Loading...
00-0332-023 ma o CA 'p e .. o cow co �U %C.. C CC S Cr Z w LL w .0 Cr N rd..,'Q g X�, D_..4..�G...?e.. . PLUMBING LEGEND PLUMBING GENERAL NOTES PLUMBING SPECIFICATION a U- ° J SAN SANITARY DRAM A. m UNLESS OTHERWISE SPECIFIED ON THIS DRAWING CONTRACTOR SHALL 1. GENERAL: m W J REFER TO ORIGINAL LANDLORD SPECIFICATIONS FOR ALL APPLICABLE 44 SAN EXISTING SANITARY DRAM REQUIREMENTS, NOTES, DETAILS, CONSTRUCTION'S STANDARDS, ETC., MATERIAL SHALL BE NEW, UNUSED, BEST OF THEIR RESPECTIVE KINDS AND ■L 0 3 - - - V SANITARY VENT LINE INSTALLATION WITH LANDLORD REQUIREMENTS PRIOR TO ORDERING AND/OR FREE FROM DEFECTS IN WORKMANSHIP; IN CONFORMANCE WITH THE LATEST o INSTALLATION OF ANY EQUIPMENT AND ACCESSORIES SHOWN. PUBLICATIONS IN FORCE AT TIME OF BIDDING. 0 ui a o V EXISTMG SANITARY VENT LME IB a cn It 1. SITE INVESTIGATION: 2. PIPE AND FITTINGS: _ Z A. SANITARY SOIL AND VENT PIPING: SERVICE WEIGHT CAST IRON BEEL x3 •t SD SD STORM DRAM ■r ° EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK; THE BIDDER IS AND SPIGOT PIPE AND FITTINGS, ASTMA74-75: NO HUB CAST IRON PIPE SD SD EXISTING STORM DRAIN REQUIRED, BEFORE SUBMITTING HIS PROPOSAL, TO VISIT THE SITE OF THE AND FITTINGS, CISPI. 301-72, OD DWV. COPPER PIPE WITH CAST BRASS OR $ PROPOSED WORK AND FAMILIARIZE HIMSELF/HERSELF WITH THE NATURE AND WROUGHT COPPER SOLDER JOINT FITTINGS, ASTM. 8306-79, (ABOVE GROND) C �g W --- IW INDIRECT WASTE (SAFEWASTE) EXTEND OF THE WORK AND ANY LOCAL CONDITIONS THAT MAY IN ANY MANNER VENTING AS HERIN BEFORE SPECIFIED OR GALVANIZED THREADED STEEL WITH W _ m C Cn AFFECT THE WORK TO BE DONE AND EQUIPMENT, MATERIALS AND LABOR MALLEABLE IRON FITTINGS. J o a IW EXISTING INDIRECT WASTE (SAFEWASTE) REQUIRED THEREFORE. SINCE THE WORK INVLOVES EXISTING BUILDINGS SYSTEM N id AND FACILITIES, SPECIAL CONSIDERATION SHALL BE GIVEN TO EXAMINATION OF B. DOMESTIC WATER SUPPLY PIPING: COPPER PIPE TYPE 'L' WITH BRONZE E N G CD CONDENSATE DRAM LINE WORKING CONDITIONS, EXISTING FACILITIES AND ALL BUILDING STRUCTURES OR WROUGHT COPPER SOLDER JOINT FITTINGS, ASTM.888-78. a O TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS. VARIATIONS IN a C CD EXIStMG CONDENSATE DRAIN LINE C. CONDENSATE PIPING: AS HEREIN BEFORE SPECIFIED FOR SANITARY n- ROUTING AND/OR CONSTRUCTION SHOULD BE ANTICIPATED BY THIS SOIL, WASTE AND VENT PIPING. o w uJ pit_PTR PRESSURE AND TEMPERATURE RELIEF LINE CONTRACTOR AND ARE EXPRESSLY INCLUDED