Loading...
00-1457-021 r . , , : , r t e . w r r ME RANI AL SPECIFICATIONS ak CG,INV6TANT FIRE, PROTECTION X�itica too. , 3521 me Clark,suits 300 A. THIS CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL FOR A A. ALL PIPING AND HEADS SHALL BE INSTALLED PER LATEST EDITION OF _ _ AIR HANDLING UNIT SCHEDULE T I�sor�.u�al�tzu�sk-�I . - MECHANICAL SYMBOLS LEGEND .COMPLETE HEATING, VENTILATING AND AIR CONDITIONING SYSTEM AS NFPA 13. HEAD SPACING SHALL BE BASED UPON T1IE ORDINARY HAZARD - - - Canada 14 ; -- INDICATED E THE DRAWING AND BID. CATiONS. VERIFY ALL CONDITIONS SCHEDULE. ALL SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK IRON. INDOOR OUTSIDE EXT. ELEC. HTG ELEC T THERMOSTAT T 514.$T'T.tz( t[ AT THE SITE BEFORE SUBMITTING A BID. SCHEDULE 10 PIPING iS PERMISSIBLE IF ACCEPTABLE TO 114E LANDLORD. MARK MANUFACTURER MODEL NO. CFM CFM SP. AW HP V / P}1 REMARKS _ F S1f.8i;.7616 6. HVAC WORK SHALL COMPLY W1rH THE LATEST EDITION OF THE BUILDING CONTRACTOR SHALL HYDRAULICALLY CALCULATE SYSTEM AND SUBMIT AHU-1 TRANE BCHBO36 _ 1400_ 270 __ __._ - - -AM- - FLEXIBLE DUCT ____ E N a I }� � � -; _ _ _ 1.5 460/3 1 R . I N 0 COPIES OF ME CALCULATIONS TO TILE AUTHORITY HAVING JURISDICTION - -' _ _ _ CODES AS WELL AS GOVERNING STATE AND LOCAL CODES. ALL WORK AND TPE LANDLORD. 1. EXISTING CHILLED WATER AIR HANOUNG UNIT. REBALANCE CHILLED WATER FLOW TO D _ i VOLUME DAMPER 5HALL BE INSTALLED IN STRICT ACCORDANCE WITH THE LANDLORD'S EUVER 10 GPM, THROUGH _ EXISTING 1" CWS PIPE. CHECK UNIT FOR PROPER OPERATION. REPLACE EXISTING AIR ALTER AND WORN BELiS. AND 'EdificaCase TENANT CRITERIA AND THE TENANT'S LEASE AGREEMENT. CONTRACTORS B. CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR SUBMITTAL TO THE LUBRICATE BEARINGS. PERFORM OTHER WORKS, AS NECESSARY, TO BRING UNIT TO FULL OPERATING N FDA--! FIRE DAMPER _ 1715 Larkin Wiltiar rs J __ _ _ CO DI T10N. 2 SHALL DOCUMENTS.A COPY AND COMPLETELY FAMILIARIZE THEMSELVES WITH AUTHORITY HAVING JURISDICTION AND THE LANDLORD BEFORE FABRICATION. SG Louis,J1063026 p THESE DOCUMENTS. -_- f - CEILING SUPPLY AIR DIFFUSER t 1i36.349.1G00 C. TWO COPIES OF iIIE APPROVED SHOP DRAWINGS SHALL BE SUBMITTED To —__ AIR DEVICE SCHEDULE -_ _-_ a+ 636. 319.1730 �? CONTRACTOR SHALL PAY FOR ALL REQUIRED PERMITS AND INSPECTIONS THE ARCHITECT AND THE LANDLORD PRIOR TO ISSUANCE OF A `-" AND PROVIDE A CERTIFICATE OF INSPECTION UPON COMPLETION. PLAN — - - - NECK FRAME PANEL -�l+A- CEILING RETURN AIR GRILLE _ — ri CERTIFICATE OF OCCUPANCY. MARK MANUFACTURER MODEL MATL, SIZE TYPE SIZE REMARKS D. FIVE COPIES OF ALL SHOP DRAWINGS SHALL EA SUBMITTED IN THiS D. PROVIDE FOR INSPECTION TESTING AND APPROVAL BY THE AUTHORITY 51 i1 TUS PAS - ST g"� LAY-IN CONTRACTOR. THESE DRAWINGS SHALL BE CLEARLY MARKED INDICATING HAVING JURISDICTION AND THE STATE INSPECTION BUREAU A5 REQUIRED. 