MECHANICAL SPECIFICATIONS FIRE PROTECTION SPECIFICATIONS *
'y
A. THIS CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL FORA r '
VENTILATING AND AIR CONDITIONING SYSTEM AS A. ALL PIPING AND HEADS SHALL BE INSTALLED PER LATEST EDITION OF NFPA 13.
COMPLETE HEATING, HEAD SPACING SHALL BE BASED UPON THE ORDINARY HAZARD SCHEDULE. ALL
INDICATED ON THE DRAWING AND SPECIFICATIONS. VERIFY ALL CONDITIONS AT
THE SITE BEFORE SUBMITTING A BID. SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK IRON. SCHEDULE 10 PIPING
a
IS PERMISSIBLE IF ACCEPTABLE TO THE LANDLORD. CONTRACTOR SHALL �DATE NIS ISSUED
HYDRAULICALLY CALCULATE SYSTEM AND SUBMIT COPIES OF THE CALCULATIONS
B. HVAC WORK SHALL COMPLY WITH THE LATEST EDITION OF THE BUILDING TO THE AUTHORITY HAVING JURISDICTION AND THE LANDLORD. NOV. 00,2000 FOR BIDS,LAJ4X0P0 AND ALW(6f) °
CODES AS WELL AS GOVERNING STATE AND LOCAL CODES. ALL WORK SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE LANDLORD'S TENANT CRITERIA B. CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR SUBMITTAL TO TI•AE LOCAL FM
AND THE TENANT'S LEASE AGREEMENT. CONTRACTORS SHALL OBTAIN A COPY OFFICE AND THE LANDLORD BEFORE FABRICATION. THE CONTRACTOR SHALL RECEIVE
AND COMPLETELY FAMILIARIZE THEMSELVES WITH THESE DOCUMENTS, T14EIR APPROVAL BEFORE ANY INSTALLATION CAN BEGIN. -- —
TRANSITION
C. CONTRACTOR SHALL PAY FOR ALL REQUIRED PERMITS AND INSPECTIONS AND C. TWO COPIES OF THE APPROVED SHOP DRAWINGS SHALL BE SUBMITTED TO THE TOIZBERANCH FLOW r.
PROVIDE A CERTIFICATE OF INSPECTION UPON COMPLETION. ARCHITECT AND THE LANDLORD PRIOR TO ISSUANCE OF A CERTIFICATE OF
OCCUPANCY.
D, FIVE COPIES OF ALL SHOP DRAWINGS SHALL BE SUBMITTED BY THIS RADIUS ELBOW i
CONTRACTOR. THESE DRAWINGS SHALL BE CLEARLY MARKED INDICATING D. PROVIDE FOR INSPECTION TESTING AND APPROVAL BY THE AUTHORITY HAVING, j FLOW
WHICH ITEMS ARE TO BE SUPPLIED AND SHALL STATE CAPACITIES, SIZES,
JURISDICTION AND THE STATE INSPECTION BUREAU AS REQUIRED. '
REQUIRED INSPECTION LABELS AND GENERAL DESCRIPTION OF ALL EQUIPMENT -
AND FIXTURES. E. PROVIDE SIGNED CERTIFICATE OF COMPLETION COPIES TO BE GIVEN TO OWNER'S 1 .50
REPRESENTATIVE, INSURANCE REPRESENTATIVE, AND PROJECT OFFICE. D FULL DEPTH OF
E. THIS CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT AND MATERIAL MAIN DUCT
INSTALLED UNDER THIS CONTRACT TO BE FREE FROM DEFECTS FOR A PERIOD F ALL WORK SHALL LI COMPLETED IN ACCORDANCE WITH LOCAL AND STATE DUUCT 15 DEG
OF ONE YEAR FROM THE DATE OF OPENING OF THE STORE. CONTRACTOR SHALL CODES WHERE APPLICABLE.