AS PART OF THE WORK WHENEVER REQUIRED AT NO ADDITIONAL COST TO THE OWNER. IGNORANCE ON THE PART 3. JOINTS AND METHODS OF CONNECTION: P! z 1=4T PTR PRESSURE AND 1EnmERATURE RELIEF LINE OF THE CONTRACTOR WILL IN NO WAY RELIEVE HIM OF THE OBLIGATION AND A. CAST IRON BELL AND SPIGOT PIPE: COMPRESSION GASKET. INSTALL PER RESPONSIBILITIES ASSUMED UNDER THIS CONTRACT. G CxAS LINE MANUFACTURER'S RECOMMENDATION. GASKET AND PIPE BY SAME MANUFACTURER. G 2. THE NATURE OF THE REMODEL TYPE CONSTRUCTION POSES SPECIAL G GAS LINE PROBLEMS FOR THE DESIGN ENGINEERS AS WELL AS THE PLUMBING B. DWV COPPER PIPE: JOINT WITH 95-5 TIN-ANTIMONY SOLDER. INSTALL CONTRACTOR. EVERY EFFORT HAS BEEN MADE BY THE ENGINEERS TO SHOW AND PER MANUFACTURER'S RECOMMENDATIONS. GW COLD WATER LINE IDENTIFY THE LOCATIONS AND TYPES OF EXISTING PLUMBING SYSTEMS. THE C. TYPE 'L' COPPER TUBE: JOIN WITH 95-5 TIN-ANTIMONY SOLDER. INSTALL CW COLD WATER LINE MAJOR PORTION OF THE PLUMBING SYSTEMS ARE AS SHOWN ON TIME DRAWINGS PER MANUFACTURER'S RECOMMENDATIONS. HOWEVER DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. D. STEEL PIPE: -- 14W 440t WATER LINE PLUMBING CONTRACTOR SHALL PERFORM A FIELD VERIFICATION BEFORE a, THREADED JOINTS: AFTER CUTTING AND BEFORE THREADING, REAM BIDDING THIS PROJECT. 14W 140T WATER LINE ALL PIPE AND REMOVE BURRS. MAKE JOINTS WITH JOINT COMPOUND APPLIED 3. CONTRACTOR WILL BE RESPONSIBLE FOR COODINATING HIS DEMOLITION TO MALE THREADS ONLY. ---- - HWR HOT WATER RECIRCULATING LINE WORK WITH OTHER TRADES, AND TO PROTECT FROM DAMAGE EXISTING SYSTEMS b. FLANGED JOINTS: STANDARD WEIGHT, 150 P.S.I. STEEL, WITH APPROVED TO REMAIN. RED RUBBER GASKET OR NEOPRENE RUBBER GASKET, INSTALL AS PER - - -- - HWR HOT WATER RECIRCULATING LINE MANUFACTURER'S RECOMMENDATIONS. -Da-- GV GATE VALVE 4. CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF EXISTING'PIPES BEFORE COMMENCING TO WORK AND MAKE MODIFICATIONS AS REQUIRED 4. UNIONS AND FLANGES: .� CV CHECK VALVE WITHOUT ADDITIONAL COST TO THE OWNER. A. COPPER PIPE: BRONZE UNIONS FOR 2 INCHES AND SMALLER. FOR 2-1/2 BALANCING VALVE 5. ALL PIPING SHALL BE INSTALLED RECESSED IN BLOCK WALLS. CHASES INCHES AND LARGER USE BRONZE FLANGED CONNECTIONS 150 POUND CLASS. OR PARTITIONS. -�-• HB HOSE 15188111/ VACUUM BREAKER B. DIELECTRIC UNIONS OR FLANGES: UNIONS SHALL MEET DIMENSIONAL T 6. EXISTING PIPES SERVING AREAS NOT COVERED BY THIS CONTRACT BUT REQUIREMENTS AND TENSILE