Loading...
00-0495-007 W- N qh rM ++ p General Notes 2 � M r- Q o a v N N T 228'-0" ,n - -4 0 Contractor shall verify I r °� e y a I dimensions and conditions at site before � , - construction begins. 62'-2" 51'-10" 62'-2" 51 '-10" Q o,z M E o ma' °- r All construction shall comply with S.F.B.C. - 1L' a -�_ O :3 Plan C Lot 7 _ _ – – - - � - - - - - - - - Clearing: remove organic and other deleterious materials, including ' -6° _ W 240 sf building designated trees, roots, etc. From the affected site. �, - - -- -- c ° g I � I � �I 3 Bedroom - ;; �-� �� v � I I Areas to be covered by buildings slabs on fill, and all areas under o - > �� > v _ paving scarified to a minimum depth of 6" and as otherwise required, 5,367 sf lot Size to remove stumps, roots, etc. Complete work before starting 900 g SeptlC tank foundation work. Remove all trash and other deleterious materials sf drainfield � – - L - - - -- from site and stockpile approved materials for site grading. - 330 - I I Q 330 sf reserve I Excavation: Excavate footing trenches to depths indicated on - - - - - -I I - - - - - - architectural drawings and details. Relocate excavated material. Backfill under foundation is strictly prohibited. Plan B, Lot 8 All wood in contact with concrete shall be pressure treated. 2,240 sf building _ �/ 1U1� 1g--3� � Bedroom °° I 3 Bed I Lumber used shall be identified b the rode mark of an approved I I � � I Lumber grading, or inspection bureau or g agency. Stress-grade 4,475 sf lot Size ° I �I ' � lumber shall conform to the "National Design Specifications for 900 septic tank ''�� 00 Stress rode Lumber an I fastening" 9 P / 3 Stress-grade d is asten ng _ - � _ i I �— 330 sf drainfield O All structural framing members to be 1,500 psi minimum extreme -1 330 sf reserves - fiber stress in bending outhern Pine No. 1 . oo 9 ( _ I . o o i o o � � � U All concrete in contact with ground to be 2,500 psf ® 28 days. -- i T I _ -'� F -- T' -I I ' Concrete above ground to be 3,000 psf ® 28 days. Plan A, Lot 9 �� �`�� (� O 2 240 sf building I Reinforcing steel shall conform to the requirements of ASTM A615 00 i � U, � U-, � specifications for new deformed billet steel and to grade 60 specs 3 Bedroom I _ - - °', - O - with a min. Yield strength of 60,000 psi. It shall be detailed, 5,367 sf lot size �� c� I I O7 Q fabricated and laced as recommended b ACI. welded wire fabric P y I � � I I I 900 septic tank �- (w.w.f.) and shall conform to ASTM. a-105 double w.w.f. 36 on each g P " 330 sf drainfield -- �- -- side of bearing walls and 30 around perimeter of monolithic footings. -� - Concrete mason units shall be load bearing type conforming to masonry g yP g 330 sf reserve I _ _ _ _ _ _ _ _ _ _ _ (n - -�- ASTM C90 mortar shall conform to ASTM C270, type M. i �7 —� i All roof joist, outiookers, beams shall be secured with approved metals ties clips and anchors to tie beams. I •- P � I I I l\ Use aluminum nails only for all exterior wood work. N All stucco scratch coats shall be allowed 24 hours drying period. - - - - - - - - - - - - - - Burglary, Intrusion Notes ' I I I � I i I' I - � Swinging exterior doors and doors connecting garage areas with ,living o I Crai eld Drainfield areas shall be secured with a latch and single dead bolt with 1 4 SF 214 5F 9 i I minimum throw, or a combination and latch and