REPAIR OR REPLACE WITHOUT COST TO THE OWNER ANY EQUIPMENT WHICH IS G. SPRINKLER LINES SHALL BE INSTALLED AS HIGH AS POSSIBLE. NO ALARMS OR a-- �r-
DEFECTIVE, OR IMPROPERLY INSTALLED. IN ADDITION TITS CONTRACTOR VALUES ALLOWED IN SPRINKLER SYSTEM.
SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO TIE BUILDING AND TRANSITION- FLOW
ITS CONTENTS OR OTHER EQUIPMENT CAUSED BY DEFECTS OR IMPROPER Ti• SPRINKLER HEADS IN AREAS W11}I CEILING SHALL BE CONCEALED TYPE TO BRANCH SQUARE VANED
SIZE
INSTALLATION OF EQUIPMENT OR MATERIALS INSTALLED UNDER THIS SECTION WITH WHITE COVER PLATE. UPRIGHT PENDANT HEADS SHALL BE USED IN ALL ELBA `�-
OF ]TIE SPECIFICATIONS. AREAS WITHOUT A CEILING. SPRINKLER HEAD TEMPERATURE RATINGS SHALL FLOW
BE 165F IN SALES AND STOCK AREAS AND 212F IN DISPLAY WINDOWS AND ,� TURNING VANES '-
F. FABRICATE AND INSTALL GALVANIZED SHEET METAL DUCTWORK FOR LIGHTING FIXTURE CANOPIES OR AS REQUIRED BY LANDLORD'S INSURANCE
J
VELOCITIES LESS THAN 2000 FEET PER MINUTE AND STATIC PRESSURES OF AGENCY AND LOCAL AUTHORITIES. 30 DEG
LESS THAN 2" WATER GAUGE IN ACCORDANCE WATT TIE LATEST EDITION OF E�33
SMACNA'S LOW VELOCITY DUCT CONSTRUCTION MANUAL. ALL ELBOWS AND 1. SPRINKLER CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING DUATCTi FU p PTN OF
BRANCHES FROM THE MAIN IN ALL SUPPLY AND RETURN DUCTS SHALL BE CONDITIONS WHICH WILL AFFECT THEIR WORK. PROVIDE ALL REQUIRED PIPING
MAY, D�CT
PROVIDED WITH TURNING VANES. DUCTWORK SHALL BE CONSTRUCTED, AND OR REVISIONS TO PIPING AS NEEDED FOR A COMPLETE SPRINKLER SYSTEM
INSTALLED, SEALED AND INSULATED IN ACCORDANCE WITH THE LATEST WHICH IS APPROVED AND ACCEPTED BY LOCAL AUTHORITIES,
EDITION OF THE MECHANICAL CODE. FIBERGLASS DUCTBOARD IS NOT --
ACCEPTABLE. J. EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED AS REQUIRED TO SERVE THE TRANSITIONS
THE NEW LAYOUT SHOWN ON TIE DRAWING. SPRINKLER CONTRACTOR SHALL FLOW
G. TEST AND ADJUST ALL AIR HANDLING EQUIPMENT TO PROVIDE THE REQUIRED NOTIFY THE MALL MANAGER 72 HOURS BEFORE SPRINKLER SHUTDOWN IS _
AIR VOLUME WITHIN 1070 OF DESIGN CONDITIONS. TEST AND ADJUST ALL AIR REQUIRED AND SHALL PAY ALL MALL CHARGES FOR SPRINKLER SHUTDOWN. y
DEVICES TO THE CFM SHOWN ON THE DRAWINGS. PROVIDE ALL CHANGES ' }" .
