08-05-08 Item 2bINCOR POR 1927 O R Y CITY OF SOUTHMIAMI MEMORANDUM To: Ajibola Balogun, City Manager From: Ricardo Soto - Lopez, MUP oe�� Planning Director Date: July 30, 2008 Re: Site Visit to Red Road Commons 7.29.2008 d. (b On July 29th, 2008, I toured the Red Road Commons construction site with Victor J. Citarella P.E. Building Department Director, Sandy Youkilis. AICP Planning Consultant, Lourdes Cabrera - Hernandez Project Planner, and James McCants CRA Community Outreach Coordinator. We met with the general contractor's superintendent Dennis Jardine at the construction site. The purpose of the visit was to ascertain that the project was being constructed at the proposed heights detailed in the construction documents on file with the Buildings Department. These plans were reviewed by planning staff the Environmental Review & Preservation Board, and approved by the City Commission. A signed Development Agreement dated March 29d`, 2007 is on file which also guides the construction of the project. The subject property is located at the city's boundary limits, west of SW 57 Avenue (Red Road) and City of Coral Gables on the east. The site is bordered by four different zoning districts which include Low Density Multi - Family (RM -18), Single Family Residential (RS -4) to the north, Transit Oriented Development District—Light Industrial-4 (TODD LI- 4) to the south, and Public/Institutional (PI) to the west. The design consists of three, four and five story buildings with apartment units, office, retail space, parking garage, swimming pool, a gazebo and landscape areas throughout the site. The buildings which have been constructed to date include: e The buildings facing the SW 66 Street corridor: Building "A" (three - stories), these are directly across the street from the RS -4 district; • Building "D" (four - stories), an entry plaza, and the landscape area will also be constructed adjacent to this building. These buildings are located across the street from the RM -18 district. • The buildings facing the SW 57 Avenue (Red Road) corridor: Building "E" (four stories), Building "D" (four stories) with retail and colonnade • The parking structure (five stories) which is adjacent to the existing Florida Power and Light facility (PI zoning district) has also been constructed. The balance of the buildings to be constructed includes: • The buildings facing SW 68 Street corridor: Building "C" (five stories), abutting zoning district TODD -LI4 • The buildings facing the interior of the development: Building `B" (five stories) with swimming pool located at the rear of the building. A gazebo is to be located between Building "C" and `B ". During the site visit Staff found nothing to indicate that the project's height has' deviated from the construction documents on file and what was recommended to and approved by the City Commission. CC: Victor J. Citarella P.E., Building Department Director Sandy Youkilis AICP, Planning Consultant, Lourdes Cabrera - Hernandez, Project Planner Stephen David, CRA Director James McCants, CRA Community Outreach Coordinator RSL My Documents: Memo to City Manager -Site Visit to Red Road Commons 7.29.2008