dead bolt set as �- - - - -{_ - follows: swinging entrance doors to individual units should comply with F'es�rJe ��' -° Reserve paragraph 3602.2(e) herein and shall be secured as set forth in Plan C Lot 6 T 4 SF - - - - - - - - - I - 21 4 SF I Plan C, Lot 3 sub-paragraph 3603.2(a)(1), or by combination dead latch and I A - -�9u0c, I I �9 C�� � � �� - - 2 240 sf building hardened dead bolt sets or dead bolt which contains an insert, each 2,240 sf building - T T T ' with 1" minimum throw. At least one such entrance door shall be / I s °" �'-' 3 Bedroom s _ _ __ 3 Bedroom provided with a door scope or vision panel complying with 5 988 sf lot SIZe 5,988 sf lot size I �� ;� �� �0 sub-paragraph 3603.2(e)(1)(dd) of S.F.B.C. N \, ' 900 g septic tank ; �� �I T I 900 g septic tank Swinging exterior doors and doors connecting garage areas with living N I o Drainfield I 1 =,rainfiel� o Total 428 sf drainfield Total 428 sf drainfield I areas shall comply with paragraph 3603.2(e) as follows: swinging � 214 SF i i 2 4 SF ,�� Total 428 sf reserve doors shall be of solid core, -- - flush construction, and shall be not less Total 428 sf reserve � - --{-� --- � ; than 1 3/8" in thickness. Swinging doors of stile, rail and panel i �� \� ° °' Reserve I i I I I � F� serve construction shall have rails and stile not less than 1 3/4" inches in I 214 SF i i 14 �F thickness with retaining tongues or splines not less than 3/8 in least L- - - -- - - dimension. Main entrance doors shall be provided with a door scope or vision panels complying with paragraph 3603.2 f of S.F.B.C. locks P O on exterior doors shall be a minimum of 6000 possible key changes i +' or locking combinations _ _ _- _ _ _ _ _ _ _ _ - - _ __- - - - � • - i .- � T� Drcinfield En E �'rainfiel_ '' - - - - - - - � - � �� 21 4 SF � �a0( I I �' ,GG T 2 4 SF s- O •0 Plan B, Lot 5 I � � � �� � i � T � ' � T ---� I � � � - Plan B Lot 2 � �- O 2 240 sf building ; PTe – – � /– – – �- – - _-_ – – - – – ; – Rene 2,240 sf building � ' g - F O �' 3 Bedroom f- 3 Bedroom o O • % 4 993 sf lot size +J — 4,993 sf lot size .I _- – - Buil�n 2 0 Drainfield Drainfield o Bu� di 1 s �� , LO 214 S� I 900 g septic tank 3 900 septic tank �� 9 P – – I I T z � O Total 428 sf drainfield s – �� �5 _ Total 428 sf drainfield N �� � Reserve � Tser��e Total 428 sf reserve ! \ 21 SF I I L , 4 SF Total 428 sf reserve Z C,O -- T-77 IC TANK 0 Ct1L.(MiN) I I _ INFEILD SO.FT,(MIN) T o J k - - - _ - -- -- _ t� �h =.-OF LOAMY CID D 03. 13.2000 y – ��--- � eT >a OF n Plan A Lot 1 Plan A Lot 4 \ i- F r ' Revisions 2,240 sf building � � ra�nfieia �___.-_ j% ��� ��d' 2,240 sf building N Drain el- 3 Bedroom LO I 21 4 SF '14 _F ° ' ' L BE t, 3 Bedroom 1 12.20.2000 6,470 sf lot size -°•, e er e I 6,470 sf lot size n R serve �� 2 4 SF s �� zz,--° 900 septic tank � 4 P 900 septic tank _ �� SF 9 1� 5'- \ o I i , Total 428 sf drainfield ainfield Total 428 sf drainfield – – �- I I �L-- --- Total 428 sf reserve --'I ` � otal 428 sf reserve _ _ z A T i, _ ;' Reserve 21 + � [51_3_ 2' 4 SF 5�= i 1' 1 7 SE TIC TA11Y.�L GAL.(T':IN) I+ �, � 'i ° ":^ �i,� j I �=f iE�D 4 � I'=I' -- -oSC.F T.(MIN) DRAIN 1 �, i r ° ,fir D F . w � 7F 77 c f%i`d. 1 B 32'-10" 30'-8" 32'-10" 32'-10" 0'_-81 -# 32'-10" Sheet 1 of 30 i ry � G! i t _ -: Site/Septic Plan ��� 4A Cwl B 7 Scale 1/16' = 1'-O" ,mil IA