCTUURAL 'SLABS, WALLS AND PARTITIONS. --- NO SCALE Pp-ELR4 � - -��' WATER CLOSET (RISER) 11+C
25. ME PLUMBING CONTRACTOR SHALL KEEP ALL AREAS ;N 4VHiC►H AlORK iS BEING PERFORMED, FREE FRCM DEBRIS AT ALL VIES I STEEL ST-4CLF SH.±LL SE MADE OF 2" x 2' ROOF DRAIN RD
AND SAID AREAS SHALL BE LEFT BROO?A CLEAN AT TT1E END OF EACH WORKING DAY. -- �--- � � x 1/4" ANGLE 4RC+N, rALCED ()Z CA' ~�
LEGS SHALL T3r]LT TTACI tO T+r�rv, 2 REAR � WCO WALL CLEAN--OUT ( RISER ) CO
COMPLETION I LEGS �HA1 131E ATTAg4>FO TO BLOCK
{ 'NALL '4 111 2-3/8 LAG &XTS N/ ���
26. ME PLUMBING CON1RACTOR SHALL PROVIDE A COMPLETE SET OF AS BUILT DRAWINGS TO THE ENGINEER UPON CCIIAPLEP?ON OF LEAD ANCHO►2S. 5TC14 T'0 SI ASO`.rE `' FLOOR OR GRADE CLEAN-OUT F/GOO --1
•+ � I !,IOP :INK AND l,AATgH GiVENS`iC.NS OF FCO
iNSTALLATION. IF FIELD CHA14CES ARE MADE WHICH DEVIATE FROM ENGINEERING DRAWINGS TO TT4E EXTENT THAT T14E -- j' ..IES ,300 IAR" PAN. SCHARP AC AIR CHAMBER
BUILDING DEPA,RT?AENT REQUIRES TIiESE CHANGES BE INCGRFORATED PRIOR TO INSisECT10N, T14E CGtd1RACT0+R SHALL PROVIDE sT,yNLESS STl'£L CLA!AP ' � OR SMOCK ABSORBER AC
SKETCHES TO THE ENGINEER FOR INCORPORATION INTO THE BUILDING PLANS, ENGINEERING EXPENSES THAT ARE INr,JRRED DUE 111 @lilt �
TO REViSiONS OR SUBSTITUTIONS REQUESTED BY PHE CGNiRACTGR SHALL BE PAID FCIR BY THAT CONTRACTOR. � - STAINLESS S1E£L BOLTS TANK &ASSOCIATES
DRAM POINT OF CONNECTION BETWEEN INCORPORATED
?. PLUMBING CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND 4iGRKMANSHIP TO BE FREE FROM DEFECTS FOR A PERM OF NOT � ELASTC4.4E>+'.1C CASKET � ! GALVANIZED DRAIN PAN. X AND Y u;MENSICINS NEW & EXISiTING SYSTEM OR 'WORK �� ��
2 _U 1111111
LESS MAN ONE (1) YEAR FROM DATE OF ACCEPTANCE, AND ALL GUARANTEES AND NARRANTIES SHALL BE DELIVERED TO THE TO BE TANK DIA.'sETER PLUS 2' MAX. Alit��Gl.lJ�� ' Al
OWNER. � rnR£ArEO 1'EX)HT ° 3' �iL VENT THROUGH ROOF VTR
*
Cl EANOUt PL
GENERAL CCNDI TIONS FOR RENOVATIONS
li'L La+�+"erdl�efbiids �J9
S TANLEss STEEL
EEL
28. IF THE NATURE OF THIS CONTRACT INVOLVES EXTE+^ISI'dE REMODELING OF EXISTING FACILITIES, THE PLUMBING CONTRACTOR �YAND F GOVfR
SHALL. VISIT 114E XQ SITE PRIOR TO 810 AND VERFY ALL CONDITIONS, LOCATIONS, DIMENSIONS, MATERIALS, ELEVATIONS -- .- AND fRA!AE AUX DRAIN PAN LGrS DO'NFI �!b C{�}:gY7
TO M�/,IA.NiTIJR'S SINK BELOW
AND COUNTS AS SHO'0" ANO/OR NOTED ON THE DRA`,M1NGS AND ,NCLUOE IN THE BID ANY AND ALL FABRICATION REQUIRED PRIOR +e
TO INSTALLATION. THE CONTRACTOR SHALL 4ERIF I SIZE, `ELEVATION, M40 PRESENT STATE OF ALL EXISTING UPLIPES, AND ~TOTES AG ABOVE GRADE LV LAVATORY
SHALL NOTIFY ENGINEER IF PiPE SIZE CHANGE'S ARE REQUIRED BECAUSE OF EXISTING CONDITIONS.
29 THE PLUl�Ii31NG CCNVTRACTCR SHALL DETERMINE T1H£ EXTENT t0 VAiiCH EXISTING PIPING WILL HAVE TO BE REROUTED, i I. `:££ RISER DIAGRAM FOR PIPE SILES. AL ALUMINUM LW LIQUID WASTE -- _
RELOCATED, OR RECONNECTED, AND ME AMOUNT OF AODiiiONAL 'i"K WAHiCH MAY BE REQUIRED DUE TO THE PHYSICAL 16111113111 2. FOE 'NATFYING FIXTURE S SCh'EDIJLE 13EP BACK FLOW PREVENTOR hlri MANHOLE DRAWING TITLE:
CONDITIONS OF THE PIPING SHALL BE PERFORMED UNDER THIS CONTRACT vATHOUT ADDITIONAL CHARGES TO THE OWNER HUBLESS PIPE JrANT W/ � FOR 'HATER HEATER �ECif1CAM�NS BG BELOW GRADE tAs MOP SINK
KID SiH1ELC£D COUPUNG OR BRONZE NO NICKEL BRONZE NOTF-15 I
30. ME CC.."IRACTCR SHALL COORDINATE HiS AICIRK WITH THE ACTUAL DIMENSIONS AND ROUGH-IN LOCATIONS FOR ME EQUIPMENT iNST AL FUti CAST �2Ci'd
BEING REUSED. 1E111118111 IFISTALLATIONS I3SP BLACK STEEL PiPE OU OUTSIDE DIAMETER
- SHELF MOUNTED WATER HEATER
t�3 CATCH BASIN F2Q ROUGH BRASS
C� Cl CAST IRON RC ROUGH CHROME --- -i
_. 31 PLUMBING EQUIPMENT THAT IS TO REUNN IN AREAS 'A"AIERE THE ;NSTALLATION 'MILL INTERFERE WITH THE INSTALLATION F
NEW Er OR NEW ARCHITECTURAL CHAN(XS, SHALL BE REMOVED, RELOCATED, OR RE--ROUTED TO PERMIT COMPLETION OF CP CHROME PLATED 120 ROOF DRAIN DRAWN T� T��-
SUCH T"K. F?N►SHED WALL P- 2 NO SCALE P TE VvN- LO ( RIM
,''tJ COPPER RE ELEVATION
SIJRFAC£ CHECKED:
EM ELECTRIC WATER COOLER SF SQUARE FEET
32 SALVAGED MATERIALS, EQUIPMENT, AND PLUMBING FIXTURES SMALL BE DELIVERED TO THE O',%ER AT HIS PROPERTY AND STORED I t E'rFM ELECTRIC WATER HEATER %4 SHO'AER ,
WTTHIN TTiE BUILD?NG V:HERE OiRECIED. ANY REMOVED MATERIALS OR EQUIPMENT WHICH THE OIANER DOES NOT ',MSH TO KEEP DATE: �11�3f 0
SHALL BE DISPOSED OF BY THE CONTRACTOR, 4MT HOUT ADDITIONAL COST TO THE OW%ER. GA GALVANIZED SINK . ;�
- 33. ALL PRESENT PIPING .N EXISTING AREAS TO 0E ALTERED, 'AG1iG4 'TALL HAUL NO USE UPON COMPLETION OF THE ALTERAT1r�NS (��1 GALLONS PER MINUTE S`i STAINLESS STEEL,, >,• r( SCA1_E� AS N���fl --�
WALL CLEAN OU � ID INSIDE DIAMETER URN URINAL R
s\ SHALL BE RE!JOVED. PIPING ''MCH iS OR WILL BECOME EXPOSED TO VTE'N, OR 'AALL INTERFERE YAM ME INSTALLATION AND , C� ti PUI ECT NO.: 213,1 I
COMPLETION OF THE 'JAORK REQUIRED, SHALL BE RELOCATED. PiPING SHALL NOT BE RUN EXPOSED THROUGH EXISTING OR NEW ♦ ♦ IE INVERT ELEVATION tfi�C WATER (.l_0. � r � A ' ,-
WI TH ACC*ESS COVER _
FINISHED SPACE UNLESS W"ATITTEN PERMISSION IS GRANTED BY THE O',M1RdER. •��! �
' 1 NOTE' THESE ARE STANDARD SrABOLS AND ALL MAY NOT AP, -,
S 34. INTERRUPTION OF EXISTING FACULTIES OR SERVICES SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL �__. � NO SCALE PC--WALL6 �k-
MATERIALS AND LABOR REQUIRED VA?ENEVER TEMPORMY CONDITIONS ARE NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. PROTECT DRAWINGS; WHEREVER THE SYMBOL ON ME PRO y�C , t OF , •�,{
NNTERRUPIIGN OF SERVICES, T14E INSTALLATION OF TEMPORARY FAOUTIES, AND TTHE 'MORK OF MAKING FINAL CONNECTIONS TO DRAWING OCCURS, THE ITEM SHALL BE PROVIDED AND I�J`afi,�,a L T •`�� ,�• �
NEW 'NORK SHALL i?E DONE ONLY AT SUCH TIMES AS PERMITTED AND SCHEDULED BY THE O'ANER 'MMOUT ADDITIONAL COST. I�� � W� "x
THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE THE SERVICE INTERRUPTIONS '04TH THE ONINER AND GENERAL j . rOt