Loading...
00-0222-027 LL 0 0 U 30 Z i- 0 , i ii W W Z 1-,, 0 RECIRCULATING PUMP REDUCED PRESSURE ; : �_ 0 0 BACKFLOW PREVENTOR ......... ! N Q ;p e o PERFORATED 0 0 VENT CAP 3/4' HB '' a U 12 CONC. PIPE ' ........................................ E . ; ,1 PIPE ANCHOR 0 Z �• 1 BACKFILL FINISHED ED :, •.................................: .............. SECTION GRADE „•.::::::..:::.... 0 0°0000000 ....... ................................ e l........, .�� .�,... ' r I1 000 01 1 0000000 o°0000 :: t z 0 :! - - - - _ - - r- °0000 V N1 °O°O°O°O �• I I ' LL W 2' PVC PIPE ° ° ° 2._0. FROM A/C UNIT ° ° ° ° 00000000, °°°°°°°° FILLER FABRIC 12'MIN I I/4' GALE VALVE I I/4 — — — U N OR (5 TONS MAX) ....................... ° ° ° OOD00 v0°OOQOpO 0000 i i i ................. ....................... ` i N F t 0 0 0 0:00. 0 ° coo ;E 0 � ... .. ........ I 0 0 ocO°o°o° °o coo _tl._...:....»... °° BALANCING ..�... I :.. UNION .........................................................._. i... ; 0 W tY °°o 0 0 0 0 °°o i SK-2 VALVE ..... ... .. ..... ...... ... ... 0 0 0 ; €i f ....... .... . ...... .... ... ...... .... ....... ...... 0 0 0 ............ ......................... ..................................... !}... ..! ! y :.,.• : z x U 15' 0°°°°°° :..... :.......................: i = �Y „ ' ! N <L O o 0 0 0 0 0 i `• ! ! I i i E '•� i• i .................. .... ......1 ' ..................... MIN ° o °O°°°°°0°000°0°000° 3/4' PEA ROCK I.... ............ !� SLOPE 1/8'/FT. 1 1/4' PIPE ! I: - CONNECT.., i :. .................. } is �._...:• ;TO ;J:-`• ii :......................... .,. SKI 3�Fp Z � ............. ..... :: i A/C UNIT ............ - EXISTING #BLDG;'''•,• ! .................. WA ICE ;_ �. .. € 2' _ �Q 3 I y 1 I TER SE ; { _ �-3/4 ( I N SK-2 I j i ! :' •.,! i - ...................._ • ..................... ; i DR)"WELL DETAIL 3 . `.. :'° jI 3'FD OO�i 0 ....._........................., ._......__....._.........., ....., E i'•• :+ ii ( ! ...i:.::..! ......................................... ... .................... ....................................................................................... i N.TS. i ............... - ! ..... ! i ( i ! .................. . W ........................... 2 VtR i; _ E .................................... MOTOR SK 2 ....._.:::::: _.._ _........._...... I ! CO..:::................................::: i€ _ ..................... .. 3 CO .......................................... 3. E� i ii i i :: i UNION TYPE CONNECTION CONDEN5,4TE TRAP DETAIL ! ''. 4 - - - - - - - - - - I I l,.. I i; € i i.......1 ; N T . ...................... : ......................... CAN REMOVED .S. I z SO BE ! h i s i PUMP . . . FOR SERVICE 3 ;` ' I ATE VALVE r... ;i .................................... i :........................:... RECIRCULATINGPUMP HOT WATER RETURN ........................................................: ? I _ 0! ............... ............................................. i ....... — ,/ E........................................................... i...............................................................�.................................................................... ..................., ; s N COLD WATER SUPPLY ........................................................ :....................................., ; ; I : : z i ... .. ...... ...... .... Ir I I.... ...... ...... ...... ...... ...... ...... .....: I SK._2...... SK-2.... SK-2.... SK-.Z..... i 2 SHUT-OFF- VALVE I ! ,............................ :...................... ............................ , i a ... .. (TYPICAL). r , I's......., is ......... .......... .......................................... 3'FD Q� ii 1 2'VTR ............... i W �- NIPPLE 6'ABOVE WATER HEATER / .. ... ..... ..... ' � VACUUM RELIEF VALVE U U CHECK VALVE PIPE FROM HOT WATER i PIPE TO SYSTEM RETURN SYSTEM SEE 'WATTS' OR EQUAL / is SEE PLANS FOR INLINE E E `SHOT WATER SUPPLY '� I p Z m CONTINUATION CIRCULATING PLANS FOR CONTINUATION — STRAINER ASME TEMP. t PRESS. PUMP RELIEF VALVE. 