Loading...
00-0734-013 QJ NCY -I- I M CD M F- CD ri- JOHNSON L L- F�R ASSOC A S ARCHITECTS/PLANNERS //1 I i VO CI S AV W SS L��7 SHOPS SUNSEI- PLACE I -- - ----- - - - ---- - - DRAWINO I CODE RESEARCH COORDINATING INFORMATION ARCHITECTURAL/INTERIOR DESIGN DEMOLITION/FLOOR/FIXTURE PLAN A-1 MECHNICAL NOTES /PLAN M-2.1 GOVERNING CODE -- SOUTH FLORIDA BUILDING CODE, 1999 EDITION, ARCHITECT/ INTERIOR DESIGN CONTRACTOR TENANT REFLECTED CEILING /DEMOLITION PLAN A-2 ELECTRICAL NOTE/PLANS E-0.1 DADE COUNTY EDITION. INTERIOR ELEVATIONS A-3 LIGHTING PLAN E-2.1 PROJECT AREA -- 1604 SQ. FT. NAME: QUINCY JOHNSON ASSOCIATES NAME: NAME: VOICESTREAM WRELESS FINISHES AND SCHEDULE A-4 E-3.1 HEIGHT OF BUILDING -- ±25'-0" STANDARD DETAILS/NOTE A-5 P_ 1 I 949 Clint Moore Road 1121 South Military Trail#375 TRAVEL DISTANCE -- < 50'-0" W ADDRESS: Boca Raton, Florida 33487 ADDRESS: ADDRESS: Deerfield Beoch,Fl 33442 _ _ P-2.1 PHONE: (561) 997-9997 PHONE: PHONE: (801) 860-1168 TYPE OF CONSTRUCTION TYPE III FULLY SPRINKLERED -- I � C� OCCUPANCY CLASSIFICATION -- G(MERCANTILE) Z FAX: (561) 997-1610 FAX: FAX: (801) 979-0215 Q —. OCCUPANT LOAD -- 1,604-/200-= 8 PEOPLE < CONTACT Steve Myatt CONTACT CONTACT z PERSONS: Todd DeCarolis PERSONS: PERSONS Kevin Gromosaik Z O 1= U KEY PLAN L LIFE SAFETY/ GENERAL NOTES N.T.S. FIRE SPRINKLERS o G001, The General Contractor and all Subcontractors shall carry Public GO14. The Contractor shall coordinate all Owner or Tenant supplied items, and i - SPRINKLER SYSTEM SHALL BE VERIFIED AND IF REQUIRED MODIFIED BY AN APPROVED liability property , and Workmen's Compensation Insurance. Valid Certificates incorporate the installation into the construction schedule, verify the scope of { AUTOMATIC FIRE SPRINKLER CONTRACTOR WHO MUST SUBMIT COMPLETE of oil shail be provided to the Owner, such items prior to bid submittal. DENOTES PROJECT AREA ENGINEERED SPRINKLER PLANS AND HYDRAULIC CALCULATIONS SIGNED AND W G002• Prior to the submission of any bids the Contractor shall visit the G015. The Contractor shall schedule and coordinate all work with AMAX SEALED BY A REGISTERED PROFESSIONAL. FLORIDA ENGINEER THE SYSTEM 1--- project site and verify the Architects dimensions, details, and information Subcontractors ,suppliers, vendors and specialty contractors. 1 1 SHALL COMPLY WTH N.F.P.A. SECTIONS 13,14,20 AND ALL APPLICABLE SECTIONS O pertaining to the project. If any discrepancies, conflicting information, I �� wI OF THE SOUTH FLORIDA BUILDING CODE, 1996, BROWARD COUNTY EDITION, errors or omissions ore present, the Contractor shall notify the Architect GO16• The Contractor shall maintain supervision on site whenever work is ` __ and the Owner immediately. Any discrepancy, or conflict not brought being performed. I 1 71— 2. ALL SPRINKLER HEADS IN FINISHED AREAS SHALL BE CHROME {I to the attention of the Architect and Owner prior to the final bid submission 1 PLATED, PENDANT TYPE OR BUILDING STANDARDS. shall be corrected by the Contractor at no additional cost to the owner, GO17, The Contractor shall provide any temporary utilities including »mom' O electrical, water, and telephone required for the completion of the project. 3. THE CONTRACTOR SHALL PROVIDE AND INSTALL (1) 5 LB. ABC TYPE U.L. LISTED O 3003. Drowings conform to Shops at Sunset Place Tenant Design Handbook FIRE EXTINGUISHER PER 2500 S.F, LOCATION SHALL BE APPROVED BY FIRE Guidelines, and Declaration of Covenants, with some approved exceptions G018• The Contractor shall provide at all times protection from weather and t MARSHALL PRIOR TO INSTALLATION, excessive dust that may in any way damage the work, materials, fixtures, GO04. The Contractor shall include all work necessary to assure equipment, or present danger to personnel, Any work under contract by g.c. damaged sl I the projects compliance with the most stringent requirements of by a failure to provide adequate protection shall be removed and replaced with �_ ��/arbc D� 4, EQUIPMENT AND CONNECTIONS TO THE BUILDING FIRE ALARM CONTROL PANEL L r / SHALL BE PROVIDED, THE CONTRACTOR SHALL VERIFY THE BUILDING SYSTEM O the SFBC, current local edition, NFPA-101 or Standard B.C. whichever governs. new work or equipment at the Contractors expense, PRIOR TO BIDDING AND INCLUDE ALL REQUIRED ELEMENTS IN THE BID. I,7 Florida Accessibility Code for Building Construction, January 1994 edition, ---- li generally depicted G019. All work done by the Contractor, Subcontractors, Vendors, and specialty . L' with 1996 Ammendments and all other app cab e codes as ge y d p in these drawings. contractors shall exercise due care and skill in performing all work in regards LOCATION MAP to the project. All work shall be done in a neat workmanlike professional �'• Ji 0005 Dimensions as indicated on the drawings shall take precedence over manner and in accordance with all applicable codes, regulations and rules. Q scaling of the drawings. The dimensions indicated on the drawings are caiculatec by computer and rounded to the nearest inch. The location of 6020. The job site shall remain free from rubbish and debris. Disposal of all partitions to the centers of mullions or to align with finishes sholl take construction debris shall conform to building regulations, precedence over written dimensions when so noted. — SYMBOLS LEGEND G021. Each contractor shall protect the work of other contractors. 