REQUIRED TO OBTAIN CFM QUANTITIES SHOWN ON THE DRAWINGS. TESTING K. SPRINKLER CONTRACTOR SHALL CONNECT TO THE LANDLORD'S EXISTING
AND BALANCING SHALL BE BY AN INDEPENDENT TEST AND BALANCING SPRINKLER LINE AND TO CONNECTIONS TTiAT EXIST IN THE SPACE TO NOTES:
AGENCY IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN THE TESTING ACCOMMODATE THE NEW SPRINKLER LOCATIONS. BRANCH DUCT ,
AND BALANCING MANUAL AS PUBLISHED BY SMACNA. THE ARCHITECT SHALL 1. DETAIL IS APPLICABLE TO SUPPLY
BE PROVIDED WITH THREE CERTIFIED COPIES OF TIE AIR BALANCE REPORT L. ALL FIRE PROTECTION SPRINKLER HEADS IN TENANT SPACE MUST BE QUICK SIDE TAP AIR BRANCH DUCT TAKE-OFFS.
BEFORE FINAL PAYMENT WILL BE MADE. PROVIDE THE LANDLORD WITH TWO RESPONSE (QR) TYPE. _
CERTIFIED COPIES OF THE AIR BALANCE REPORT.
M. SHOP DRAWINGS AND CALCULATIONS SHALL BE SUBMITTED BY THE CONTRACTOR BRANCH DUCT T "TAKEOFFS AND TRANSITIONS _ ► '
H. FURNISH AND INSTALL ALL MECHANICAL EQUIPMENT AND OR AIR DEVICES AS FOR THE APPROVAL BY THE OWNER LANDLORD, LANDLORD'S INSURANCE NO SCALE'""'I` , ;
SCHEDULED ON THE DRAWINGS. BIDS SHALL BE BASED ON THE EQUIPMENT UNDERWRITER AND TTiE FIRE RATING INSPECTION BUREAU. `
SPECIFIED AND NO SUBSTITUTIONS WILL BE ACCEPTED. af'trs
N. TENANTS FIRE PROTECTION CONTRACTOR SHALL DISCONNECT EXISTING SYSTEM th '
FROM MAIN SYSTEM...PERFORM IS WORK, TEST, RECONNECT TO MAIN SYSTEM...ALL _ e
I. FURNISH AND INSTALL ALL SYSTEMS OF HVAC CONTROL (TO INCLUDE CONTROL .•� _ t� i ` +w `
WIRING) TO PROVIDE A COMPLETE SYSTEM. ALL SYSTEMS SHALL BE COMPLETE COST RELATED TO DRAIN DOWN AND FILLS ARE TO BE BORNE BY TENANT'S FIRE ' `A ,� ,
AND INSTALLED BY THIS CONTRACTOR. PROTECTION CONTRACTOR. � �. n; 5 � t
•
J. PAY FOR ALL PERMITS AND INSPECTIONS AND PROVIDE CERTIFICATES CONTRACTOR'S GENERAL NO rES
OF INSPECTION. ' ,.,,IU •, t
K. ALL PENETRATIONS OF FLOOR SLAB SHALL LIE SAW CUT, GROUTED, AND SEALED 1, ALL OF THE MECHANICAL WORK IS NOT NECESSARILY SHOWN
—_ -
WATER PROOF. OR NOTED ON THESE DRAWINGS. THE CONTRACTORS SHALL VISIT THE JOB NO. DATE REVISION
SITE AND VERIFY ALL EXISTING CONDITIONS RELATED TO THEIR WORK BEFORE - ---
BIDDING. THOSE ITEMS NOT SHOWN OR NOTED BUT W41CH ARE DEEMED CONTRACTOR MUST VERIFY ALL
L. TTIIS CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL FOR A COMPLETE NECESSARY FOR REMOVAL OR RELOCATION BY OWNER'S REPRESENTATIVE DETAILS, SPECIFICATIONS AND ;
PLUMBING SYSTEM AS INDICATED ON THE CRAWINGS AND SPECIFIED HEREIN. FIELD
VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING BID. SHALL BE PART OF THIS CONTRACT. DIMENSIONS, AND REPORT ANY {.$
DISCREPANCIES TO OWNER
THE SUBMISSION OF PROPOSALS SHALL BE CONSIDERED EVIDENCE IT1AT THE BEFORE PROCEEDING WITH WORK •
M. PLUMBING WORK SHALL COMPLY WITH LOCAL AND STATE CODES AND 2�
THE LEASE AGREEMENT. CONTRACTORS HAVE VISITED THE SITE. NO EXTRA PAYMENTS WILL BE -- -_—� - -
ALLOWED THESE CONTRACTORS CLAIMS FOR EXTRA WORK MADE NECESSARY fidifica
N. FURNISH AND INSTALL STANDARD WEIGHT CAST IRON SOIL PIPE WITH "NO-NUB" BY THEIR FAILURE TO VISIT THE SITE. St-tNUls �tontrexi
J.