3/4'RELIEF VALVE II'�. THERMAL EXPANSION TANK U Q�C .................................................................................................... :: I Z OUTLET I ` ` — :: WH IN-LINE C I pGU ,�T INC->: PUMP WATER HEATER AS :; ` , o Q }= U QC I` L SPECIFIED DIELECTRIC UNION (TYPE I 1 U Q N.T.S. :' I I ! U_ HEAT TRAP (TYP.) i 1 Ii I' N TE EXTEND I' PRESSURE AND TEMPERATURE i U Q Q Q RELIEF PIPING TO BUILDING EXTERIOR ! ( °"°' ''• _'°""'•°"' • AND TERMINATE 6 ABOVE FINISH GRADE !` I ••°'... " .. ..... .. .. ® WITH 9O ELBOW DOWN J cYl 2 's ' - - O O . .............................................................. I I ! ~ a WATER HEATER DETAIL ..................................................................................... 1 ; • N T.S. €I 4 :.............1 i Q I 0 t I-- 2 FLAN VIEW 0 1 i=LU�'iBINC GENERAL NOTES L� 2 __.i I —, - - — — - - R I ......_.._ ......................._............_....._..._........................ - - - - - - - ........ - - - - - - J 3 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH SOUTH FLORIDA °"" . _.... _ _.........................................................._............, ......_...................._.... ...f ........_...._...._......_..._._... ...._........._............_....................................f..{-. ...._._......._.._...._......._........._. 1 I ►- 3 4 .. .............. COUNTY EDITION. _ ..._._.. = ....................................V...0 ............. ................................................................................. ..V...U.. z BUILDING CODE, DADE COUN ED ! — — — — — — — — — 3'Fp 0 :. : U 2. WASTE PIPING SYSTEM SHALL BE SLOPPED AT I/8 PER FOOT MINIMUM E `: FALL. ANY DEVIATION SHALL BE APPROVED BY ARCHITECT/ENGINEER L. DRAWN BY 2 I a. 4' 6 3. MATERIALS SHALL BE NEW,FREE OF DEFECTS AND OF AMERICAN LUC WG r•::...... Z A.K. g MANUFACTURE, AS FOLLOWS: •... i A. WASTE AND VENT PIPING SHALL BE (DWV) PVC WITH _ ? REVISIONS PVC FITTINGS AND/OR VERIFY EXISTING PIPING COMPATIBILITY AND/OR COPPER PIPE WITH COPPER ................................... ...................... .....s ® FITTINGS. NO PVC PIPING WILL BE PERMITTED THRU i .......................................: € z A/C PLENUM. ` B. WATER PIPING: COPPER TYPE 'L' SATM D-88 LEAD FREE �` 0 ELEVATION VIEW SOLDER � 4. � C. WALL CLEANOUTS: J05AM SERIES 58'150 WITH ACCESS z a° COVER OR EQUAL. Z 0 5 FINISHED GRADE D. VALVES: 125 PSI N15CO SCOTT, STOCKHAM OR EQUAL. a Q WATTS SERIES 909 REDUCED PRESSURE Q BACKFLOW PREVENTION. 0 OATS 6 12' MIN ABOVE FLOOD LEVEL 1 4. CONTRACTOR SHALL PAY FOR ALL PERMITS, TAXES, AND INSPECTION ! ..........•..E... 2Q TEST COCK. AND CONG. SLAB. FEES. ? I } / /98 Q 6' CONC. SLAB WITH "4 AT 12' E.U1. Q3 BALL VALVE (TYP.) 5. PLUMBING FIXTURES TO BE WHITE,NUMBERS USED ARE THOSE OF SK-4 :°°°° ® METER VAULT. AMERICAN STANDARD UNLESS OTHERWISE NOTED. FIXTURES BY BRIGG i ._ 0 4 UNION. ` 1 z O OR ELJER ARE ACCEPT ABLE. CONTRACTOR MUSt PROVIDE SUBMITTALS NOTES: FOR APPROVAL PRIOR TO MAKING SUBSTITUTIONS. 2 •�� I H ASSEMBLY SHALL BE INSTALLED WITH MINIMUM HORIZONTAL .................................... i if 1 ,...i..«...............................................• ,...............................................v. .. ! •. 0 THE ;..........:i ...................................:;.............;;........................ ..,;:.. _ .•F CLEARANCES OF 30 INCHES FREE FROM OBSTRUCTIONS IN SERVICE A WATER CLOSET: AMERICAN STANDARD 021'14.139 ELONGATED CADET ..........................................° .............................. 1✓� CLOSED COUPLED TANK, VITREOUS CHINA, 095 OLSONITE OPEN FRONT i REQUIRED DIRECTIONS. J SEAT LESS COVER 1/2' CHROME PLATED SUPPLY AND STOP. PROVIDE [ 'i ; ? I _ �1 m !r 2. GUARD POSTS SHALL BE INSTALLED IF THE ASSEMBLY 15 EXPOSED TO BOLT GAPS. 4. :...t "' POSSIBLE DAMAGE FROM VEHICULAR TRAFFIC, AS DETERMINED BY • `•• I I :•,.