52 TI TUS -PAS -S T -~-- - _ __ - v SIDEWALL AIR DIFFUSER OR GRILLE WHICH ITEMS ARE TO BE SUPPUED AND SHALL STATE CAPACITIES, SIZES, _ _ _ 12"0 LAY--IN 24"x_24" __ 1 �- _ - NEW DUCTWORK- -�- - REQUIRED INSPEC11ON LABELS AND GENERAL DESCRIPTION OF ALL E. PROVIDE SIGNED CERTIFICATE OF COMPLETION COPIES TO BE GIVEN TO R1 11 TUS ~PAR ST 12 x12 LAY-!N 24"x24" _ _ v - EQUIPMENT AND FIXTURES. -- _..- _ _ .__. EXISTING DUCTWORK -____ -._--.---__ -• 3 OWNER'S REPRESENTATIVE, INSURANCE REPRESENTATIVE, AND PROJECT R2 11TUS PAR ST 1$"xt$" LAY-IN ?_4"x24_" OFFICE. , a _----_`--- --- --- -- D-- CONDENSATE GRAIN E. THIS CONTRACTOR SHALL GUARANTEE All EQUIPMENT AND MATERIAL 1 AIR DEVICE RUN-OUT SHALL BE SAME SIZE AS DIFFIJSEr2 NECK. `-- -- G --- GAS PIPING '3 � �1 i° - INSTALLED UNDER MIS CONTRACT TO BE FREE FROM DEFECTS FOR A F. ALL WORK SHALL BE COMPLETED IN ACCORDANCE W]TH LOCAL AND STATE -- ^- - 1 PERIOD OF ONE YEAR FROM THE DATE OF OPENING OF THE STORE. CODES WHERE APPLICABLE. ___-� ------- ---- -- - - --------- __ - - PIPE TURNING DOWN CONTRACTOR SHALL REPAIR OR REPLACE WITHOUT COST TO THE OWNER -�_ _ _ _ ` 1 ANY EQUIPMENT WHICH IS DEFECTIVE, OR IMPROPERLY INSTALLED. IN G. SPRINKLER LINES SHALL BE INSTALLED AS HIGH AS POSSIBLE. --~--_--,0 PIPE TURNING UP ADDITION THIS THIS CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR - ----------'-'--- BALL VALVE , ANY DAMAGE TO THE BUILDING AND ITS CONTENTS OR OTHER EQUIPMENT }i• SPRINKLER HEADS IN AREAS WI TN CEILING 5HALL BE CONCEALED TYPE WITH WHITE COVER PLATE. UPRIGHT' PENDANT HEADS SHALL BE USED IN >_¢-- GATE VALVE CAUSED BY DEFECTS OR IMPROPER INSTALLATION OF EQUIPMENT OR _ MATERIALS INSTALLED UNDER THIS SECTION OF THE SPECIFICATIONS. ALL AREAS WI T}IOU T A CEILING. SPRINKLER HEAD TEMPERA iIJRE RATINGS t� CONNECTION OF NEW TO EXISTING SHALL BE 165E IN SALES AND STOCK AREAS AND 212E IN DiSPLAY ;',`�,Y; •. # ' WINDOWS AND LIGHTING FIXTURE CANOPIES OR AS REQUIRED BY --�}----- CHECK—VALVE .,�� F. FABRICATE AND INSTALL GALVANIZED SHEET METAL DUCTWORK FOR - ' ,' , •� LANDLORD'S INSURANCE AGENCY AND LOCAL AUTHORITIES. FLOOR LINE VELOCITIES LESS TITAN 2000 FEET PER MINUTE AND STATIC PRESSURES -ts— GAS COCK F " FLOOR LINE .�.,. , • t *,o.,y,, ; 0 T} LESS TAN W 2 WATER GAUGE IN ACCORDANCE W1 TN TTIE LATEST -- ----------- - ---+�+----- UNION . SPRINKLER CONTRACTOR SHALL VLSIT THE SITE AND VERIFY ALL EXISTING - -- ---- ---_---------------_______ -________.____ 4 MAGNA S LOW VELOCITY DUCT CONSTRUCTION MANUAL. ALL � � �• �'� + CON01(IONS MICH WILL AFFECT THEIR WORK. PROVIDE ALL REQUIRED Sj AIR DEVICE �/ —�- _-� S - SUPPLY ELBOWS AND BRANCHES FROM 114E MAIN IN ALL SUPPLY AND RETURN 3/4" __3/4" 1/2" PiPING AND OR REVISIONS TO PIPING AS NEEDED FOR A COMPLETE _ DUCTS SHALL BE PROVIDED WITH TURNING VANES. DUCTWORK SHALL BE _2» _2„ R - RETURN =ti;•,,.� CONSTRUCTED, INSTALLED, SEALED AND INSULATED IN ACCORDANCE SPRINKLER SYSTEM. 