Loading...
00-0495-011 Z5 uT Ff 6 W CJN2mV) ++ r_+ M PO U, to Q O Q v N General Notes r. ` h , •� 228'-0" E N o � Contractor shall verify all dimensions and conditions at site before 51'-10" 62'-2" 51'-10" v+Z M •E o construction begins. 62'-2" � v'�° All construction shall comply with S.F.B.C. Plan C, Lot 7 _ _ _ _ G - - - 28-� - 5'-°"" W Clearing: remove organic and other deleterious materials, including 5'_0 i 28"- �" �° 5'-0" - 28"-6° � T designated trees, roots, etc. From the affected site. 2,240 sf building I - -- - -I- - - - I - - -� 3 Bedroom - Iy 1 � � �y I I >y 1 � y Q Areas to be covered by buildings slabs on fill, and all areas under ° �' 1 V' I otherwise required, 5,367 sf lot Size _ paving scarified to a minimum depth of 6 and as q ,n 0 - I to remove stumps, roots etc. Complete work before starting ti i o \ - -I I o N I o' p p 9 900 g septic tank foundation work. Remove all trash and other deleterious materials 330 sf drainfield L - - - - 1 L I I Q from site and stockpile approved materials for site grading. 330 sf reserve _ Excavation: Excavate footing trenches to depths indicated on architectural drawings and details. Relocate excavated material. I Backfill under foundation is strictly prohibited. Plan B, Lot 8 All wood in contact with concrete shall be pressure treated. 2,240 sf building - I I I ul }p _ _< I \ \ . . 3 Bedroom °� Lumber used shall be identified by the grade mark of an approved / I \ i 1 1 I I I U U Q0 Lumber grading, or inspection bureau or agency. Stress-grade 4,475 sf lot SIZe ° ' 1 I I ' i \ 1 _) U CO lumber shall conform to the "National Design Specifications for 900 septic tank AA Stress- rade Lumber and Its fastenin g P - L - - - I I I 1 I I i Q Stress-grade g 330 sf drainfield / 1 1 I I 1 / 1 ►� All structural framing members to be 1,500 psi minimum extreme 330 sf reserve 1 1 / - -I - - - - - - - I U ao \L - - - - - - - - - - - - - - - - �\ I U fiber stress in bending (Southern Pine No. 1). I ° ° ° o i All concrete in contact with ground to be 2,500 psf ® 28 days. ' "I - - T - I L � ' L1� - T - - i � � - - T - - ' U Plan A Lot 9 Concrete above ground to be 3,000 psf ® 28 days. 1 1 1 � 0 1 I oo I \ I- I ( I U -� 2,240 sf building I > � a) \ I � cn 1 a, � 1 ( > � acn Reinforcing steel shall conform to the requirements of ASTM A615 ' g 00 i �i I i 1 ' I L -� I L J I 3 Bedroom of 1 � � 1 .� � s- 5'- specifications for new deformed billet steel and to grade 60 specs o ° - °, - " with a min. Yield strength of 60,000 psi. It shall be detailed, 5 367 sf lot size "'� N I o �� o cv ( �, I o�� I U) 9 P � I I , I I I I I I I I i LL fabricated and placed as recommended by ACI. welded wire fabric 900 g septic tank I � (w.w.f.) and shall conform to ASTM. a-105 double w.w.f. 36" on each L 1 - -J - - 330 sf drainfield - ?° 8," - 20'-8J" o , � ' side of bearing walls and 30" around perimeter of monolithic footings. I of I � � (� •- Concrete masonry units shall be load bearing type conforming to 330 sf reserve _ _ _ _ _ ASTM C90 mortar shall conform to ASTM C270, type M. secured with approved I I U All roof joist, outlookers, beams shall be s pp I metals ties, clips and anchors to tie beams. - ' i • ao I Use aluminum nails only for all exterior wood work. I I N I N All stucco scratch coats shall be allowed 24 hours drying period. I 1. I SEPTIC TANK G ( 0 GAL. N ' Burglary Intrusion Notes �j ' r- - - - - - - �`� � (PrIIN) � � o Drainfield DRRIIv�PEILD Z�`� c 1 Drainfield 1 Swinging exterior doors and doors connecting garage areas with living areas shall be secured with a latch and single dead bolt with 1" i I 214 SF I� I 214 SF - I i minimum throw, or a combination and latch and dead bolt set as - - - - - - follows: swinging entrance doors to