STRENGTH OF PIPE UNIONS IN ACCORDANCE WITH AC AIR CHAMBER IN SERVICE AT THIS TIME SHALL NOT BE INTERRUPTED EXCEPT AS iA FED. SPEC. WW-U-531 E. UNIONS OR FLANGES SHALL BE SUITABLE FOR TEMPORARY INTERRUPTION COORDINATED WITH THE OWNER AND LANDLORD. REQUIRED OPERATING PRESSURES AND TEMPERATURE CONDITIONS. UNIONS SA SHOCK ARRESTOR (P.D.I. SIZE 'A' SHALL HAVE METAL CONNECTIONS ON BOTH ENDS. ENDS SHALL BE THREADED TYPICAL UNLESS NOTED OTHERWISE.) 7. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND OR SOLDERED TO MATCH ADJACENT PIPING. METAL PARTS OF UNION OR CONNECTION CHARGES REQUIRED. FLANGED SHALL BE SEPAREATED TO PREVENT CURRENT FLOW BETWEEN CO GLEAN-OUT PLUG DISSIMILAR METALS. EPCO DIELECTRIC PIPE FITTINGS OR EQUIVALENT. 8. PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND - � WCO WALL GLEAN-OUT DIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATIM DF 5. ESCUTCHEONS: B CNTE CONNECT TO EXISTING MATERIALS AND EQUIPMENT. CHROME PLATED OR STAINLESS STEEL WITH SET SCREWS FOR HOLDING ® FD FLOOR DRAIN 9. COORDINATE ALL WORK WITH OTHER TRADES. SECURELY IN PLACE. USE ESCUTCHEONS ON PIPES PASSING THROUGH WALLS, U > r- VTR VENT THRU ROOF 10. PLUMBING CONTRACTOR SHALL GUARANTEE ALL WORK FREE OF DEFECTS IN FLOORS AND CEILINGS OF FINISHED AREAS. _J Q AP ACCESS PANEL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM :DATE OF 6. PIPE INSULATION: � (� FOS FUEL OIL SUPPLY ACCEPTANCE. +, 4� FOR FUEL OIL RETURN A. ALL CONDENSATE LINES SHALL BE INSULATED WITH 3/4" FIRE RETARDANT 0 FOV 11. PROVIDE SHOCK ABSORBERS SIZE. QUANTITY AND LOCATION AS PER ARMAFLEX INSULATION WITH A MAXIMUM OF 25/50 FLAME SPREAD AND SMOKE co CLEAN OUT FUEL OIL VENT P.D.I. STANDARDS. - DEVELOPED RESPECTIVELY. CO m W � WCO WALL CLEAN OUT 12. PROVIDE SHUT-OFF VALVE FOR EACH GROUP OF FIXTURE AND EACH B. ALL HOT WATER LINES SHALL BE INSULATED WITH 1" FIRE RETARDANT FCO FLOOR CLEAN OUT FIXTURE SUPPLY. ARMAFLEX INSULATION WITH A MAXIMUM OF 25/50 FLAME SPREAD AND SMOKE CTG CLEAN OUT TO GRADE DEVELOPED RESPECTIVELY. .� O FDC FIRE DEPT. CONN. (SIAMESE) 13. WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FH FIRE HYDRANT FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES. 7. INSTANT WATER HEATERS SHALL BE OF THE CAPACITY AND ELECTRICAL m FHC FIRE HOSE CABINET CHARACTERISTICS INDICATED ON PLANS AS MANUFACTURED BY INSTAHOT. (� FVC FIRE VALVE CABINET W/ HFV 14. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL ROUGH-INS U FEC FIRE EXTINGUISHER CAB. W/ FE WITH THE MANUFACTURER BEFORE MAKING ANY INSTALLATION. S. TRAP PRIMERS: U Q FE FIRE EXTINGUISHER > Q - FE/CO FIRE EXT./CARBON DIOXIDE 15. POTABLE HOT AND COLD WATER SYSTEMS SHALL BE "LEAD FREE' WITH A. REMOTE LOCATION: SELF PRIMING TYPE ON COLD WATER SUPPLY LINE yam-- E WH WATER HEATER LEAD CONTENT NOT EXCEEDING 0.2 PERCENT FOR SOLDER AND FLUXES AND 8 AS MANUFACTURED BY PRECISION PLUMBING PRODUCTS, INC. "PRIME-RITE" Q C N UG UNDER GROUND PERCENT FOR PIPE FITTINGS. FIXTURES AND TRIM. CONTRACTOR SHALL #PR-500. WHEN TWO OR MORE TRAPS REQUIRE PRIMING PROVIDE WITH - O DIP DUCTILE IRON PIPE VERIFY MANUFACTURER'S COMPLIANCE. 1STRIBUTION UNIT JDU-2, 3 OR 4 AND SUPPLY TUBE JSS-8 ASSEMBLY. . - CMP CORRUGATED METAL PIPE PROVIDE ACCESS PANEL AND INSTALL PER MANUFACTURER'S RECOMMENDATION. CIP CAST IRON PIPE 16. ALL POTABLE HOT AND COLD WATER SYSTEMS SHALL BE FLUSHED CLEAR. TP TRAP PRIMER (RESEALER) STERILIZED WITH AN APPROVED SOLUTION AND THROUGHLY FLUSHED OF ALL B. TOILET ROOMS: z A/C AIR CONDITIONER RESIDUAL SOLUTION AFTER FINAL PRESSURE TESTS AND WITH ALL TRIM AND TH THERMOMETER CONNECTIONS INSTALLED. a. FLUSH VALVE: DELANY IT38 TRAP PRIMER ATTACHMENT IN FLUSH od CONNECTION. - 4­1 FHV FIRE HOSE VALVE 17. PROVIDE SHUT-OFF AND VACUUM BREAKER TO ALL HOSE BIBBS AND Q :3 AHU AIR HANDLING UNIT FAUCETS WITH HOSE-END CONNECTIONS. b. SINKS/LAVATORY: JOSAM #88250-10, POLISHED CHROME PLATED O CLG CEILING TRAP SEAL PRIMER VALVE ON COLD WATER SUPPLY LINE. O O UG UNDERGROUND 18. ALL FLOOR DRAINS SHALL HAVE TRAP PRIMERS TO PROTECT THE SEAL OF O V)THE TRAP. 9. FLOOR DRAINS: AS MANUFACTURED BY ZURN, J.R. SMITH OR JOSAM. 19. PVC PIPING IS NOT ALLOWED IN RETURN AIR PLENUMS. IF RETURN AIR A. FD: JOSAM 30003-S SERIES WITH 6"x6" SQUARE NIKALOY TOP AND 1/2" PLENUMS ARE USED. CONTRACTOR SHALL REPLACE ALL EXISTING PVC PIPING WITH TRAP PRIMER CONNECTION. CAST IRON OR COPPER PIPING. 20. DRAINAGE SYSTEM DESIGN IS BASED ON 1/8" PER FT. MINIMUM FALL, ANY FOR PIPES 3" OR LARGE AND 1/4- PER FOOT MIN MUM FALL FOR PIPES 2" OR SMALLER, ANY DEVIATIONS SHALL BE APPROVED BY ARCHITECT/ENGINEER. 21. ALL VENT THROUGH ROOF OPENINGS SHALL BE OFFSETED TO A MINIMUM DISTANCE OF 3'-0" FROM PARRAPET WALL OR ROOF EDGE. SEE ARCHITECTURAL DRAWINGS FOR ROOF FLASHING. LEAD FLASHING WILL NOT BE ACCEPTED. 11 /27/01 Revisions PLUMBING NOTES AND SYMBOLS- Project 9933alem pml x 0 O, a Seal (AR16320)