%' �..,.::::: ! B LAVATORY: AMERICAN STANDARD 486'1024 'LUCERN' WALL MOUNTED AUTHORITY HAVING JURISDICTION. VITREOUS CHINA, 02238582 HERITAGE FAUCET WITH LEVER HANDLES ii • 0. I i I i V AND POP-UP DRAIN, I-1/4' 'P TRAP AND I/2 CHROME PLATED SUPPLIES i ......_..__................................................................. ............._..s ii »......................._......_.................._...._............................... .............................. DRAWING NOTES/ AND STOPS. _................._................................._.... ..........._: :: ;.;.............._.;.... ......._,............... __. N W E H A5 INDICATED ON GENERAL DRA o f IN SHALL D ED 3 G L BE 1_...............__.................................__.. ..........., € _.................................__.... .........__..............._ _.............._.................__...............__................. ................. .... .... PLUMBING SPECIFICATIONS. _.__........_.......__._.......................__..._........................... ...... ............................... ...... .. 6. ELECTRICAL WATER HEATER: EWH SHALL BE 80 GALLON, 6KW, 2 ELEMENT UNIT i I 4. ALL EXPOSED METALLIC THREADS SHALL BE PAINTED WITH 51TUMASTIG ELEMENTS SHALL BE WIRED FOR 240v/le/60Hz TANK SHALL BE GLASS LINED. 3/411 HB !•. i FGO !• ? !. PAINT. UNIT SHALL BE UL LISTED AND LABELED AND GUARANTEED FOR FIVE YEARS. .i ; o Z Z' 1 (2 WAY)i i FURNISH AND INSTALL RELIEF VALVE AS SHOWN PtT RELIEF VALVE SHALL I EXISTING , ; 1 ; 0 5. THE AUTHORITY HAVING JURISDICTION SHALL HAVE UNRESTRICTED BE ASME AND AGA RATED. WATER METER I AND CONTINUOUS ACCESS TO THE BACKFLOW PREVENTION UNIT SHALL BE AS PER LOCHINVAR OET5082PP. ! _ i ! i... ....... ...... ...... ....... ...... ....... ....... ..., 0 ... ....... ...... ....... ....... ..... ....... ....... ...: .... ....... ...... ....... ...... ....... ....... ...... .... :..... ....... ...... ....... ...._. ...... I. ....... ...... ...... i z ASSEMBLY. CONNECT T L XIS ;WATER 'I. PERFORM THE FOLLOWING TESTS: EXISTING I p t� i n, REDUCED I - ICE e 5 I LSE 5 /l Ci/F I Ot i I A CJ CJ E M t31 Y A. NEW WATER PIPINGS SHALL BE HYDROSTATIC ALLY TESTED AT 100 z l.il\ 1�t-t 1� L W 1.�L PSIG FOR A PERIOD OF NO LESS THAN ONE HOUR 0 O N.T.S. B. WASTE VENT PIPING SHALL BE FILLED WITH WATER t0 A 10 FOOT I O HEAD AND ALLOWED TO STAND UNTIL WATER LEVEL REMAINS ! p CONNECT TO EXISTING 0 GONG. BOX CONSTANT. LATERAL 4' SANITARY LINE. a _ G. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTING. METAL LID `� CLEANOUT D. STERILIZE ALL NEW WATER PIPING WITH A MIXTURE OF TWO (a) �I � � � I ®�� �� �� V FINISH GRADE POUNDS OF CHLORINATED LIME TO EACH 1000 GALLONS OF WATER k� L (50 PPM OF AVAILABLE CHLORINE). RETAIN MIXTURE IN PIPE FOR A C /� — _ — — PERIOD OF 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE 5 G A L E • 1/4 " - 1 1 - 011 -III=III=) i=� I=III=III=III- WATER BEFORE PLACING SYSTEM IN SERVICE. 8. CONTRACTOR SHALL BECOME FAMILIAR WITH ALL EXISTING CONDITIONS = i AND NOTIFY ARCHITECT/ENGINEER OF ANY DEVIATION DUE TO FIELD U EXTENSION SAME CONDITIONS BEFORE PERFORMING WORK. SIZE AS SEWER 2-WAY CLEANOUT ' 9. PLUMBING CONTRACTOR SHALL FURNISH WRITTEN GUARANTEE THAT ALL d 4 s PLUMBING WORK SHALL BE FREE OF DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM FINAL ACCEPTANCE. 10. FIELD VERIFY LOCATION OF EXISTING POINTS OF CONNECTIONS BEFORE SHEET No SUBMITTING BID AND OBTAIN CLARIFICATION BEFORE COMMENCING I WORK 0 0 NOTE PIPE AND FITTING SHALL BE OF THE SAME Puga and Associates, Inc. z OF MATERIAL AS SEWER IT SERVES. Engineers/Consultants ' 2 EXTERIOR 2 -1.U,41' CLE�4NOUT (EGO) # EB 0005813 W 4970 S.W. 72 Avenue, #107 W N.T.S. Miami, Florida 33155 COMM NO (305) 661-7700 80 411 7 '