's1�}i1CH iS APPROVED AND ACCEPTED BY LOCAL �- — - - —_W - ---- _-►- `" - 11)0 CFM --- _ E - EX}TAUS t WItF1 THE LATEST EDITION OF THE MECHANICAL CODE. FIBERGLASS AUTHORITIES. DUCT BOARD IS NOT ACCEPTABLE, f� I ( �- B CONTRACTOR'S GENERA!. N4YE3 —�/2" C G. TEST AND ADJUST ALL AIR IIANOUNG EQUIPMENT TO PROVIDE THE I EIRE PROTECTION S_Y�_ REQUIRED AiR VOLUME WITHIN 109 OF DESIGN CONDITIONS. TEST AND 1• ALL OF THE MECHANICAL WORK IS NOT NECESSARILY SHOWN - MBOL$ LEGEND _ (1-1/2» ADJUST ALL AIR DEVICES TO 114E CFM SHOWN ON THE DRAWINGS. OR NOTED ON THESE DRAWINGS. THE CONTRACTORS SHALL VISIT THE JOB I I ( CONNECTION y' --~^ WC-1 LAV-1 I _ OF NEW TO EXISTING PROVIDE ALL CHANGES REQUIRED TO OBTAIN CFM QUANTITIES SHOWN ON SITE AND VERIFY ALL EXISTING CONDITIONS RELATED TO THEIR WORK i _ f THE DRAWINGS. TESTING AND BALANCING SHALL BE BY AN INDEPENDEN T BEFORE BIDDING. THOSE ITEMS NOT SHOWN OR NOTED BUT WHICH ARE - - F -- FIRE PROTECTION PIPING _ — TEST AND BALANCING AGENCY IN ACCORDANCE WITIi THE PROCEDURES DEEMED NECESSARY FOR REMOVAL OR RELOCATION 8Y OWNER'S I I � co --5PR--- SPRINKLER PIPING i °i 3 U � ;3 k OUTLINED IN THE TESTING AND BALANCING MANUAL AS PUBLISHED BY REPRE5ENTATiVE SHALL BE PART OF TH15 CONTRACT. 1- J LAV-1 SMACNA. THE ARCHITECT SHALL BE PROVIDED WITH T}TREE CERTIFIED ---- - ---- - f TS ,y. U VALVE WITH SUPERVISORY (TAMPER) ................,..........................°.....-........,.-...-_...._ ..........-......., 2 THE SUBMISSION OF PROPOSALS SHALL BE CONSIDERED EVIDENCE iNA r H a o e s c w r T i o n van. ; o r e ' COPIES OF THE AIR BALANCE REPORT BEFORE FINAL PAYMENT WILL BE S�N1tGH • THE CONTRACTORS HAVE VISITED TILE SITE. NO EXTRA PAYMENTS WILL vI . MADE. PROVIDE THE LANDLORD WITH TWO CERTIFIED COPIES OF THE AIR } ......... , BE ALLOWED THESE CONTRACTORS CLAIMS FOR EXTRA WORK MADE FLOOR LINE FLOOR LINE WC-1 C FS _-� FORINTERIORFERMt r LANCE REPORT. 9� VANE TYPE WATER FLOW INDICATOR 00 ;. NECESSARY BY THEIR FAILURE TO V151T THE SITE. -- - -- --- - - - - - - ---- -- - ---- - ;4 ---- ----- - swtTCH ....................... .............................. . _..........-... ............,.r.... _...... .....:.:. H. FURNISH AND INSTALL ALL MECHANICAL EQUIPMENT AND OR AIR DEVICES FOR FENtiur��ESUar,�nrA>, sa ]1Gt31�1 •• .'r AS SCHEDULED ON 114E DRAWINGS. BIDS SHALL BE BASED ON THE 3. EACH CONTRACTOR SHALL WARRANTY THEIR WORK FOR 1 YEAR FROM 2" �E EXISTING SPRINKLER HEAD — -` �I THE OPENING DATE OF THE STORE. __ .� _ ............................ .......... EQUIPMENT SPECIFIED AND NO SUBST117)110NS WILL BE ACCEPTED. PENDANT SPRINKLER HEAD 1. FURNISH AND INSTALL ALL SYSTEMS OF HVAC CONTROL (TO INCLUDE --------- --- 0'2 ; 4. ALL CONTRACTORS(ORS 5}TALL COMPLETE THEIR WORK ACCORDING TO STATE 4" 4" _ UPRIGH t SPRINKLER HEAD ...... ......... ............. ..... .... .. s CONTROL WIRING) TO PROVIDE A COMPLETE SYSTEM. ALL SYSTEMS SHALL AND OR LOCAL CODES. � CONCEALED SPRINKLER HEAD- ra3 __. BE COMPLETE AND INSTALLED BY TI415 CONTRACTOR. } ________ _ _ _ ............................................. ......................... .... ............. ....... ......... .: 5. CONTRACTOR SHALL REVIEW ALL LANDLORD REQUIREMENTS AND INSTALL WAT�R_-�iIS�R DIAGRAM WAS1'�RISEH_DIAGRAM _ -� SIDEWALL SPRINKLER HEAD - - ca J. PAY FOR ALL PERMITS AND INSPECTIONS AND PROVIDE CERriFICA1ES ALL MATERIALS AND EQUIPMENT AS DIRECTED BY TTIE LANDLORD'S SC.,ALE: NONE SCALE: NONE 1. -- --- _ .............:........................................ ............... ... ...:........: ,...._..-... ._..... . .......: OF INSPECTION. REPRESENTATIVE AND AS REQUIRED BY THE LEASE DOCUMENTS. CONTRACTORS SHALL VERIFY THE REQUIREMENTS BEFORE SUBMITTING oS K. ALL PENETRATIONS OF FLOOR SLAB SHALL BE SAW Cur, GROUTED, AND THEIR BID. ............... ............................. ............ ................... , SEALED WATER PROOF, ..._ ..... ;_.................. ,. MECHANICAL-_KEYED, NOTES ..................... ..... ... ..... ... ......... ............, THIS CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL FORA COMPLETE PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS AND PECIFiED HEKEIN, FIELD VERIFY EXISTING CONDI11ON5 PRIOR TO PROVIDE 7-DAY PROGRAMMABLE THERMOSTAT AND RELATED WIRING T0 ................I.............,,.. . ...... ......... ..............................: :.... ' SUBMITTING Ip, CONTROL HEAT PUMP. PROVIDE LOCKABLE COVER. M. PLUMBING WORK SHALL COMPLY 1NITH LOCAL AND STATE CODES AND 2 AIR HANDLING UNIT ABOVE CEILING. VERIFY LOCATION IN FIELD VYIT}I THE LEASE AGREEMENT. LANDLORD. $� N. FURNIS}i ,AND +NStALL STANDARD WEIGHT CASs IRON SOIL PIPE WITH 3 DUCTWORK SIZES ARE SHEET !METAL SIZES. ALL DUCrwORK SHALL I1AV'E NO-HUB FITTINGS FOR ALL WASTE AND VENT PIPING ABOVE GRADE 1/2" INTERNAL LINER. AND SERVICE WEIGHT CAST IRON PIPING '.MTIi APPROVED COMPRESSION - EXIST. G1I WATER JOINTS UNDER FLOOR. EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED AS REQUIRED TO SERVE THE NEW LAYOUT SHOWN ON DIE DRAWING, SPRINKLER CONTRACTOR �`J} A}� 0. INTERIOR WATER PIPING ABOVE THE FLOOR SHALL BE TYPE L WI TIT 95-5 SHALL NOTIFY THE MALL MANAGER 72 HOURS BEFORE SPRINKLER -�- SOLDERED JOINTS. VALVES SHALL BE NIBCO S-590 BALL VALVES OR SHUTDOWN IS REQUIRED AND SHALL PAY ALL MALL CHARGES EXIST', CH WATER EQUIVALENT. TEST WATER PIPING TO 125 LBS. FOR AT LEAST TWO HOURS ES ER FOR SPRINKLER SHUTDOWN. EXIST. 12x10 LL EXH DUCE MITT NO LEAKS BEFORE COVERING. INSULATE HOT AND COLD PIPING ABOVE THE FLOOR W11N 1"TTiICK FIBERGLASS INSULATION WITH ALL SERVICE JACKET. C SPRINKLER CONTRACTOR SHALL CONNECT TO ]TIE LANDLORD'S EXISTING SPRINKLER LINE AND TO CONNECTIONS THAT EXIST IN THE SPACE TO / �- EXIST. 