0006, The Contractor shall refer to the building shell drawings Any conflicts are to be resolved between the contractors involved and — for information relative to the building shell any work damaged shall be replaced by the contractor causing the damage. — N and for coordination, The Architect and the Owner shall be notified of such conflicts. _ T � NEW WALL/PARTITION ROOM NAME ' GC07. The Contractor and all Subcontractors and all vendors shall familiarize G022. The Contractor shall expedite the delivery of long lead time items to EXIT R E Q U I R E- M E N��S - — — — — — - EXISTING WALLS TO BE REMOVED 00 themselves with and conform to any and all requirements set forth by the insure delivery conforming to the construction schedule. The Contractor will _ - — — — — — - LO 6Y ROOM/AREA IDENTIFICATION SYMBOL building cwner or municipality relative to the hours of work, provide and install all equipment, fixtures, appliances, furnishings, etc. unless i CD specifically noted otherwise on the Contract Documents. Monufocturers EXISTING WALL/PARTITION OR r -° GOOB. The work shall be limited to the scope reasonably inferred in the Contract p y ITEM TO REMAIN - NO WORK, Roots NUMBER Documents. No additional work shall be executed without the prior written installation instructions and specifications shalt be strictly adhered to, and DETAIL NUMBER are considered a part of the Contract Documents. approval of the Owner and Architect. Any additional work done without prior DOOR TYPE MARKER written approval shall be at the sole expense of the contractor. 0023. Upon completion of the project, issuance of the occupancy certificate 0 TO 30 PERSONS 1 EXIT REQUIRED N 1 PP P P P P J P y DETAIL NAME O SEE SHEET A-3 FOR SCHEDULES and acceptance by the Owner, the Contractor shall provide the Owner with SHT• DETAIL REFERENCE G009• Should the scope of work for any reason not be fully indicated on the all equipment maintenance and instruction manuals and warranties Contract Documents the Architect should be contacted immediately. 30 TO 50 PERSONS TWO EXITS REQUIRED DOOR MAY SWING ' G024. Upon completion of the work the Contractor shall provide the Architect SHEET ADDRESS 0 ,f t, - PARTITION TYPE MARKER p p p INTO THE SPACE 0-- �' f GO10, The Contractor shall obtain all permits, and secure all with a set of "as built" marked plans, The Electrical Contractors as built SEE SHEET A-4 FOR SCHEDULES �- IDENTIFICATION NUMBER � certificates of inspection and occupancy that are required by the governing drawings shall be included. These drawings shall be transmitted to the owner, 1 DETAIL SYMBOL jurisdiction• The O�:ner shall receive a copy of the permit upon issuance, G025. The Contractor shall warrant and guarantee all work, equipment, MORE THAN 50 PERSONS TWO EXITS REQUIRED DOOR MUST DENOTES EXISTING DOORS SHEET NUMBER G011, The contractor shall submit a detailed construction schedule, fixtures, doors, windows, hardware, etc, for a period of one year from the dote •. coordinating all subcontractors, suppliers, and vendors, of completion as evidence by the certificate of occupancy unless otherwise SWING WITH PATH OF EGRESS. 1DENTIF)CAnoN NUMBER required. (5 yr, for a/c/ compressors, 15 yr, for roof.) G012. The Contractor shall not allow on the project, any materials containing SECTION SYMBOL G026. The Contractor shall be responsible for correcting any work that is not _ asbestos, petroleum or PCB. All fireproofing must likewise be free of the above described materials. in conformance with the Contract Documents. The Contractor shall also be EGRESS REQUIREMENTS SHALL COMPLY WITH NFPA 101 CHAPTER 5 SHEET NUMBER DENOTES NEW DOORS responsible for the correction of faulty workmanship or materials within the SECTIONS 5-2.1 AND 26-2.2, 2. ALL HARDWARE SHALL COMPLY WITH G013. The Contractor shall be responsible for obtaining and distributing warranty period. The Contractor shall not be responsible for the all current drawings to all Subcontractors and vendors during the duration of correction of work that has been abused or neglected by the Owner or his SECTION5- 2. 1 .5,1 FOR LOCKING REQUIREMENTS the project. The Contractor shall maintain on site in a convenient location, representatives. a complete set of the signed and sealed permit documents, including all the latest revisions, addendum, shop drawings and supplemental information as may be required for proper execution of the project.