FITTINGS FOR ALL WASTE AND VENT PIPING ABOVE GRADE AND SERVICE Edirxscget.l_c
WEIGHT CAST IRON PIPING WITH APPROVED COMPRESSION JOINTS UNDER FLOOR, 4 EACH CONTTACTOR SHALL WARRANTY TIiEIR WORK FCR 1 YEAR FRCM THE t7251&,kia-will;an /'�
0. INTERIOR WATER PIPING ABOVE THE FLOOR SHALL BE TYPE L WITH 95-5 OPENING GATE OF TIE STORE. s:-t.a;.. >to63o�6 !.i �✓
f 636333-1GUO '
SOLDERED JOINTS. VALVES SHALL BE NIBCO S-590 BALL VALVES OR EQUIVALENT. K 636349-v3o
TEST WATER PIPING TO 1'L5 LOS. FOR AT LEAST TWO HOURS WITH NO LEAKS 5. ALL CONTRACTORS SHALL COMPLETE THEIR WORK ACCORDING TO STATE AND AAw.akdi9(&cvxn E N G 1 N E E R I N G
BEFORE COVERING. INSULATE HOT AND COLD PIPING ABOVE THE FLOOR WITT1 1" OR LOCAL CODES.
THICK FIBERGLASS INSULATION WITH ALL SERVICE JACKET.
NO PLASTIC PIPE ALLOWED. 6. CONTRACTOR SHALL REVIEW ALL LANDLORD REQUIREMENTS AND INSTALL A R C H I T E C T U R E DESIGN
P. THIS CONTRACTOR SHALL CAP ALL UNUSED PLUMBING LINES ASSOCIATED WITH THE ALL MATERIALS AND EQUIPMENT AS DIRECTED BY T1IE LANDLORD'S Montrrat•St-Lanes ofi
LEASED SPACE AS REQUIRED BY THE LANDLORD AND LOCAL INSPECTION AUTTICRITIES. REPRESENTATIVE AND AS REQUIRED BY TTiE LEASE DOCUMENTS.
CONTRACTORS SHALL VERIFY THE REQUIREMENTS BEFORE SUBMITTING V&olInc.
114EIR BID. 4521 rueC'Luk Ca
Sj�te 300
Mojtrzal[Qicbacl
C'snada 142r 213
f 514 314 6611
F 514 8 i4-'6+6
x.r,v ariifica.cvm
G`�OUPe 4
v� 00
1 1
0
,4�D U G�
905 RUE HODGE
VILLE ST—LAURENT
QUEBEC, CANADA' HO 2B3
(514) 747-2536
FAX: (514) 747-7993
PROJET/PROJECT:
ALDO 5 pace# 154
5HOP5 AT SUNSET PLACE
_ 5OUTH� 1�1A_ MI, FLO
TITRE/TITLE:
SPECIFICATIONS 4 VETAIL5,
PROJET N0. PROJECT N0. DESSINf DRAWN: A
_A_SPM-01-00 S.R. L ;
ECHELLE/�SCALE: �- VERIFIE/C HECK ED:' _ , `e
1/4' — It-0"
OATS: t,_ `_/�._ -- ��1 — PAGEt
PLOT TIME NOV 01, 2000 [18:25) I+\2-Curnm\AJdo\S?ups of Sunset P!x*\A RCHITECTUP.AL\QESSJNS\C;7rEM\U612—El.dvI N01 01, 2OW M2 #
A