individual units should comply with 5-0 Reserve Reserve I- 3602.2 a herein and shall be secured as set forth in ''14 SF - - - - - - - - - ( - - - - - - - - - 1 214 SF I i Plan C, Lot 3 paragraph ( ) Plan C, Lot 6 I 9000 _ sub-paragraph 3603.2(a)(1), or by combination dead latch and - 1 \ - - - T I i 1 9000 - - - 1 - - hardened dead bolt sets or dead bolt which contains an insert, each 2,240 sf building 1 \ T 2,240 sf building — — — — T 1 iN� 1 ;, t3 �1 X AI; �AND with 1 minimum throw. At least one such entrance door shall be 3 Bedroom 22-,0° 5" 5 Bedroom 4 - - - - - - - provided with a door scope or vision panel complying with I / a° i 3 �0` 5 988 sf lot SIZe sub-paragraph 3603.2(e)(1)(dd) of S.F.B.C. 5,988 sf lot SIZe N I 1 ° L - i - [ f� 900 septic tank '� - - - �' � - - - I 1 . ., • 900 g septic tank �.��.. is r � €` �.� d 9 P ° Drainfield I 1 � . I _ �` I t : tal 428 sf drainfield areas with living I I I Dra nfield o Swinging exterior doors and doors connecting garage 9 Total 428 sf drainfield N 1 214 SF I, I areas shall comply with paragraph 3603.2(e) as follows: swinging m - - _ - - 1 Total 428 sf reserve doors shall be of solid core, flush construction, and shall be not less Total 428 sf reserve I - - - - - - —Im & than 1 3 8" in thickness. Swinging doors of stile, rail and panel ( s Reserve I I I Reserve 5_ 3 I SEPTIC TANK GA (MIN) / 9 9 construction shall have rails and stile not less than 1 3/4" inches in 214 SF al;=� _ .4• SF 00 � I I I � � i l I thickness with retaining tongues or splines not less than 3/8" in least L- - - - - - - -- — — — — — � � I � �RAINFEIL��.2r � so. .(r�IN) dimension. Main entrance doors shall be provided with a door scope I I ILI or vision panels complying with paragraph 3603.2(f) of S.F.B.C. locks 22-,°'" s-°' S-°" 2 a. on exterior doors shall be a minimum of 6000 possible key changes or locking combinations - - - - -- - _- - _- - o I W . � — — — — — — --� — — — — — — — — Drainfield C I) E Drairfeld - - - - - - - - F__ __1 7 - - I 214 SF 5-0 o U 5. �.. 214 SF I - - - -200C I 1 9000 - -1 1 - � � . - U - - - - - - -- 1 I- T , i T I - - - - - Plan B, Lot 2 c Plan B, Lot 5 I Reserve I� I _ _ - - _ _ _ _ -4 _ - - - - - - - ._ I Reserve I 2,240 sf building •� 2,240 sf building 214 sF - - - - - - - - - J o I I 1 0 . - ° N I 3 Bedroom �- 3 Bedroom o -- - - - - - � 4 993 sf lot size � � 4,993 sf lot size 22�-,°. 5-- Buil in 2 1 o Drainfield Drainfield ° Bu dl 1 s ° 22-,° I 3 LL I 214 sF I, I : I 214 sF I I 900 g septic tank 900 g septic tank 1 I Total 428 sf drainfield � I - - 41- Total 428 sf drainfield z O s o Reserve 1 Reserve I Total 428 sf reserve N N Total 428 sf reserve 1 214 SF 1 I I 1 214 SF I 1 I .� Ln ' I 1- - - - - - - -J i i 1- - - - - - - -J z '� 1 I 22'-1 0 ( / I i I ' I I I �90OG� L900G_J- - - - I 1 - - - -� � I � T � I I I ' I - - - - 1- - - - - =_-- - 03. 13.2000 - - --- - - - - -I - - - - a I I 1 _ L _ — — — — 1 Plan A, Lot 1 Revisions Plan A, Lot 4 N 1 �- I 11 I 1 2,240 sf building 2,240 sf building N I I I rainfield Drainfiel 1 1 I Al2.20.2000 3 Bedroom N U' I 1 1 214 SF 1 ( I 214 SF - I 1 3 Bedroom I I— I t size 5._ .. 1 1 6,470 sf to 6,470 sf lot SIZe 1 - Reserve 1� 1 Reserve I 1 900 septic tank 900 septic tank 214 SF 1 I s o" 22'-10 I 9 P g P I zz._,0„ 5.V 21 4 SF Total 428 sf drainfield 1 I- - - - - - - 1 - - - - - - - �' 1 F_ - - - - - -� Total 428 sf drainfield I— Total 428 sf reserve Total 428 sf reserve — / ( 22'-r°° 5'-0 22'-'°° 1 Reserve 1 j Reserve 1 1 1 I 214 SF s-0'" 5. �.. 14 S F 1 m Drainfield p I Drai:4.ielci I I 214 SF 1 I SF I i � I � I rt 5� in — - -- - - - - - I I - - - - - - - J 0 1 0 N I 1 32'-10" 30'-8" 32'-10" 32 -10" 32'-10" Sheet 1 of 30 �A G �2 (D-A-ii-tre/Septic Plan scale 1/16" = 1'-0" _ Cam: