00-0332-017 r,
a f
W _ U.._�...v... :..�..E
Sp ui
m• �h tcCNMtfl V
a►.l w V O t0 dl
VENTILATION FAN SCHEDULE HVAC NOTES �,.� W
uJ Z Q o � o
UNIT DESIGNATION EF-4 EF-5 EF-6 1 THE WORK THAT S TO BE DONE UNDER THIS HJIDING INCLUDES THE FURNISHING i E t° a
ELEV. MACH. BASEMENT OF ALL LABOR, MATERIALS AND EQUIPMENT PERMITS, FEB. INSPECTIONS, TEST, 8' Y m ., ° z' 'E',
AREA SERVED SEE PLAN ROOM VENTILATION INSURANCE. ETC., REQUIRED FOR THE COMPLETION OF THE NR CONDITIONING z ' C N ° r7 a
�.. c0...�.. .E
HATING AND VENTILATION SYSTEMS SHOWN ON bRAWINGS OR LISTED BELOW. � Q r-. � o
OPERATING WEIGHT LBS. 36 16 260 a
LOCATION SEE PLAN SEE PLAN SEE PLAN 2 THE DRAWINGS ARE GENERALLY WMAMMATIC. THEY DO NOT SHOW EVERY a
.s
BEND. OFF-SET. ELBOW OR OTHER FITTINGS WHICH MAY BE REQUIRED FOR THE 25 NOT USED m
INSTALLATION IN THE SPACE ALLOCATED. OR FOR COORDINATION WITH OTHER
FAN TYPE IN-LINE CLG. MNTD. WALL-CENT TRADES. 26 FIRE DAMPERS SHALL BE INSTALLED WHERE INDICATED FOR ALL DUCTS PENETRATING
FIRE BARRIERS. DAMPERS SHALL BE DYNAMIC TYPE CONSTRUCTED AND INSTALLED L 0 3
3 DRAWINGS ARE NOT TO BE SCALED. UNLESS SPECIFIC DIMENSIONS ARE SHOWN. TO CONFORM TO REQUIREMENTS OF N.F.PA 90-A AND U.L. 555. FIRE DAMPERS
TOTAL AIR CFM 600 250 4000 °z o
DRIVE TYPE DIRECT DIRECT DIRECT THE ARCHITECTURAL AND/OR STRUCTURAL DRAWINGS, AND SITE CONDITIONS SHN1. BE 100x FREE AREA WITH BLADE OUT OF NR STREAM AND U.L LSTED. ACCESS
SWILL GOVERN EXACT LOCATION OF MECHWICAL EQUIPMENT AND PANELS SWILL BE PROVIDED FOR REPLACEMENT OF FUSIBLE LINK. Lu "
FAN WHEEL TYPE CENTRIF. CENTRIF. CENTRIF. APPURTENANCES. _
2189 2996 3316 27 MANUAL VOLUME DAMPERS ABOVE REMOVABLE CEILINGS (EX. 2' X 4' LAY-IN TILE) am e u 9 Q
FAN TIP SPEED RPM MAX o
SHAM BE AS MANUFACTURED BY RUSKIN, MODEL MD-25 FOR DUCTS UP TO 12 n
FAN SPEED,RPM 1325 1500 517 4 INTENT: HIGH AND MODEL MD-35 FOR LARGER DUCTS. _ 8
TOTAL STATIC PRESSURE.IN. OF H2O .250 .125 .25 A. IT IS THE INTENT OF THE PUNS AND GENERAL NOTES TO PROVIDE A m -I nw
FAN MOTOR HP NON OVERLOAD 1/4 1/12 _____172_ COMPLETE AND OPERATING INSTALLATION INCLUDING ALL NECESSARY 28 FLAME AND SMOKE RATING: ALL INSULATION PRODUCTS USED INSIDE THE W m W o 0
ITEMS REQUIRED. EVEN THOUGHT ITEMS ARE NOT INDICATED ON THE BUILDING SHALL HAVE A MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM
FAIN MOTOR STARTER TYPE - - - SMOKE GENERATION OF 50 IN ACCORDANCE WITH TESTS OUTLINED IN N.F.PA
DRAWINGS OR IN THE NOTES. WORK CONSIDER NECESSARY FAR THE
STARTER FURNISHED BY - - - COMPLETION OF THE WORK IN PROPER MANNER NOT SHOWN ON THE #255.
Cc
ELECTRICAL SERVICE AVAILABLE 120-1-60 120-1-60 120-1-60 PINTAS OR NOTES SHALL BE BROUGHT TO THE ATTENTION OF THE
MASONRY OPENING REQUIRED - - Vp�� / 29 NOT USED o W
ARCHITECT ENGINEER IN WRITING PRIOR TO BIDS OTHERWISE WORK SHALL 3 w
BE ADDITIONAL CHARGED AFTER BID IS AWARDED.
z
DESIGN MANUFACTURER COOK COOK COOK
MODEL NUMBER GN-720 GC-180 245W5B 5 DEFINITIONS:
30 NOT USED
SERVICE SWITCH YES YES YES A. PROVIDE - MEANS TO FURNISH AND INSTALL.
SMOKE DETECTORS - - - B. UNDER THIS SECTION - MEANS IT IS THE RESPONSIBILITY OF THE
FIRE DAMPER - - - CONTRACTOR AND IS TO BE DONE BY AND PAID FOR BY THE CONTRACTOR.
CONSTRUCTION STEEL STEEL ALUMINUM
MULTIBLADE BACKDRAFT DAMPER YES YES YES c. BY THIS SECTION - MEANS IT IS THE RESPONSIBILITY OF THE CONTRACTOR
AND IS TO BE DONE BY AND PAD FOR BY THE CONTRACTOR. INDOOR AIR 31 VIBRATION ISOLATORS
BIRDSCREEN _ _ YES WANT PRECAIl11ONS:
SOLID STATE SPEED CONTROL YES 6 INDOOR AIR QUILLITY PRECAUTIONS: A ALL EQUIPMENT SHALL BE PROVIDED WITH VIBRATION ISOLATOR INSTALLED
THERMOSTAT CONTROL - YES - AS RECOMMEND BY EQUIPMENT MANUFACTURER AND DESCRIBED HEREIN.
FACTORY FABRICATED CURB MODEL NO. - - - A. THE CONTRACTOR SFUILL ALLOW FOR NECESSARY VENTILATION DURING
SONES 3.5 5.5 7.7 CONSTRUCTION TO AVOID INDOOR AIR POIWTION.
X1
Am B. THE CONT SWILL PREPARE WRITTEN DIRECTION BY WHICH THE
1. ALL FANS SHALL BE AM R CA CERTIFIED. BUILDING ,OR ITS REPRESENTATIVE WILL BE ABLE TO OPERATE THE
VENTILATION SYSTEMS AT ITS OPTIMAL LEVEL
7 OUTDOOR AIR QUALITY PRECAUTIONS:
A. THE CONTRACTOR 'SHALL ALLOW FOR NECESSARY PRECAUTIONS DURING 32 CONTROLS:
CONSTRUCTION AND THEREAFTER FOR THE INSTALLATION AND HANDLING
OF REFRIGERANTS. THE CONTRACTOR SHALL PREPARE WRITTEN A ALL ELECTRIC WIRING AND CONDUIT SWILL BE PROVIDED BY THIS
DIRECTIONS BY WHICH THE BULDING OWNER OR ITS REPRESENTATIVE CONTRACTOR.
WILL BE ABLE TO HANDLE REFRIGERANT IN A SAFE AND APPROVED 33 NOT USED Q)
MANNER.
8 PROVIDE OWNER REPRESENTATIVE WITH THREE WARD BOUND SETS OF SYSTEM C:
OPERATING INSTRUCTIONS FOR ALL EQUIPMENT INCLUDING CONTROLS. SUBMIT 34 NOT USED
COPY A,TO ARCHITECT ENGINEER CONTROLS. SUBMIT COPY A TO > �-
AIR CONDITIONING LEGEND ARCHITECT/ENGINEER T KIR TO FINAL PAYMENT REQUISITION. � �� BEM SHAT BE COMPLETE IN ALL RESPECTS INCLUDING ALL LABOR, U > �
SYMBOL DESCRIPTION MATERIALS. EQUIPMENT AND SERVICES NECESSARY TO MEET THE FUNCTIONAL
AH U AIR HANDUNG UNIT 9 FINN TO ARCHITECT/ENGINEER E�CT/ENGINEER R REVIEW PRIOR TO FINAL PAYMENT �� DESCRIPTION. 4-J
REQUISITION. A FURNISH MO INSTALL ALL SENSORS. ACTUATORS AND EQUIPMENT 0 -H-�
BIM. BOTTOM �I�p, � (n �
COND. CONDENSATE 10 A. HVAC EQUIPMENT AIR DISTRIBUTION, FANS MATERIALS, ETC.. SWILL BE AS 0) (f)
C.U. CONDENSING UNIT LISTED HEREIN I�WD/OR SHALL BE AS SCHEDULED ON THE DRAWINGS. 38 PROVIDE ALL REQUIRED RELAYS, CONTACTORS AND CONTROLS FOR INTERFACE � �
CONC. CONCRETE WITH FIRE ALARM SYSTEM SMOKE CONTROL SYSTEM. •L
B. MANUFACTURERS USE R THE BASIS OF DESIGN ARE LISTED ON THE 37 THERMOSTATS SHALL BE LOW VOLTAGE WITH FAN MO SELECTOR SWITCHES ON •� O
CFM CUBIC FEET PER MINUTE DRAWING SCHEDULE. ANY OTHER MUST MEET OR EXCEED ALL SPECIFIED SUB-BASE MOUNT WHERE SHOWN ON DRAWINGS AS PER A.DA REQUIREMENTS.
E.F. EXHAUST FAN REQUIREMENTS. ' NAMING ACCEPTABLE ME WITHCALL DE DOES NOT PROVIDE KEY LOCK PLASTIC GUARD COORDINATE PROPOSED LOCATION WITH m E (n �--
RELIEVE CONTRACTOR FROM COMPLIANCE WITH ALL DESIGN FINAL INTERIOR DESIGN LAYOUT.
F.L.A. FULL LOAD AMPS REQUIREMENTS WON ON DRAWINGS OR LISTED HEREIN. N U)
F.P.M. FEET PER MINUTE 38 ALL EQUIPMENT AND MATERIALS SHALL BE GUARANTEED FOR THE PERIOD OF ONE 0
11 CUT ALL �
OPENINGS, CHASES TRENCHES, ETC. REQUIRED TO ACCOMMODATE THE YEAR. FURNISH 90 DAYS FREE SERVICE. 4-
H.P. HORSEPOWER WORK UNDER THIS DIVISION AND REPAIR ALL WILLS. ROOF. ETC. DAMAGED BY .�
H.R. HOUR SUCH CUTTINGS. ALL WORK DONE UNDER THIS HEADING MUST CONFORM IN
EVERY RESPECT TO FINISH ANO QUALITY OF MATERIALS AND WORKMANSHIP IN. INCH SPECIFIED UNDER APPROPRIATE SECTIONS R 1�HIS BUILDING. 39 All FAN DRIES SHALL BE ADJUSTED TO DELVER THE SPECIFIED CFM AGAINST 0
K.W. KILOWATT THE ACTUAL STATIC PRESSURE OF THE INSTALLATION. N _
12 VERIFY:ALL VOLTAGES WITH ELECTRICAL CONTRACTOR BEFORE ORDERING ANY
LBS. POUNDS 40 ALL WORK SHALL BE COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID z
EQUIPMENT. INTERFERENCE WITH PROGRESS OF CONSTRUCTION AND IN STRICT COMIRMICE
MAX. MAXIMUM
RK AND EQUIPMENT FOR WITH ALL APPLICABLE CODES AND STANDARDS. od
MVD MANUAL VOLUME DAMPER (OPPOSED BLADE) 13 SUBMIT SHOP DRAWINGS OF ALL MATERIALS. W0TWO — -4--J
NO. NUMBER REVIEW BE ARCHITECT/ENGINEER PRIOR TO FABEICATION AND/OR INSTALLATION. 41 ALL OUTSIDE EQUIPMENT SWILL BE SECURED TO WITHSTAND 150 MPH WINDS. Q O
O/A OUTSIDE AIR 14 CONTRACTOR SHALL VERIFY SPACE CONDITIONS /AND DIMENSIONS AND SHALL 42 TESTING. 0
COORDINATE WORK WITH ALL OTHER TRADES AT JOB SITE PRIOR TO FABRICATION 0
RPM. REVOLUTIONS PER MINUTE AND INSTALLATION OF DUCTWORK. THE CONTRACTOR SHALL BE RESPONSIBLE O
R/A RETURN AIR
FOR THE FULL COORDINATION OF THIS WORK WITH THAT OF ALL OTHER TRADES. A. CONTRACTOR SHALL BE RESPONSIBLE TO TEST AND BALANCE THE SYSTEM
TO ACHIEVE RATES AS SHOWN ON PINTS AND SCHEDULES. TEST/BALANCE I�
REF. REFRIGERANT 15 OBTAIN FULL INFORMATION REGARDING PECULIARITIES AND UMITATKONS OF RESULTS SWILL BE SUBMITTED TO ARCHITECT/ENGINEER R REVIEW
RTU. ROOFTOP UNIT SPACE AVAILABLE FOR 1NSTALIATION OF THE EQUIPMENT AND MATERIALS UNDER PRIOR TO FINAL PAYMENT REQUISITION.
S A SUPPLY AIR THIS CONTRACT, AND PROVIDE READY ACCESSIBILITY TO DAMPERS, VALVES AND B. SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK AND EQUIPMENT
/ OTHER.APPARATUS, WN LUDING ANY PART OF SYSTEM REQUIRED TO BE REACHED FOR REVIEW PRIOR INSTALLATION MID/OR FABRICATION.
TEMP. TEMPERATURE FOR MAINTENANCE AND OPERATIONS.
"A" AIR DISTRIBUTION DESIGNATION C. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF
HVAC DESIGN REQUIRES: YES NO 16 NOT USED THE S.F.B.C. CODE, DADE COUNTY EDITION, NFPA 90A AND
Q THERMOSTAT ALL APPLICABLE LOCAL CODES AND ORDINANCES.
DUCT SMOKE DETECTOR SUPPLY OR OUTSIDE AIR DUCT SECTION
FIRE DAMPER(S) EXHAUST OR RETURN AIR DUCT SECTION 17 VENTILATION AND TOILET EXHAUST DUCTWORK SFVLLL BE CONSTRUCTED OF ZINC
—� OPPOSED BLADE MANUAL VOLUME DAMPER COATED GALVANIZED SHEET METAL CONSTRUCTED, IN ACCORDANCE WITH THE
SMOKE DAMPER(S) -� SIDEWALL REGISTER WITH AIRFLOW ARROW LATEST A.S.H.RAE. GUIDE AND S.MAC.NA RECOMMENDATIONS.
FIRE RATED ENCLOSURE CEILING DIFFUSER WITH AIR FLOW ARROW 18 ALL DUCT SIZES SHOWN ARE CLEAR INSIDE (AIRSIDE) DIMENSIONS.
FIRE RATED ROOF/FLOOR 16= IAQ. SOUND LINING
19 NOT USED
CEILING ASSEMBLY � �"� ELBOW UP (SUPPLY OR OUTSIDE AIR)
FIRE STOPPING � � ELBOW DOWN (SUPPLY OR OUTSIDE AR) 20 PAINT EXTERIOR OF ALL EXPOSED EXHAUST AIR DUCTWORK WITHIN THE
BUILDING WITH TWO COATS OF PAINT. COLOR SHALL BE AS SELECTED BY 11 /27/01
+� ELBOW UP (RETURN OR EXHAUST AIR) ARCHITECT DUCT SURFACES SHALL BE CLEANED,'DEGREASED AND TREATED AS
SMOKE CONTROL ELBOW DOWN (RETURN OR EXHAUST AIR) REQUIRED TO ACCEPT PAINT. Revisions
izo 90' ELBOW W/TURNING VINES 21 NOT USED
rVNMNIW FLEXIBLE DUCT (INSULATED R-6 MIN.)
SQD DUCT MOUNTED SMOKE DETECTOR 22 ALL DUCT ELBOWS SHALL BE FITTED WITH TURNING VANES.
-may UNDER CUT
23 PROVIDE ACCESS PANELS IN ALL WALL AND CEILINGS FOR ALL VALVES, CONTROL Project
DEVICES, ETC. ACCESS PANELS SHALL BE MILCOR FLUSH TYPE, MINIMUM OF 24"
X 24' INCHES UNLESS NOTED OTHERWISE. 9 9 33 a l e m
PROVIDE DUCT ACCESS DOORS ADJACENT TO ALL FIRE DAMPERS, SMOKE DAMPERS,
SMOKE DETECTORS FOR PROPER INSPECTION, MAINTENANCE IUD RESETTING OF THE
DEVICE. PROVIDE MIN.,1/2 INCH LETTERING R IDENTIFICATION.
24 INSULATION:
A. PIPING - CONDENSATE PIPING SHWl
BE INSULATED WITH 314' FIRE RATED FLEXIBLE FOAM INSULATION. FINISH
WHERE EXPOSED WITH 2 COATS OF WHITE LATEX PAINT AS PER THE i
MANUFACTURER'S INSTRUCTION.
heel: 1 '' 7
M MECHANICAL NOTES AND SCHEDULES
Se {,AR16320)
i