10x10 LL U/A DUCT P. MIS CONTRACTOR SHALL CAP ALL UNUSED PLUMBING ONES ASSOCIATED ACCOMMODATE THE NEW SPRINKLER LOCATIONS. r - ��; - WI i1i THE LEASED SPACE AS REQUIRED BY 111E LANDLORD AND LOCAL R1 f( INSPECTION AUTHORITIES. C� PROVIDE HANDICAPPED WA-TER CLOSET, (WC-1), AMERICAN STANDARD t'LO __ » MODEL 216$.100, OPEN FRONT' SEAT LESS COVER. LOCATE WATER S1 .� $„0 � � 12 0 CLOSET CENTERLINE 1$” FROM WALL. Fp. r ---- 1 12 0 PROVIDE HANDICAPPED LAVATORY, (LAY-1), AMERICAN STANDARD MODEL 0356.421, WITH WALL BRACKET, GRID STRAINER, OFFSET P- TRAP. , FAUCET PROVIDED WI1-}i WATER HEATER. _ � TRANS111ON - ------ -k v 1 TO BRANCH �� �V _. O FURNISH AND INSTALL 0.5 GPM, INSTANTANEOUS, 750 `�i, 120V ELECTRIC (� -0 � \ S2 SIZE e -- WATER HEATER, (EM-11), BELOW LAV. WATER HEATER SHALL BE ---_-� ! AHU-1 E�� �� INSINKERATOR MODEL UWL WITH ADA COMPLIANT" FAUCET. � s }. T 5> TYPICAL _ �°l ;.w_.. ADIOS EEQOW T OFURNISH AND INSTALL NEW CEILING MOUNTED EXHAUST FAN, (EF--1), r �<S� COOK MODEL LITTLE GEM II, 80 CFM, 120V. 6"0 DUCi TO TIE INTO r R� j ,y EXISTING LANDLORD'S EXHAUST DUCT. a g D FULL DEPTH OF 15 DEG - MAIN DUCT �l BRANCH a- DUCT TRANSITION- TO j s r� r ,i rs A r i o ;i A ,- BRANCH ALL SPRINKLER HEADS LOCATED WITHIN THE GYPSUM SOFFIT _ ;• � � ,y _:9_ Vol � o DARE VANED MUST BE CONCEALED TYPE HEADS WITH COVER PLATES TO SIZE .LBQW MATCH THE CEILING FINISH. G JD P V. S RINKLER SHOP DRAWINGS UNDER SEPARATE COVER. �� �E� �1 I.-rN r E R :4 A r 1 13,14 A L J NJ TURNING VANES � a' - I G.C. TO BE RESPONSIBLE TO SUPPLY SPRINKLER SHOP �� _ _ �' t{ 0 J �; 1 DRAWINGS AND TO APPLY TO BUILDING DEPT. (IF REQUIRED). 3o D£c -' THE SHOPS AT SUNSET PLACE ALL FiRE PRO fECTION WORK SHALL BE DONE BY MALL'S ORANGE DESIGNATED FIRE PROTECTION CONTRACTOR.TOR. VERIFY Wl f}i MALL i r DUCT FULL DEPTH OF •5101 SUs JSEf GR!JE MAIN DUCT MANAGEMENT FOR THE NAME OF CONTRACTOR, S2 SOUTH NSEf , FL(ER'OA SPACE: 4E v-— -�r- _— ____--__------------- _ IRAN Tit N ------- ---_- ------_� `---__---- � °' , HVAC DESIGN REQUIRES: YES NO NOTES:-- - DUCT SMOKE DETECTOR X _� - �.-_-�- v 1. DETAIL IS APPLICABLE TO SUPPLY - ---------.-------.--------_- _-____------ .. r, __ ,..._ _�-�--_-____-- � AIR BRANCH DUCT TAKE-OFFS. FIRE DA,idPEr2(S) X ___________ _ __� MECHANICAL PLAN `'-- S_MCKE_OAMPER S - ---__ X__ __ v BRANCH DUCT - �-� `--_-- __--_ ' FIRE RATED-_ENCLOSURE ------- —X ----"-_ v, I TAP FiRE RATED ROOF/FLOOR ----- -i X CEILING ASSEMBLY _ s �, 0 R A .V;i 1-r FIRE STOPPING ` ---" X---__ __�__.�- / `$ BRANCH DUCT TAKEOFFS AND TRANSIT ION $ SMOKE CONTROL -� _ _-- - x ---- I �I`�AN I Cif PLAN , NO SCALE __-_-- _____ --___.___--__ -_- .._____._--,� .• _...-1111.-1111..... .. ... ...... ... .....-.. - AS SI401At4 T sate c.�sr too+al��p� - c 3 .. �_.-�.__.�._._.._.__._._-__...,_.._.. ._._._..__.__..._......._....._..._.__.._11_11. ._._._ ,. 11_11_ __•_-•_ ,,.,__ ._ 4_ . . ,. � -11,11-_1111._.--__•__-_..,. - ,---..-_.__-_ - - _